The Subject Of The Contract Is A Comprehensive Performance And Launch Of Fiber Optic Network In The 9Th Student House Of The Lodz University Of Technology Together With Connecting It To The Existing Telecommunications Infrastructure Of The Lodz University Of Technology. The Implementation Of Ftth Fiber Optic Installation Throughout The Building Includes Both Vertical (From The Distribution Point) And Horizontal Infrastructure (To Individual Residential Rooms). The Ftth Installation Will Be Intended For All Users (Residents) Of The 9Th Student House.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.