1 New Zawady And Up To 6.0 M Wide On The Remaining Section,- Construction And Reconstruction Of Pavements With A Width Of 2.00 M,- Construction Of A Walking And Bicycle Path With A Width Of 3.0 M,- Execution Of Roadsides Fortified With Aggregate With A Width Of 1.00 M,- Expansion Of Intersections With Municipal Roads And Poviat Road,- Construction Of Dividing Islands In Order To Calm Down Traffic, In Jedlińsk In The Region Of Primary School,- Reconstruction Of Parking Bays By A Width Of 3.0 M,- Reconstruction Of Existing Individual And Public Conventions,- Construction Of Rainwater Drainage,- Making Roadside Ditches And Trough Sewage,- Construction And Reconstruction Of Culverts Under The Poviat Road,- Construction Of The Technological Channel,- Vertical And Horizontal Marking. The Arrangement Of The Abdominal Layer Of The Entire Road Width. • The Contractor Is Obliged To Determine And Consolidate On The Ground, Along With The Required Geodetic Studies, New Border Lane Border Points, After The Division Of Real Estate In Accordance With The Zrid Decision, Border Signs - Concrete Bar (Reinforced Concrete With A Cross At The Top) .2. It Is Anticipated To Choose One Of The Variants Of The Performance Of The Order In Terms Of The Construction Of The Road Surface Structure, In Accordance With Wr-D-61 Catalog Of Typical Constructions Of Susceptible And Semi-Rigid Surfaces, I.E.: Basic Offer: Table 9.1. Type A1 Typical Constructions Of The Upper Layers Of Surfaces Susceptible To Aggregate. Basic Foundation: Ac Asphalt Concrete, Mixture Not Related To C90/3 Aggregate-For The Kr-3 Movement Category, • Variant Offer: Table 9.7. Type E Typical Constructions Of The Upper Layers Of Susceptible Surfaces. Basic Foundation: Ac Asphalt Concrete, A Mixture Made In Cold Recycling Technology (Mineral-Cement-Emulsion Mixture Or Mineral Mixture With Foamed Asphalt)-For The Category Of Movement Kr-3. Basic Or Variant. 3. The List Of Works Planned To Be Carried Out As Part Of The Order Is Given In The Appropriate Offer Cost Estimate Form:- Form No. 2.1 For The Basic Offer,- Form No. 2.2 For The Variant Offer. As Part Of The Works Listed In The Offer Cost Estimate, You Should Also Perform:- All Works- Auxiliary, Temporary And Accompanying Works, Including The Sst And Project Documentation, Which Are Necessary For The Contractor. Included In The Offer Cost Estimate, - All Other Works, Works, Research (Laboratory), Activities, Duties And Requirements Arising From Swz (Contracts, Sst, Project Documentation And Offer Cost Estimate). 4. A Detailed Description And Manner Of Execution Of The Order Was Specified In The Appropriate Offer Cost Estimate For A Given Variant And:- Project Documentation And Detailed Technical Specifications (Sst), Contained In Volume Iii Swz- Description Of The Subject Of The Contract (Opz),- Planned Contract Provisions Contained In Volume Ii Swz.5. The Method Of Developing Wood From The Felling Of Trees And Shrubs: 1) The Contractor Will Use Wood Obta
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.