GTR 100300911
Tenders Are Invited For Reconstruction Of Mała Puszcza Street In Porąbka
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
100300911
Tendering Authority
Subscribe to view
Tender No
ZP.271.1.12.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Mała Puszcza Street In Porąbka
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-08-2025
Closed
Work Detail
3 2. Order Scope: 1) The Area Of The Impact Of The Object: The Order Applies To The Internal Road Section Ul. A Small Lets In Porąbka. The Task Provides: Reconstruction Of The Stain Sewage System With A Length Of About 42 M, Execution Of Two Inspection Wells, Making A Base Cascade With Strengthening Of The Dna Of The Stream, Demolition And Reconstruction Of The Surface From Reinforced Concrete Plates. 2) Detailed Scope Of Works: 1. Earthworks And Preparatory Works Mechanical Innovation Of The Bushes And Rare Lining, Measuring Works For Water Devices, Execution Of Excavations With Plowing Excavators With Transport Of Spoil, Backfilling Of Excavations With Vertical Walls. 2. Inlet And Outlet Of The Pipelines Of The Foundation From The 20 Cm Thick Aggregate Foundation, Making Reinforced Concrete Elements Inlet And Outlet, Arrangement Of The Segment Of The Gravitational Sewage Pipeline From Pp Sn10 Ø1000 Mm Pipes-6 M, Foundation Of Broken Aggregate (15 Cm After Thickening), Cement-Spiask Cm After Thickening), Strengthening Of The Slopes And Dna With Prefabricated Joma Plates, Installation Of N2w3 Steel Protective Barriers With Concrete Foundations For Bars. 3. Rainwater Sewage Pipeline. Substrate (Bedding) Made Of Loose Materials - Gr. 30 Cm, Laying A Pipeline From Pp Sn10 Ø1000 Mm Pipes - 36 M, Making A Backflow From Loose Materials - Gr. 30 Cm.4. Revision Wells (Specific S.2.2 And Pp. 3.3) Making Concrete Substrate Under The Wells - 20 Cm Thick, Delivery And Assembly Of Prefabricated Reinforced Concrete Wells With: Bottom Vertebrae With Kineta, Intermediate Circles, Lid Board With Cast Iron, Glazing, Seal And Isolation Antwilgic. 5. Concrete Cascade And Strengthening Of The Bottom Of The Stream, Profiling And Compaction Of The Ground, Making A Foundation Of Broken Aggregate-15 Cm, Execution Of Cement-Sand Bed-5 Cm, Making A Concrete Cascade (5 Degrees) From Concrete B35 In Accordance With Design Documentation, Making Concrete Substrate Under Dna, Natural Stone (20-30 Cm), Pressed Into Fresh Concrete. 6. Robots Accompanying The Demolition Of The Existing Surface From Full Reinforced Concrete Panels (Up To 3 M² Each), Making Sand Bedding For New Reinforced Concrete Slabs, Laying The Surface From Full Reinforced Concrete Plates. 3) Approximate Quantities Illustrating The Scale Of The Order: A) Pipeline Length From Pp Sn10 Ø1000 Mm Pipe Audit Wells - 2 Pieces, C) Concrete Cascade - 5 Degrees, E) Steel Protective Barriers - In Accordance With Design Documentation. A Detailed Description Of The Subject Of The Contract Is Included In Annex 1 To Swz - Technical Documentation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7654765b-3e8e-4ec5-91cc-bef5afde4017.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.