1. The Subject Of The Order Are Works Consisting In The Care Of Treetops And Removal Of Trees And Shrubs In The Jarocin Commune In 2025, In Particular The Works Consisting Of: 1) Care Of Treble Crown: A) With A Trunk Circumference Up To 50 Cm At A Height Of 130 Cm (Range: 60 Trees); B) With Trunk Circumference From 51 To 100 Cm At A Height Of 130 Cm (Range: 200 Trees); C) Trunk Circumferences Above 101 Cm At A Height Of 130 Cm (Range: 500 Trees); 2) Cutting Trees With A Trunk Circumference Up To 100 Cm At A Height Of 130 Cm With Trunks (Range: 120 Pcs. Trees), 3) Cutting Trees With A Trunk Circumference Above 100 Cm At A Height Of 130 Cm With Trunks (Range: 40 Trees), 4) Trunks (Range: 5), 5), 5), 5) Removing Shrubs Along With Tidying The Terrain And Backfilling Of Pits (Range: 150 M2), 6) Technical Cutting Of Shrubs, I.E. Pruning Branches: Colliding With Infrastructure, To Improve Visibility In Road Lanes And Other (Range: 5500 Mb). 1. The Actual Number Of Completed Works Will Depend On The Needs, And The Determination Of The Maximum Value Of The Contract In The Contract Cannot Be The Basis For Claims By The Contractor. 2. Requirements For The Implementation Of The Subject Of The Contract Consisting In The Performance Of The Works Included In § 1 Para. 1 Should Be Implemented In Accordance With The Following Documents: 1) Annex 1 - Technical Specification Of The Execution And Acceptance Of Works In Terms Of Works Regarding The Ongoing Maintenance And Care Of Green Areas In The Jarocin Commune; 2) Annex 2 - Specification Of The Contract Terms (Hereinafter Referred To As Swz). 3. The Contracting Authority Will Send The Contractor The Scope And Deadline For The Work Included In § 1 By E -Mail. 4. The Contractor Undertakes To React, I.E. Start Work From Reporting By The Ordering Party, The Need To Perform The Works Included In The Description Of The Contract Within The Date Of The Declared Working Days From The Day Following The Order Of The Order By The Contracting Authority. 5. The Contractor Is Immediately Obliged To Inform The Contracting Authority After Accepting The Order After Accepting The Order Or By Sending A Message To The E-Mail Address Of The Employer About Any Circumstances Known To Him Preventing Or Hindering The Execution Of The Order. 6. The Contractor Is Obliged To Comply With The Customers Instructions And Instructions. 7. After Completing The Work, The Area Around The Area Should Be Sorted Out Immediately, And The Wood Created As A Result Of Cuts Should Be Taken To The Place Indicated By The Contracting Authority. 8. The Contractor Is Obliged To Perform Works That Are The Subject Of The Contract In Accordance With Currently Applicable Law, Current Technical Knowledge And Gardening Art, Due Diligence And Based On Applicable Standards And In Accordance With The Guidelines Of The Ordering Party. 9 The Contractor Bears Full Responsibility For Improper Adaptation To The Recommendations Of The Employer, Which Will Damage Or Destroy Tre
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.