The Subject Of The Public Contract Is A New Cycle Path In A Total Length Of 1.54 Km, Which Will Build On The Planned Cycling Route In The Part Of The Municipality Of Arnultovice And The Existing Cycle Path Towards Prudnik. The Construction Of The Bike Path Will Make The Location Of The Ponds Available. On The Czech Side There Will Be A New Cycle Path Of 1.54 Km And A Width Of 2.5 - 3M. On The Route Will Be Built Rest Areas For Rest For The Rest Of The Journey (On The Czech Side Will Be Located At The Ponds, At The Intersection), The Furniture Will Be Located At The Information Center At The Chateau In Jindřichov (Rest Sheds, Elements Of Small Architecture - Benches, Wheels, Garbage Baskets, Information Boards, Electron -Charges - And 2 Electronic Information Boards). The Cycle Path Will Be Used For Exclusive Operation Of Cyclists. Furthermore, The Project Also Includes A Wooden Footbridge Over An Overflow Of 9.1 M And A Width Of 3 M. The Footbridge Will Be Used For Pedestrians And Cyclists. The Dam Will Also Be Modified Between The Ponds, When The Area Around The Dam Will Be Lined With A Quarry Stone And The Edge Of The Safety Spill Will Be Reduced. A New Nn Cable Connection Will Be Made For An Electric Bike Charging Station In A Total Length Of 1.220 Km (Underground And Above -Ground Part Of The Connection)+ 100 M (Underground Area Distribution). The Building Is Divided By The Following Buildings: So 101 Cycle Path So 201 Footbridge-Game So 301 Dress Adjustment So 401 Nn Connection
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.