Plastering Work- Ve 07- Plaster And Stucco, Wall And Painting Work, Outside. Ve 07- Plaster And Stucco, Wall And Painting Work, Outside The Advertised Performance Includes The Plaster And Stucco, Wall And Painting Work, Outside, In Existing Construction. Measures: Construction Site Equipment For Your Own Performance, Documentation Documents, Construction Site Institution Plan, Schedule, Inventory, Inventory, Mapping Of The Damaged Areas And Catalog Of Measures, Sampling, Analyzes Of The Facade Existing Plaster, Testing Of The Surface Tensile Strength And Adhesive Resistance Of The Facade Plaster -342 M2 Demolition And Disposal Of Facade Plaster -102 M Demolition And Disposal Of Cornice -120 M2 Color Removal On Facade Plaster -200 M Color Removal On Ratios And Fascinating Abort From Various Cornice Covers, Lights, Dowels, Hooks, Cables, Cladding Caps, Lightning Protection Pipes, Etc. From The Facade -150 St Demolition Of Mortar Fillings In The Masonry (Clinker), 5/5 Cm To 20/20-30/30 Cm -803 M2 Cleaning The Plaster Facade And Vaulted Ceiling -200 M Cleaning The Cleaning Rodies -226 M2 Cleaning The Clinker Facade And Vaulted Ceiling -470 M Cleaning The Clinker -Repayments -226 M2 Facade Surface (Clinker): Restoring Approx. 30% Of The Area In Partial Areas (Renovation, Renovation, Renovation, Exchange Of Damaged Clinker Stones, Clinker Misalignment/Outbreaks With Stone Restoring Mortar, Close Cracks With Stone Restoration Mortar) -470 M Of A Flat-Ray Area (Clinker): Restoring Approx. 30% Of The Area In Partial Areas (Renovation Masonry Joints, Replacement Of Damaged Clinker Stones, Clinking Points/Outbursts Expose Stone Restoration Mortar, Close Cracks With Stone Restoration Mortar) -803 M2 Facade Surface Made Of Structure Plaster And Smooth Plaster: Restoring Approx. 30% Of The Surface In Partial Areas (Failure In Plaster, Holes, Cracks, Etc. Close, Renewal Of Part -Wall And Column Surfaces) -112 M Smooth Plaster Of The Cornice Bands, H/T = 15/10 Cm Stuck And Over Eg Mittelbau, H/D = 10/10 Cm -200 M Reviation And Fast Plaster: Restoring Approx. 30% Of The Surface In Partial Areas (Deflections In Plaster, Holes, Cracks, Etc.) -127 M2 Covering Wall And Vaulted Plaster Surfaces -94 M Corners -Plaster Surfaces Coating -215 M2 Graffiti Use On Clinker Facade