Quotation Are Invited For Gantry Crane Structural Survey

Tender Detail

100136679
2332501961
Self-Funded
Quotation Are Invited For Gantry Crane Structural Survey
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
08-08-2025

Work Detail

Quotation Are Invited For Gantry Crane Structural Survey 1032503496 1 Item-00001 To Conduct Specialized Structure Inspection Which Survey Actualstructure Condition As It IsCrane- 52 T Desal Crane 2 Nosdeliver An Engineering Consultancy Output, With Evaluation Of Thestructure Actual Condition, Mechanical And Safety Aspects Through Ndtand Qc I Nspectors.#########Inspection Overview.Structure And Welding Inspection Ndt Inspection.Bolts Connection Ndt Inspection.Coating And P Ainting Inspections.Other Mechanical Inspections That Creates Potential Risk.Inspection Methods.Vt - Visualut Ultrasonic Testingmt - Magnetic Particle Testingrt - Ring Testing.About Ndt - Ansi/Aws D 1.1 (Clause 6), Astm E709, Inspection %: 100%#########Applicabl E Inspections Accessexisting Platformsmanlift (Provided By Dewa), Operator Provided By Contractor / 2 Ea Supplier.About Ndt - Ansi/Aws D 1.1 (Clause 6), Astm E709, Inspection %: 100%Rope Access (Provided By Contractor.#########Item#Descriptions / Parts Details.######## 1#Lt Wheels########2#Lt Buggies########3#Lt- Buggies Shafts########4#Botton / Sealing Beam########5#Legs (Vertical)########6#Joint (Square Flange Bolted)########7#Bolts########8#Girder##### ###9#Ct - Rail########10#Ct - Trolley Frame########11#Ct - Trolley Wheels# #######12#Ct - Welding########13#Gantry Crane Access (Ladder And Platform)########14#Driven Parts Pulleys########15#Driven Parts Hook########16#Driven Part Drum########17#Shaft / Lifting Points.#################Rfx Details /Access To The Gantry Crane Is Unde R Responsibility Of Supplier, Allinvolved Staff Required: Previous Proved Experiences, Work At Heighttraining And Certificate.Output / Delivery: Reports And Conclusions To Be Submitted Not After 2Weeks Of Concluded The Works.Manlift Provided By Dewa, Operator With Valid Certificate Undercontractor Certificate.Consider The Activity Required To Be Conducted During Weekends.Expected Execution Tim E 4 - 5 Working Days / Crane.After Conducted Test All Parts Required To Be Painted Against (Underdewa Requirement) Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332501961)/$Value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail