GTR 100592488

Bids Are Invited For North Package -2 - Video Conferencing Expansion

ICB — International Competitive Bid Closed Northern America
Tender Information
GTR Reference
100592488
Tendering Authority
Subscribe to view
Tender No
AB-2025-05463
Financer Name
Self-Funded
Work Title
Bids Are Invited For North Package -2 - Video Conferencing Expansion
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
Last Date of Bid Submission
04-09-2025 Closed
Work Detail
Please Review Section 01 11 00 For Details..1The Scope Of This Project Is To Provide Additional Circuits Of Power To The Courtrooms, Provide Pathways, Install And Label Low Voltage Cables Supplied By The Province. These Pathways Shall Be New And Not Disturb Existing Cabling. Once The Cabling Is In Place The Provinces Av Contractor Shall Install The New Video Conferencing Expansion. Once Complete The Electrical Contractor Will Remove The Old Av Cabling Systems. .2Submit Shop Drawings, Product Data And Samples As Specified, Indicating Details Of Construction, Dimensions, Capacities, Weights And Electrical Performance Characteristics Of Equipment And Materials..3Install Conduit Concealed In Walls, Floors, Ceilings, Above Suspended Ceilings And Underground. Surface Mounted Wire-Mold Is Unacceptable. .4Install All Onsite Cabling As Per Specified Locations As Shown On Supplied Drawings, Cable Pull Schedule And Specification..5Install All Required Customer Provided Cabling As Necessary Between Field Locations And Head End Locations..6Provide Shop Drawings Of Proposed Under Carpet Cable Floor Raceway System (Ada Compliant) For Approval, Prior To Installation. Connectrac Is The Preferred Option..7All Conduit Work And Junction Boxes As Required Shall Be The Responsibility Of The Electrical Contractor..8Install All Necessary Mounting Hardware, Wall Plates, Back Boxes, Junction Boxes, Conduit And Connectors To Ensure A Complete And Fully Operational End Product..9Provide Necessary Structural Backing For Displays, Racks And Monitors. Confirm Exact Locations With Cts And Accommodations..10Work With The Province Arrange For Delivery Of The Provided Low Voltage And Cat6a Network Wire And Cable. Electrical Contractor To Procure And Install All Power Cable. The Province Provided Cable Run Table Shall Be Reviewed To Determine Cable Type And Manufacturer..11Electrical Contractor Shall Provide Continuity Test Report For All New Low Voltage Cabling To The Province. .12All Belden Cables Shall Be Installed And Certified By A Belden Certified Installer. Electrical Contractor Shall Provide A 25-Year Warranty Letter From Belden Certifying The Installed Structured Cabling..13Electrical Contractor Shall Clearly Identify And Label Existing Panel Schedules With New Circuits. .14Upon Installation And Commissioning Of The New Video Conferencing Equipment (By Others), Electrical Contractor Will Be Required To Remove, End To End, All Obsolete And Previously Used A/V Cabling And Wires..15Electrical Contractor Shall Not Interfere With The Operations Of The Facility. This Is A Courthouse And Contractor Shall Work Within And Accommodate The Courthouse Schedule..16Contractor Must Carry Out All Installation And Related Work In A Presentable And Aesthetically Acceptable Manner..17Contractor Shall Provide A Proposed Work Schedule To Be Coordinated And Approved By Ab Infrastructure And The Provincial Court Schedulers..18Contractor Shall Liaise With Goa Court Technology Services, Province And Court Operations For Mobilization And Scheduling Of Cabling Infrastructure Installation..19Contractor Shall Include All Labour And Material, Expertise And Subcontractors Required To Complete The Scope Of Work Described Herein And In The Attached Drawing And Specifications..20At Regular Intervals During The Progress Of Work, Clean-Up Worksite And Building Premises And Dispose Of Waste, Rubbish, And Debris. When Working After Normal Work Hours, Ensure Facility Is Return To Clean And Acceptable Condition Before 7 A.M..21Do Not Allow Waste Material, Rubbish, And Debris To Accumulate And Become An Unsightly Or Hazardous Condition. Maintain Site In A Clean And Orderly Condition. .22Contractor Shall Allow For Costs To Provide Fire Alarm Bypass For Osid Sensors (And Other Fire Alarm Related Systems) And Fire Watch When Fire Alarm Is Bypassed..23Work To Be Completed Is Not Limited To The Above Description. Complete Work As Stated In The Attached Drawing Specification..24Contractor Shall Concurrently Work On A Minimum Of One Courtroom At Grande Prairie And One At Peace River.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2324a574-1926-42e7-8cae-53abe6d58ecc.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you