Tenders Are Invited For Execution Of The Rest Zone In The Rooms Of The New Boarding School Building In Szczawnica, The Ohp Education And Education Center In Szczawnica - Jabłonka.
Tenders Are Invited For Execution Of The Rest Zone In The Rooms Of The New Boarding School Building In Szczawnica, The Ohp Education And Education Center In Szczawnica - Jabłonka.
Adaptation Work Boils Down To The Merger Of Two Rooms, Demolishing Part Of The Wall Dividing These Rooms, Separation And Arrangement Of The Sauna Room, Arrangement Of The Rest Zone With The Spa Bathtub, As Well As The Toilet And Shower. 390 Cm,- Disassembly Of The Door In The Amount Of 4 Pcs- Door Installation In The Amount Of 4 Pcs- Tile To The Entire Floor Surface,- Construction Of A New Water-Sewage Installation. In The Premises,- Bricking The Door Opening 100 Cm,- Morals Of The Partition Wall,- Making Light Partition Walls,- Construction Of Suspended Ceilings From Gk,- Underfloor Heating,- Making A Geberite Housing Made Of Gk Plates,- Floor Arrangement,- Execution Of Lighting And Power Sockets,- Execution Of Emergency And Evacuation Lighting Installation,- Layout Wall And Ceiling Cladding In Sanitary Rooms And In The Rest Area,- Painting Walls And Ceilings,- Furniture Installation. There Are No Suspended Ceilings In The Room. It Is Planned To Make A Suspended Ceiling From Gk Plates In The Sauna Room And Part Of The Rest Room With A Spa Bathtub - According To Technical Drawings. The Existing Ones Are Equipped With Existing Gravitational Ventilation. The Existing Ventilation Channels Should Be Adapted,- Water And Sewage System. The Premises Have A Sanitary Sewage Drainage And Cold And Hot Water. It Is Planned To Distribute Water To The Designed Collection Points In Accordance With The Planned Arrangement.- Internal Electrical Installation- The Room Has An Electrical Installation, Which Should Be Adapted To The New Functional System. For The Planned Devices Of The Sauna And Hot Tubs, Make An Electric Connection In Accordance With The Device Supplier Guidelines. The Dashboard Should Be Placed Outside The Room. In The Room, Make A Control Panel For Sauna And Hydromassage Devices.- Society Installation- Newly Designed. It Is Planned To Ensure The Possibility Of Sounding The Room. Ceiling Speakers, Moisture-Resistant, Cooperating With Wired And Wireless External Devices. Build One Of The Sensors In The Space Above The Sauna Ceiling.- Gravitational Smoke Exhaust Installation- No In The Premises. The Set Description Includes Design Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.