GTR 100580435
Tenders Are Invited For Supervision Of Building Work - Performing Investor Supervision Over The Contract Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolin With Access Roads And Removing The Effects Of The Flood Consisting In The Expansion Of National Road No. 45 On The Section In Krapkowice.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
100580435
Tendering Authority
Subscribe to view
Tender No
533353-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Supervision Of Building Work - Performing Investor Supervision Over The Contract Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolin With Access Roads And Removing The Effects Of The Flood Consisting In The Expansion Of National Road No. 45 On The Section In Krapkowice.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
27-08-2025
Closed
Work Detail
Supervision Of Building Work - Performing Investor Supervision Over The Contract Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolin With Access Roads And Removing The Effects Of The Flood Consisting In The Expansion Of National Road No. 45 On The Section In Krapkowice.. The Subject Of The Contract Is: Performing Investor Supervision Over The Implementation Of The Contract Entitled: Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolin Together With Access Roads And Removing The Effects Of The Flood Consisting In The Expansion Of National Road No. 45 On The Section Of Krapkowice Covering The Implementation Of Task No. 1 And Task No. 2: Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolina With Access Roads. Task No. 2: Removing The Effects Of The Flood Consisting In The Expansion Of National Road No. 45 On The Section Of Krapkowice. The Order Includes The Function Of Investor Supervision In Accordance With The Act Of 7 July 1994 - Construction Law (Consolidated Text, Journal Of Laws Of 2021, Item 2351) And Contract Management - Contract For The Order Entitled: Construction Of The Southern Bridge On The Odra River In Krapkowice And Gogolin With Access Roads And Removing The Effects Of The Flood Consisting In The Extension Of The National Road No. 45 Episode Of Krapkowice. Supervision And Contract Management Which Is The Subject Of The Contract Includes: - For Task No. 1: Construction Of The Bridge On The Oder River, Construction Of A Road Connecting Dk45 With Dw 423 Which Will Be Accessed To The Designed Bridge, Construction Of Roundabouts On The Inclusion Of The Designed Road To Dk 45 And Up To Dw 423, Construction Of Other Engineering Facilities, Construction And Reconstruction Of The Designer Drainage System And Reconstruction Road Infrastructure, Construction And Reconstruction Of The Design Of The Designed Road Infrastructure, Construction Of A Technological Channel Along The Designed Crossing, Reconstruction Of Drainage Mesins With The Planned Investment, Reconstruction Or Securing The Underground And Above -Ground Infrastructure Network With The Designed Road Infrastructure, Inventory And Greenery Management. Construction Of An Economic Trip P1, Construction Of An Economic Trip P2, Construction Of The M3 Bridge On The Oder River, Construction Of The W4 Viaduct On Ul. Chrobrego, Construction Of Retaining Walls, Construction Of Traffic Safety Elements, Implementation Of Urban Monitoring. - For Task No. 2: Construction And Reconstruction Of The Road Surface Of The National Road, Gp Technical Class, Traffic Category Kr5 Construction Of The Surface Of Voivodship And Municipal Roads, Construction And Reconstruction Of Intersections With The Existing Road Network, Construction And Reconstruction Of Public And Individual Congresses, Construction And Reconstruction Of Pedestrian And Bike Paths, Bicycle And Pavements. Construction Of Slopes With Humus And Sowing Grass, Construction And Reconstruction Of Roadside Drainage Ditches, Construction Of 2 Bridge Facilities Over The Rivers, Demolition Of Engineering Facilities, Demolition Of Existing Roads, Embankments, Etc. Construction And Reconstruction Of Culverts Under The Roads, Reconstruction And/Or Protection Of Colliding Technical Infrastructure Networks/Devices, Construction Of Traffic Safety Elements,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
42c9807e-4823-4d27-ab59-214518b5bb98.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.