Units Generator - Supply Of Power Generators. 3 Aggregates Must Be Equipped With Szr Automation (Self -Attachment Of The Reserve), Have The Necessary Technical Documentation And Manufacturers Warranty. The Employer Allows The Offer Of Devices Of Various Manufacturers, Provided That The Technical Requirements Set Out In Swz Are Met. 2. As Part Of The Order, The Contractor Will Be Obliged To Provide Aggregates In The Number And With The Parameters Indicated In The Table Below: No. Prp Power [Kw] Quantity Of Fuel Consumption [L/H]* Fuel Tank [L] Noise Level [Db (A)/7M] Dimensions Max. [Mm] Mass Max. [Kg] 1 Min.27 1 Max. 9 Min. 65 Max. 70 Max. 2500 × 1000 × 1550 Max. 1150 2 Min. 30 9 Max. 9 Min. 85 Max. 70 Max. 2500 × 1000 × 1550 Max. 1150 3 Min. 33 1 Max. 9.5 Min. 100 Max. 70 Max. 2500 × 1050 × 1500 Max. 1150 4 Min.50 15 Max. 16 Min. 120 Max. 75 Max. 2600 × 1300 × 1600 Max. 1250 5 Min.127 1 Max. 40 Min. 300 Max. 75 Max. 3600 × 1400 × 2150 Max. 2700 * Fuel Consumption At 100% Prp. 3. Each Aggregate Must Meet The Following Minimum Requirements: 1) Three -Phase, Rated Voltage 400 V, Frequency 50 Hz; 2) Avr Voltage Stabilization: Max. ± 1 %; 3) Power Factor: Cos Φ = 0.8 (Inductive); 4) Brushless Synchronous Generator; 5) Liquid Cooling; 6) Integrated Fuel Tank With A Capacity For Min. 8 Hours Of Work With 80% Prp Power; 7) Automation Szr (Ats): Full Function Of Automatic Power Switching; 8) Control Panel: Expensive Hours, Voltage, Power, Frequency, Alarms; 9) The Ability To Work In Manual And Automatic Mode; 10) Ip Protection Degree: Min. Ip23, Aggregates Adapted To Work Outside; 11) Electric Start With A Battery Charger; 12) Sound Absorbing Housing, Resistant To Weather Conditions; 13) Minimum Technical Load: Min. 30% Prp. 4. Each Aggregate Should Be Accompanied By: 1) Declaration Of Ce Compliance, 2) User Manual (Polish), 3) Electrical Diagram (Including Szr), 4) Launch Protocol. 5. Delivery Conditions: 1) Transport, Unloading And Setting To The Indicated Place Determined By The Contracting Authority On The Part Of The Contractor; 2) Place Of Delivery: Addresses Indicated By The Employer In The City Of Starogard Gdański; 3) Implementation Deadline: Maximum 30 Days From The Date Of Signing The Contract; 4) Required And Transfer Of Aggregates For Use With Free Service Training. 6. Warranty And Service: 1) Warranty: Minimum 24 Months, Maximum 60 Months; 2) Service Response Time: Max. 48 Hours; 3) A Mandatory First Review Of 100 Hours During The Warranty Period At The Contractors Expense.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.