Tenders Are Invited For Comprehensive Modernization Of The Roof Of The Building At Ul. Mikołowska 11 In Katowice

Tender Detail

100528170
NZ.231.075.2025
Self-Funded
Tenders Are Invited For Comprehensive Modernization Of The Roof Of The Building At Ul. Mikołowska 11 In Katowice
NCB
central europe
European Union
28-08-2025

Work Detail

1. The Subject Of The Order Is The Comprehensive Modernization Of The Roof Of The Building At Ul. Mikołowska 11 In Katowice, Including: 1) Demolition Of Old Felt And Tile Coverings, Flashings, Gutters, Downpipes, Formwork And Roofing, 2) Repair And Partial Replacement Of Roof Structural Elements, Chopping And Formwork, 3) Making New Covers From Class 3 And Thermo -Sequal Papa Min. 5.2 Mm, 4) Performing New Flashings From Coated Sheet Metal. Min. 0.5 Mm, 5) Making New Gutters And Drain Pipes Made Of Coated Sheet Min. 0.5 Mm, 6) Chimneys Over The Roof Of Brick Class Min. 15 With New Chimney Hats, 7) Replacement Of Chimneys, 8) Chimneys Painting, 9) Export And Disposal Of Debris And Other Waste From The Place Of Works 2. The Building Is Protected By The Protection Of The Municipal Conservator Of Monuments In Katowice On The Basis Of Entry Xii/2012 Of 31.12.2012. 3. Due To The Fact That Robots Will Be Carried Out In The Vicinity Of Other Residential Buildings, Compact Buildings And At The Pavements, Mikołowska Street And The Internal Road, The Contractor Is Obliged To Exercise Special Caution During The Works Performed And Perform Appropriate Security. 4. The Warranty Period Required By The Ordering Party, The Materials Used, The Materials Used And The Installed Devices Are 60 Months. 5. A Detailed Description Of The Subject Of The Contract Is Determined By The Order Documents, Including: 1) Technical Specification Of The Execution And Acceptance Of Works (Stwiorb), 2) Bill Of Quantities Pdf, Detailed Blind Cost Estimate, Views, Map, 3) Designed Contract Provisions Note! The Blind Cost Estimate In Ath Format Is Attached To The Auxiliary. In The Event Of A Discrepancy Between The Preliminary And Cost Estimate In Pdf Format And The Blind Cost Estimate In The Ath Format, Entries Are Included In Pdf.6 Formats. All Obligations Of The Contractor And The Ordering Party And The Conditions For The Implementation Of The Subject Of The Contract, The Method Of Settlement Is Concluded By The Planned Provisions Of The Contract Constituting Annex 3 To Swz.7. Employment Requirement Under An Employment Contract (Social Aspects): The Requirements Of The Employer In The Scope Of Employment Under The Employment Contract Are Included In § 2 Of The Planned Provisions Of The Contract (Annex 3 To Swz). 8. Equivalence Parameters 1) If The Stwiorb Or Bill Of Quantities Would Indicate Patents Or Origin, Sources Or A Special Process That Characterizes Products Or Services Provided By A Specific Contractor, Trademarks Or Origin Or Origin Or Origin Or Origin, Or Origin, Or Origin, Or Origin, Or Origin, Or The Norms, European Technical Specifications Or Other References Referred To In Art. 101 Para. 1 Point 2 Or Para. 3 Of The Act, The Ordering Party In Accordance With Art. 99 Para. 4 And 5 Of The Act Allow The Submission Of Products Equivalent Or In Accordance With Art. 101 Para. 4 Of The Act, Offering Equivalent Solutions In Relation To Those Indicated In The Documentation, Prov

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail