Generating Sets - Wwtp Klokoty - Cogeneration Unit. The Subject Of The Public Contract Is The Supply, Assembly And Commissioning Of A New Cogeneration Unit (Hereinafter Also Kgj) In The Outdoor Version (Machine In A Steel Container) And In Modifications Associated With The Installation Of A New Cogeneration Unit. In Connection With The Installation Of Kgj It Is Necessary To Build A Cable Connection Of The Upper And Lower Area Of The Wwtp. In Parallel With The New Electric Cables, The Existing Old Drinking Water Pipe, Which Leads From The Upper To The Lower Area, Will Be Replaced. Furthermore, The Discharge Of The Sludge From The Lower To The Upper Area Will Be Remedied And Part Of The Gravitational Pipe From The Upper To The Lower Area Of The Wwtp Will Be Remedied. The Replacement Of The Sewer Pipes And Sludge Displacement Will Not Be Carried Out In An Open Trench, But Will Be Trenchless Remediation In The Original Pipeline. Part Of The Subject Of Performance Is The Processing Of The Proposal To Supplement The Operating Rules Of The Wwtp Klokots, Ensure Communication With Eg.D And Future Operator, Ensuring Documents And Applying For A Binding Opinion On The Air Protection Authority Before The Construction Is Completed And The Trial Operation Of 12 Months, Including Noise Measurement. Warranty And Post -Warranty Service Kgj For 5 Years Will Be Realized On The Basis Of A Service Contract Concluded Between Supplier / Manufacturer Kgj And Operator Čevak A.S. See Zd.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.