Overhead Line Construction - Realization Of Construction “Innovation Of V404 Varín - St. Border Of Sr/Czech Republic”. The Subject Of The Contract Is The Construction Of The Work: “Innovation Of V404 Varín - Št. Border Of The Slovak Republic/Czech Republic. The Border Of The Slovak Republic, The Construction Of A New 1X400 Kv Management In The Corridor Of The Original Route Of The Current V404 Line, With The Exception Of Several Local Deviations In Accordance With The Final Building Permit, Related Activities, Elaboration Of Documentation For The Implementation Of The Construction (Drs), Workshop Documentation And Documentation Of Actual Execution Of Construction (Dsv) “Innovation Of V404 Varín - Št. Border Of The Slovak Republic/Czech Republic”. The Contractor Implements The Subject Of The Contract In The Range Of Min.: In The Construction Of The New 1X400 Kv Management And Related Activities, It Is Mainly: 1.Place Material, 2. Construction And Assembly Part - Concreting Foundations, Assembly And Construction Of Steel Screwed Galvanized Pokes Of The Cat -Shaped Design, Assembly Of Drivers With Configuration In The Triangle, Installation Of Insulator. Installation Of The Combined Ground Rope (Kzl), Assembly Of Ground Rope (Zl), Removal Of Wires, Insulator Hinges, Kzl And Zl On The Mast In The Section From Est Varín - Št. Sr/Cr Border Within The Existing 400 Kv Leadership V404 Including Dismantling Masts And Demolition Of The Foundations Of The Original Line, Assembly Of Bird Flight (Ball Markers) On Ground Ropes And Combined Ground Ropes And Installation Of Booths For Nesting Birds (All Within So01) Switchboard In The Appropriate Field Of R400 Kv Est Varín (Within So02), Adjustment Of The 22 Kv Line (Within So03). 3. Waid Of Trees And Trees Growing Outside The Forest (On Agricultural Land) And Reclamation On Agricultural Land Resulting From Decisions Of Allowing State Administration Authorities, 4.Phava, Respectively. Building Access Roads, Construction Of Descents, Including All Ič, Putting Roads And Downhills To Their Original State After All Work In Accordance With The Requests Of Owners, Users Or Administrators Of The Affected Plots Or Real Estate, 5. The Mast, Route (Axis) Leadership, All Intersections And Excavations In The Route Of Leadership (Forest And Agricultural Land). Focus Of The Pole, Protection Zone And Longitudinal Profile Of The New 400 Kv Line (Wires, Zl, Kzl), 7. Developing A Detailed Schedule Of The Realization Of The Whole Work, Which Must Include An Implementation Plan In Individual Weeks, Nn/Vn/Vvn Including Management Fees, 9. Contact Users Of The Lands Affected, Ensuring Entry To Land, 10. Request And Reimbursement Of The Resulting Damages Caused By The Contractor In The Realization Of The Work, 11.Soofing And Delivery Of The Final Acceptance Protocol On Handover
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.