1. The Subject Of The Investment Is: 1) A Change In The Main Method Of Heat Generation For The Needs Of Which By Using A New Heat Source, I.E. Air-Water Heat Pump With Heating Power At Mina 20 Kwt. The Existing Pellet Boiler Is Expected To Be Used During Periods Of Increased Thermal Power Demand. In Addition, The Necessary Additional Works Will Be Carried Out (Including A System Of Full Automation, Plumbing, Monitoring And Security With The Use Of A Co -Buffer Co) .2) Change In The Way Heat Production For The Needs Of Hot Water. By Using Air-Water Heat Pump With Heating Power Min. 3.00 Kwt.3) Installation Of A Solar Installation With A Total Power Of 24.96 Kwp. 4) Execution Of An Energy Warehouse With A Capacity Of 20.00 Kwh Together With The Bms/Ems.5 Battery Management System) Performance Of Other Accompanying Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.