2. The Subject Of The Contract Is The Performance Of The Order In The Formula Design And Build, The Effect That Will Be The Modernization Of The Boiler Room Along With The Installation Of Heat Pumps And Photovoltaic Panels In The Psp Building In Kołobrzeg. As Part Of The Implementation, It Should Be Made:- Project Documentation, Which Will Be The Basis For Obtaining Permits Required By Law. - Disassembly Of The Existing Gas Boiler Room, - Assembly Of A New 100 Kw Condensing Gas Boiler With An Exhaust Gas Drainage System, - Modernization Of A Gas Installation Connected To The Existing Gas Meter, - Renovation Of The Boiler Room Room, - Assembly Of 2 Ground Heat Pumps Brine/Water With A Power Of 60 Kw Each (Total Power Of Pumps 120 Kw), - Execution Of About 25 Wells With A Depth Of 100 Wells With A Depth Of 100 Wells Each Meters,- Connecting A Modernized Boiler Room To The Existing Central Heating Installation. Along With The Replacement Of The Heating Pipeline Connecting The Modernized Boiler Room With The Main Administrative, Garage And Workshop Building,- Assembly Of A Photovoltaic Installation- With A Total Power Of About 50 Kw,- Dismantling Of The Existing Heater. Hot Water With A Capacity Of About 350 Dm3,- Installation Of Air Conditioners,- Replacement Of Window Joinery In A Warehouse And Garage Building. The Concise Range Of The Subject Of The Contract Was Specified In The Description Of The Subject Of The Contract, Which Is A Functional And Utility Program, Which Is Annex No. 1 To Swz. 3. In All Places Of Swz Or Attachments In Which An Example Trademark, Patent, Origin, Source Or Special Process Were Used, Or If The Employer Described The Subject Of The Contract By Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, This Is Justified By The Specificity Of The Subject Of The Contract And The Contracting Authority May Not Describe The Subject Of The Contract With The Help Of Sufficiently Accurate Terms, And In Each Case, Acting In Accordance With Art. 99 Para. 5I Art. 101 Para. 4 Of The Public Procurement Law, The Contracting Authority Allows Equivalent Solutions Described, Indicating Such Indications Or Reference With The Words Or Equivalent Or Or Equivalent (Including The Use Of Other Materials And Devices), Provided That Parameters Are Not Worse Than Those Specified In The Description Of The Subject Of The Contract, As Well As Maintenance Technology, I.E. As A Result Of Changing The Material, The Performance Technology May Not Change, As Technical. The Contractor Must Prove That They Meet All Requirements For The Class, Quality Of The Standard, Etc., Specified In The Description Of The Subject Of The Contract, Presenting, For Example, Appropriate Declarations Of Conformity, Certificates, Certificates Of Permits And A Detailed Description Of The Equivalent Material Used.