1) The Subject Of The Contract Is The Comprehensive Implementation Of The Investment In The Formula Design And Build, Based On The Functional And Utility Program (Pfu), Including The Development Of Project Documentation And Modernization-Reconstruction Of The Poviat Road Ul. Kaliska In Sulmierzyce. It Has Its Origin From The Intersection With The Municipal Road Ul. Młyńska2) The Scope Of The Contract Includes The Performance Of All Necessary Design And Construction Works, Which Will Be To Modernize The Poviat Road In Sulmierzyce Street Kaliska Street In Plots With Numbers 2254/1, 2710/1, 2710/2, 3187 3) The Contractor Is Obliged To Perform All Necessary Design Studies Along With Necessary Opinions And Obtain On Behalf Of The Ordering Necessary Decisions, Permits, Permission Or Opinions Others Organs, As Well As Other Documents Required By Special Provisions. 4) Quantity And Form Of Project Documentation: A) Construction Design Of The Road Industry: 4 Copies Of The Original In Paper Form, B) Executive Design Of The Above -Mentioned Industries: 3 Copies Of The Original In Paper Form, C) Technical Specification Of The Execution And Receipt Of Construction Works: 3 Copies Of The Original In Paper Form, D) Project Of Traffic Organization For Construction: 3 Copies Of The Original In Paper Form, E) Geodetic Inventory Of The Permission: 2 Copies. Original In Paper Form, F) As -Built Documentation: 2 Copies Of The Original In Paper Form; Each Of The Above Documents Should Also Be Submitted In The Form Of Electronic Pdf - Cd Or Pendrive. 5. The Effect Of These Works Is To Be Carried Out And Completion Of Construction Works On The Designed Road. 6. The Detailed Material Scope Of Design Works, Preparatory Works And Construction Works Provided For Execution As Part Of The Contractors Duties Is Presented In The Content Of The Functional And Utility Program (Pf). 7. The Works Constituting The Subject Of The Contract Will Be Carried Out At The Section Of 1140 M. It Has Its Origin From The Intersection With The Municipal Road Ul. Mill Scope Of Work Includes: 1) Measuring Works - Restoration Of The Road Lane2) Earthworks3) Layer Cutting Mechanically Compacted From Stabilized Ground Rm = 2.5Mpa Gr. 10Cm4) Foundations Of Mechanically Stabilized Broken Aggregates 25Cm5) Surface Made Of Mineral And Asphalt Mixtures 6Cm Binding Layer Ac16w 50/706) Surface Made Of Mineral And Asphalt Mixtures. 5Cm Cover Layer Ac11w 50/707) Spring Of The Surface Between Layers 8) Restoration Of Roadside Ditches9) Bilateral Hardening Of The Roadside From Broken Fractions 0/31.5 Mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.