The Phase I Earthworks Scope Of Work Includes: .1 Topsoil Stripping In The Cell 7 Area To The Full Depth As Specified In The Drawings. .2 Landfill Cell 7 Excavation And Rough Grading To The Design Elevations. Source Separate And Stockpile Materials As Described In The Specifications And As Directed By The Owner. .3 Landfill Cell 7 Perimeter Berm Development. .4 Decommissioning Of Monitoring Wells By A Qualified Driller (As Detailed In Specification 33 11 53.10) .5 All Associated Works To Meet The Design Intent Of Cell 7 Phase I.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.