1. Order Name: Construction Of A Sports Hall At Primary School No. 3 In Pasłęk. 2. Determining The Subject Of The Public Contract: A Sports Hall With A Social Part With Dimensions Of 47.00M X 32.50M And A Height Of 9.676M, Connected By A Connector With The Existing School Building On Plots No. 416 And 447 Precinct 0001 Along With The Necessary Technical Infrastructure. The Hall Is Made In Traditional Technology, A Two -Story, Non -Basement Building, With A Gable Roof With A 6 ° Tilt Angle Above The Sports Hall And A Flat Roof With A 2 ° Tilt Angle Above The Social Part. Roof Sheathing Over The Gym From A Sandwich Panel Gr. 16 Cm And Above The Social Part About The Thermosal Papa Sheathing. The Hall Was Founded On The Feet And Foundation Benches. The Subject Of The Construction Intention Includes: 1) Demolition Of The Existing Paved Surfaces2) Demolition Of Colliding Tin Facilities, 3) Cutting Out 2 Conflicting Trees With The Designed Building And Planting Trees Specified In The Decision In The Amount Of 6 Pcs, 4) Construction Of A Sports Hall With A Social Part And A Connector, 5) Construction Of Internal Installations Of The Building, 6) Reconstruction Of The Existing Sanitary Sewage Installation And The Sanitary Installation Rain In The Scope Required For Connecting The Designed Building, 7) Construction Of An External Water Supply System Together With The Supply Of It From An Existing Connection Located On The Plot Covered By The Study, 8) Construction Of An External Hydrant Dn80,9) Construction Of Parking Spaces With Dimensions 2.5M X 5.0M And Parking Space For Disabled People With Dimensions 3.6M X 5.0M And Two Vehicle Charging Stations, 10) Construction Of A Band Around The Building With A Width Of 1.0M, 11) Construction Of New Squares Hardened For Access Purposes And Fire Roads. 12) As Part Of The Investment, The Congress Will Be Rebuilt, The Reconstruction Will Consist In Expanding The Exit To The Width Of 4.25 M.13) Purchase And Assembly Of Sports Hall Equipment. 3. The Contractor Is Obliged To Obtain A Permit To Use The Facility, Therefore The Work Should Be Carried Out Taking Into Account The Deadlines Necessary To Obtain The Opinion Of The Psp Km In Elbląg And Ppis In Elbląg And The Appropriate Pinb Decision In Elbląg. 4. The Material Scope Of The Study In Accordance With The Attached Documentation Developed By The Design And Engineering Studio, Msc. Łukasz Wiśniewski With Headquarters Mokre, Ul. Siwa 7, 86-302 Grudziądz5. The Details Of The Study Were Specified In The Documentation Constituting The Additions Listed In § Xxiii Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.