Construction Work For Buildings Relating To Air Transport-New Dpaf Creation T2ek_Lot Second Work And Technical Recovery Corps. Implementation Of Covered Clos And Primary Energies Of The New R+4 Building Of The Order Of 18,500 M². The Market Is Cut Mainly Into Technical Batch Defined As Follows: - Metallerie Sublot And Interior Locksmith - Sublot Carpentry - Sublot Partitions, Dubbing And Suspended Ceilings - Sublot Painting - Soft Soft Coverings - Sublot Floor Covering, Hard Walls - Low -Voltage Sublot - Cfa Sublot The New Paf Arrivities Will Benefit From This Space Will Be Particularly Careful In Order To Limit This Space. Linconfort Linked To Noise. For This Purpose, Vertical Facings Will Be Dressed With Micro-Perforated Wooden Panels. Dune Generally, The Choice Of Materials Is On The Use Of Two Emblematic Materials: Carrare Marble Of The Cau Sol Type, Light Wooden Wood In Vertical Facing And False Ceiling. The Ceiling Is An Essential Device For The Success Of The Atmosphere Of The Area It Is Coated By The Assembly Of Two Noble Materials: The Staff And The Wood The Staff Will Indeed Be Intended For The Implementation Of A Global Device Of Ribs Connecting The Posts Between Them. The Profile Of These Ribs Will Be Treated With Care Indeed As A Softened Cornice And The Junction With The Pillars Will Be Carried Out Indeed From A Re -Entrant Throat Making The Top Of The Structures Disappear. In Relation To This Huge Staff Grid, The False Ceiling Will Be Made In A Tablecloth Of Wood Panels Identical To Vertical Facings
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.