Construction Site Supervision Services-25Fei81945_Büw_Estw Inlet Route Dortmund Ii_Pt West. As Part Of The Estw Tinning Route Dortmund Ii - Planning Section West, The Equipment Of The Üst Do -Rahm And The Adjacent Sections Of The Route With New Signaling Technology Is Realized. The Existing, Availability-Critical Signaling Technology Of The Existing Stw Abzw Rahm On The Üst Is Replaced. The Existing Signal Box Rahm Km 17.760 (2210) Is Abandoned, And No Estw-A Building Is Planned For The 2210 Route. The Existing Signal Box Dzf In Dortmund Hbf (Estw-Z) Is Expanded To Include The Üst Do-Rahm Branch, The Position Units Are Integrated Directly Into The Existing Stw Dzf.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.