Drilling The Group Of Hand Without Green Puppies, Group Of Group: 3 (Lil And Primension Cleaning), Demolition Of Reinforced Concrete Monolithic Coatings (D /Y Of Concrete Cannabis Dismantle Of The Qualified Parts V =, Chalovs Capacity To 0.5 M3 Of Construction Waste Loaded With Excavator: Download, Cargo Transportation Outside The Carer, Which Is 10 Tons Of Cargo Capacity, Transport Cars With Cars, Transportation Distance - 5 Km. 1St-Grade Load, Manual Planning Of The Bottom And Slopes Of Channels Drilled, Group Of Group: 3, Construction Of Six Basics: Sandy, Construction Of Six Bases: Gravel, Fastening Of The Bottom And Slopes With Monolithic Reinforced Cranes With 16 T-Luced Cranes, Thickness: 03 M (B = I, 2M, M = L, 5, Htit = 2, 2M B15), Reinforcement For Monolithic Reinforced Concrete Structures, Filling Of Seams With A Hermetic Material With Bitumen-Polymer Mastic, Demolition Of Reinforced Concrete Monolithic Covers (Unusable D / Concrete In The Entrance-Output Sections Of The Existing Bridge), Construction Waste Loaded With Excavator With 0.5 M3 Of Chalovs Capacity: Download, The Capacity Of The Carer, Which Is A Capacity Of 10 Tons, From A Fossil-Inbetry [Climbing Of Cargo In Cars. Transportation Distance - 5 Km. 1St-Grade Load, Setting Of Monolithic Reinforced Concrete: In The Entrance-Out-Exit Lisers Of The Existing Bridge Of Paving Consoles), A-3 Classroom Steel Fittings
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.