Setting Up The Cover Of The Cover With A Thick Small-Grained Eu-Type Boiling-Grain-Growing Mixture Thickness Of 4 Cm, Printing Works By Casting Bitumen Emulsion By Applying The Auto, Construction Of A Cover With A Large-Grained Eu-Type Boiling-Grainy Boiling-Grainy Concrete Mixture Of 4 Cm, Construction Of Sand-Gravel With Optimal Granular Mixture Or Reddish-Sand Mixtures: The Thickness Of The Upper Layer Of 10 Cm, Set The Main And Coatings From Sand-Gravel Or Reddish-Sand Mixtures: Double The Thickness Of The Lower Layer Of 12 Cm, Should Add (An Additional 4 Departure) On Each Next Departure On A Track, Ground Compacting On A Trace With A Trace Of 8 T-Luced Trailing Trailing, Thickness Of The Layer: 15 Cm, Adding Time During The Next 5 M Transportation Of Ground, Filling The Pits And Trenches With Bulldozer (Spread By The Soil With Bulldozer) With The Replacement Of The Ground To The Distance To 5 M, 5 Km Of 4Th G Drug Transportation, The Quarry For Repair Of The Road Was Drilled With 0.5 Cubic Meters Of Iv Soil And Loading On The Cars From Facebook
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.