. The Subject Of The Contract Is The Implementation Of Project And Cost Documentation For: Task No. 1-,, Preparation Of Project And Cost Documentation For The Modernization Of Żwirowa Street In Polanów Road From Jomb Boards With A Width Of 3.0 M. On A Length Of 150.0 M Foundations Of Stabilized Broken Aggregate And On Sand Bed, With Filling Holes, Joints And Space Between Panels 0-10 Mm. Occupation No. 2-Development Of Project And Cost Documentation For The Modernization Of Młopy Street In Polanów. 8 Cm With A Width Of 4.0 M And Length 115.0 Mb. The Ankle Should Be Laid On A Broken Aggregate Foundation. Street Inlets Should Be Taken Into Account As Dehydration Of The Road And Attached To The Rainwater Sewage System. Task No. 3- Development Of Project And Skirting Documentation For The Modernization Of Partyzancka Street In Polanów Road From Jomb Plates Reinforced With A Width Of 3.0M And A Length Of 91.0 Mb, With Connection. The Plates Are To Be Laid, After Rubbing, On A Foundation Of Broken Aggregate And On Sand Bed, With Filling Holes, Welds And Space Between Plates 0-10 Mm.3.2. The Scope Of The Order Includes, In Particular: • Obtaining At Your Own Expense The Subject Of The Contract Necessary To Perform The Subject Of The Contract (E.G. Reports, Reports, Maps For Design Purposes, Related Projects), Research, Arrangements, Technical Conditions, Decisions, Permits, Expertise, Opinions, Necessary Geological Documentation (If Required) And Deviations From The Applicable Provisions Enabling The Provisions Enabling The Building Permit (If Required); Land Use - 4 Copies For Each Task; • Construction Project - 4 Copies For Each Of The Parts; • Executive Design - For 4 Copies For Each Of The Parts; • Study Stwior - All Industries - After 2 Copies For Each Part; • Preparation Of Information About Bioz; • Preparation Of Investor Costs With Integrated Elements, A Pre -Emptive And Investor Cost Estimate Without Price (So -Called Zero - Copies For Each Part; • Transfer Of The Subject Of The Order In The Editable Version, E.G. Doc, Dwg, Ath And Pdf And The Cd Version - After 2 Copies For Each Of The Parts; • Twice Updating The Investors Cost Estimate At The Request Of The Contracting Authority; • Providing Authors Supervision Service.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.