Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
08-08-2025
Work Detail
Quotation are invited for MFO Tank 3E Bottom Bed Sand Removal & Filling with New Sand Mfo Tank 3e Bottom Bed Sand R 1032503610 MFO TANK 3E BOTTOM BED SAND REMOVAL <(>&<)> FILLING WITH NEW SAND Contact satheeshkumar.ramadoss@dewa.gov.ae Tel: 043226031/ 0504069988 1 ITEM-00001 SCOPE OF WORK FOR MFO TANK 3E BOTTOM BED SAND REMOVAL & FILLING WITH NEWSANDSCOPE OF WORK:·#MOBILIZE TO D-STATION MFO TANK 3E.·#SCRA P OUT DAMAGED TOP LAYER SAND OF BOTTOM PLATE BY 50 MM.·#COLLECT THE WASTE MATERIALS FROM INSIDE THE TANK AND SHIFT TO OUTSIDEFOR DIS POSAL.·#SUPPLY REQUIRED JUMBO BAGS AND PREPARED READY FOR DISPOSAL.·#FILLING OF NEW SAND AND LEVELLING UP TO THE REQUIRED SLOPE ANDH EIGHT.·#COLLECTION AND DISPOSAL OF OILY SAND OF MFO TANK 3E (APPROX. QTY # 12MT).·#COLLECT, LOADING BY USING DEWA SUPPLIED FORKLIFT/ CRANE, PROVIDETRANSPORT AND DISPOSE OILY SAND AS PER DUBAI MUNICIPALITY GUIDELINES.TANK SPECIFICATIONNAME: MFO TANK 3ETANK DIAMETER: 13.5 METERSNOTE: CONTRACTOR TO SUBMIT THE METHOD STATEMENT FOR EXISTING TANK BOTTOMPLATE SOIL BED DISPOSAL AND REPLACING WITH NEW S AND WITH THE BID FORREVIEW BY DEWA.NOTE TO CONTRACTORS:·#CONTRACTORS SHOULD VISIT THE SITE TO UNDERSTAND THE SITE CONDITIONS,CONTRAC T SCOPE, AND INTRICACIES OF THE WORK TO ENSURE THAT THEY FULLYUNDERSTAND THE SCOPE OF WORK FOR DESIGN, ENGINEERING, AND COSTESTIMATI ON.·#NO CLAIMS FOR EXTRA PAYMENTS SHALL BE ACCEPTED FOR ANY ADDITIONALMATERIALS OR WORKS THAT WERE FOUND REQUIRED AT THE TIME OF EXE CUTION OFTHE WORK DUE TO LACK OF UNDERSTANDING OF THE SCOPE, EXTENT OF WORK,PLANT/SITE RESTRICTIONS, UNDERESTIMATION OF THE SCOPE, E TC.,·#IRRESPECTIVE OF BEING EXPLICITLY OR IMPLICITLY MENTIONED IN THETENDER SPECIFICATION CONTRACTOR SHALL NOTE, ALL TECHNICAL ANDEN GINEERING REQUIREMENTS ESSENTIAL TO COMPLETE THE SCOPE OF WORK AREINCLUDED IN THIS TENDER DOCUMENT.·#ANY AMBIGUITIES OR DISCREPANCIE S BETWEEN CONTRACTOR#S OFFER AND THISTECHNICAL SPECIFICATION AFTER AWARD OF THE CONTRACT SHALL BE RESOLVED BYTHE DEWA, WHO SHALL THE N INSTRUCT THE CONTRACTOR THEREON.INTERPRETATION, CHANGE, OR CORRECTION MADE BY DEWA WILL BE BINDING FORTHE CONTRACTOR IN THIS REGAR D WITHOUT ANY ADDITIONAL COST TO DEWA.·#NO CLAIMS FOR EXTRA PAYMENTS SHALL BE ACCEPTED FOR DE-MOBILIZATIONAND REMOBILIZATION OR WAIT ING TIME OR IDLE TIME DUE TO DEWA#SOPERATIONAL CONSTRAINTS OR OTHER CRITICAL MAINTENANCE ACTIVITIES CARRIEDOUT BY DEWA AT THE SITE.D EWA SCOPE:·#FRESH WATER, AIR, AND ELECTRICITY·#CRANE & FORKLIFT·#PERMITS AND PASSES.·#ISOLATION OF THE SYSTEM 1 JOB STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501901)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.