1. The Order Of The Contract Is Implemented As Part Of The Development Plan Component B Green Energy And Reduction Of Energy Consumption Co -Financed By The Instrument For Rebuilding And Increasing Immunity, The B1.1.4 Investment Strengthening The Energy Efficiency Of Local Social Activity Facilities .2. As Part Of The Investment, In Accordance With The Energy Audit Prepared, It Is Expected:- Roof Insulation: Wool (Λ 0.036), Thickness 14 Cm,- Insulation Of The Internal Ceiling: Wool (Λ 0.036), Thickness 14 Cm,- External Door Replacement: Doors (Umax = 1.3 W/M²k),- Window Replacement: Windows (Umax = 0.9 Windows (Umax = 0.9 Windows (Umax = 0.9 W/M²k),- Insulation Of External Walls: Polystyrene (Λ 0.036), Thickness 5 Cm,- Replacement Of Heat Source For Central Heating Purposes: Ground Heat Pump,- Installation Pv Installation: Pv With 49.9 Kwp,- Assembly Of The Covered Energy Storage: 240 Kwh, 3. A Detailed Description Of The Subject Of The Contract Is Included In Swz And Annex 1 To Swz. All Elements Of The Subject Of The Contract Must Be Made In Accordance With The Audit.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.