Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
12-08-2025
Work Detail
Quotation are invited for EStation, GT1 TO5 NG, LFO, Air and Water, All Pipeline Integrity Test for Frame 9E Gasturbine. GTE#1TO5 PIPELINE INTEGRITY INSPECTION AND CERTIFICATION GAS TURBINESPIPING SYSTEMSTECHNICAL SPECIFICATION 1. INTRODUCTION:DEWA OPER ATES A FLEET OF GAS TURBINES (GT) OF DIFFERENT MAKE AND MODELS.THESE GTS HAVE VARIOUS PIPING SYSTEMS AND PRESSURE VESSELS AS INTEGRA LPART OF GAS TURBINE PACKAGE. UAE LOCAL REGULATION EIAC #RQ-1B-004MANDATES INTEGRITY ASSESSMENT OF PIPING AND PRESSURE VESSELS DURIN G ITSSERVICE LIFE AT PERIODIC INTERVALS. DEWA FOLLOWS A STRINGENT 5-YEARSTANDARD PERIOD FOR INTEGRITY INSPECTION IRRESPECTIVE OF LOC ALREGULATIONSDEWA INTENDS TO APPOINT A COMPETENT INSPECTION AGENCY RECOGNIZED BYLOCAL AND INTERNATIONAL GOVERNMENT AGENCIES, WITH TH E CAPABILITY ANDEXTENSIVE EXPERIENCE TO CARRY OUT INTEGRITY ASSESSMENT (IA) ANDREMAINING LIFE ASSESSMENT (RLA) OF PRESSURE VESSELS A ND PIPING SYSTEMSOF GT PACKAGE INCLUDING GT PROPER AND ITS AUXILIARY PACKAGES. THEEVALUATION IS TO ENSURE THE COMPLIANCE WITH LOCAL REGULATION EIAC#RQ-1B-004 AND WITH INTERNATIONAL STANDARDS SUCH AS API510, ASME B31.8S,API 580/581, API 571 , B 31.3, B31.8, B31.4, API 579, API 1163, API-574, API-570 AND NACE AS APPLICABLE.2.#PHYSICAL BOUNDARY:THE BOUNDARY LIMIT OF INTEGRITY INSPECTION WORKS WI LL BE THE GT LIMITSOF VARIOUS MAIN AND AUXILIARY SYSTEMS AS PER THE PROCESS &INSTRUMENTATION DRAWINGS (P&IDS) ENCLOSED WITH THE BID. PHYSICALBOUNDARY OF THE WORKS NEEDS TO BE CONFIRMED BY THE CONTRACTOR BASED ONTHE SITE INSPECTION PRIOR TO SUBMISSION OF BID BASED ON THE P&IDSPROVIDED. SOME PIPING WHICH ARE NOT INDICATED IN P&ID BUT ARE PART OF GAS TURBINE SYSTEM WITHIN GT ENCLOSURE SHALL BE AL SO CONSIDERED ASINCLUDED IN SCOPE. THE CONTRACTOR IS EXPECTED TO STUDY SITE AND OBTAINREQUIRED CLARIFICATION ON SUCH PIPING PRIOR TO THE BIDDING.IT IS MANDATORY FOR THE BIDDERS TO VISIT THE SITE FOR PHYSICALVERIFICATION OF THE SYSTEM BOUNDARIES COVERED UNDER THE S COPE TOQUANTIFY THE VOLUME OF WORKS BEFORE SUBMITTING THEIR OFFER.3.#COMPONENTS COVERED:THE COMPONENTS TO BE INSPECTED UNDER GT MAIN & AUXILIARY SYSTEMS FORINTEGRITY ASSESSMENT SHALL INCLUDE BUT NOT LIMITED TO THE FOLLOWING:·#PRESSURE VESSELS·#PIPING·#PIPE FITTING S·#VALVES·#SAFETY VALVES/PRESSURE RELIEF VALVES. Qty: 1 EStation, GT1to5 NG, LFO, Air and Water, All Pipeline Integrity Test For For Frame 9E Gasturbine PLEASE REFER TO ATTACHED TECHNICAL SPECIFICATION AND DRAWING. FOR FURTHER DETAILS, PLEASE CONTACT ASM MYNUDDIN (0503620814) MYNUDDIN.HOSSAIN@DEWA.GOV.AE/MARWAN AL MHEIRI (0501136322) (MARWAN.ALM HEIRI@DEWA.GOV.AE)/AHMED ZAKARIA(0524781810)ahmed.eldaly@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501989)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.