4.1. The Subject Of The Contract Is The Implementation Of Films From The Construction Progress Of The Cep Morga With A Summary Film And A Promotional Spot, Understood As: 4.1.1. Production Of 12 Films (Each With A Length Of About 60 Seconds) Documenting The Progress Of Work On The Construction Site Cep Morgi: A) Scope: Assembly And Post -Production Of Source Material To Emissions, Adaptation To Publication In Social Media Min. Facebook, Instagram, On Youtube And On Television, Sound, Assembly, Subjecting Color Correction; Adapted To Broadcast In Two Versions/Formats: Horizontal (16: 9) And Vertical (9:16) For Publication In Social Media, Youtube And For Broadcasting On Television; Construction Of The Center, Each Recording Will Be Implemented After Prior Arrangement With The Contracting Authority Of The Date, Place And The Planned Scope Of Recorded Materials. B) Dates Of Handing Over Individual Films Together With Source Materials: Assumed To Start Completion: From Signing The Contract. From The Signing Of The Contract. Creat Of The End: February: February/March 2027 (Completion Of The Construction Of The Morgifil Natural Education Center Morgifilma Date Until December 31, 2025. March 2025 V -Vi Until June 30, 2026 Vii -Viii To August 31, 2026. Ix -X To November 30, 2026, Xi -Xii To February/March 2027. Allowing A Large -Format Print Min. The A0 Zamawyza Reserves The Right To Modify The Schedule For Transferring Films And Photographic Materials During The Implementation Of The Contract, Depending On The Progress Of Construction Works And The Organization Of Accompanying Events. Possible Changes To The Deadlines Will Be Agreed With The Contractor In Advance. 4.1.2. Summary Film (Making A Film With A Length Of About 7 Minutes) - Film Chronicle Of The Cep Morgi Cep A) Scope: Development And Agreement Of The Script With The Employer, Making The Film Based On The Assumptions Of The Script And In Constant Contact With The Ordering Party With The Ordering Party, Assembly, Post -Production And Sensitivity, Lectist Narrative (Texts Written In A Simple, Accessible Language), Park, Visitors, Etc., Application Of Techniques: Drone, Fpv, Timelapse, Hyperlapse, Shots From The Inside Of The Park. Praging A Ready Film: Until January 30, 2027, On A Pendrive Carrier With A Set Of Source Materials. 4.1.3. Promotional Spot (Implementation Of A Spot About 30 Sec.) A) Scope: Preparation Of The Script And Approval By The Ordering Party, Assembly, Post -Production, Background Music And Effects, Attractive, Dynamic Shots, Prepared (Meets Size And Quality Requirements) For Broadcast On Social Networks, Youtube, Television And During Conferences. 4.2. The Contractor Undertakes To Mention All Provisions Regarding Environmental Protection, Nature Protection, Health And Safety And Fire Protection. Before Entering The Babiogórski National Park, The Contractor Is Obliged To Obtain All Permits Of The Bgpn Director Required In Connection With The Impleme