The Subject Of The Performance Of The Public Contract Is The Intensification Of Wwtp Psáry At 9500 Eo, Which Includes Primarily Follow: 1) Implementation Of Pumping Boreholes, Starting Of Hpv In The Area Of Wwtp. Implementation Of Makeshift Communication. 2) Judging And Sheeting Creation (So 301) For The Construction Of New Wwtp Lines (So 03). Ensuring Continuous Reduction Of Hpv Levels To The Prescribed Level For The Period Of The Construction. Execution Of The Building Pit. 3) Construction Of Žb Reservoirs And Above-Ground Parts Of The Building Of The New Wwtp Lines (So 03), Distribution-Ho Object Of The Installation Tanks (So 06) And Pumping Stations Floating Dirt (So 05). Covered By Prescribed Production Documentation. 4) In The Phase Of Completion Of The Building Part And Starting The Assembly Of Technology Within The New Li-Cne Wwtp (So 03): A. Execution And Commissioning Of An Emergency Bypass From Shaft Shaft Shaft For The Protection Of The Construction Site. B. Cleaning The Bottom In The Ss Shaft In Front Of The Wwtp And Its Equipment For The Provisional Pumping Of Waste Water Into The Existing Wwtp Line. Implementation Of Temporary Pe-Tubes For Pumping (Surface, Anchored) Ov To Existing Wwtp. Closing The Outflow From The Shaft Of The High School And Starting A Temporary Petrol Station. 5) Shutting Down The Operation Of The Existing Ms, The Interruption Of The Faeces Inner. 6) Preparation Of The Challenge Sheeting For The Construction Of A New Gravel Trap (So 01) And Ms (So 01), The Construction Of The Building Pits. 7) Construction Of Gravel Trap (So 01) And Ms (So 01), Realization Of New And Modifications Of Existing Pipes (So 04), Strengthening The Area Connection (So 09), Realization Of Cable Routes Between Individual Objects. Preparation Of Domestic Distribution Water Pumped From Well No.1. 8) In The Phase Of Completing The Construction Of The Trap (So 01) And Ms (So 01) And Completing The Equipment Of The Technology In The New Wwtp (So 03), Including The Temporary User Interface Mar From The Headquarters Of The New Wwtp: A. Posting A New Wwtp, Gravel And Ms - Ensuring Cleaning Of The Flowing Waste Water, The Pumping Pit Of The Rainwater Will Be Operated As A Flow Without Pumping. Cancellation Of Temporary Pumping Of Waste Water From The Shaft Of Ss To The Original Wwtp Building. Excess Sludge And Surface Dirt Will Be Accumulated In The Regeneration Of Sludge And Subsequently Disposed Of-See Below. B. The Weaning Of The Existing Wwtp, While The Operation Of The Existing Dome And The Machine Drainage Of Sludge Will Be Maintained As Long As Possible To Be Transported In A Drained Sta-Va. After The Necessary Shutdown Of Mechanical Drainage, It Will Be Exported Using The Car. 9) Construction Of A New Operating Building, Realization Of Central Mar Command For The Entire Wwtp And Construction Work And Remediation Of Concrete Surfaces In The Original Wwtp Building (So 02). Technologically, First Remove The Cup, Into Which They Will Be Drawn Temporary And Floating Dirt - A Temporary Removal With The Back. 10) After The Technological Part Is Put Into Operation In The Original Wwtp Installation And The Pumps In The Pumping Of The Rainwater Sump (Original Collection Sump), The Removal Of The Emergency Of The Shaft Ša-01. 11) Execution Of Reinforced Surfaces (So 07), Roads And Fencing (So 08). More Information Is Given In Annex 1 - Project Documentation, Including The Bill.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.