Construction Work-Nya Fridtjuv Bergskolan F-6. In November 2022, The Municipal Board Decided That The Existing Fridtjuv Bergskolan (Today F-5) Will Be Demolished And Replaced With New Premises With Cooking Kitchens For 350 Pupils For Grade F-6, New Outdoor Environment And A New Gym. Pupils Go And 5 Will Be Evacuated To Other Premises, While Year 1-4 Will Be Relocated In Existing School Premises At Fridtjuv Bergskolan. The Evacuation Is Planned To Take Place The Christmas Holidays 2025/2026. New Detailed Plan Gained Legal Force In May 2025 And The Client Is Now Preparing The Building Permit Process. The Project The Project Is Divided Into Stages Where The School Building (Incl. Associated Ground Work) Is First Built. After The New School Has Been Completed, The Second Stage Is Started Where The Large Land Planning And New Sports Hall Will Be Built. The Project Has High Complexity, Which Is Why Times, Economics, Planning, Consideration For Citizens Will Be Important In The Project. The School Building Must Be Built According To Miljöbyggnad Silver (Does Not Apply To A Gym). Building Products And Materials Used Must Fulfill A Comprehensive Assessment According To Sundahus Class A Or B. The Project Is Included By A Side Contract Called Project Storgatan. The Execution For This Is Planned To Take Place During 2027. Buildings The Project Consists Of Two Main Buildings - School And Gym. The School Is Mainly Built On Two Floors But Also Has A Smaller Area In The Basement Plan For Technology. The Main Extent Of The School Building Is Classrooms, Group Rooms, Special Rooms, Dining Rooms, Cooking Kitchens And Staff Department And Premises For The Cultural School. Exterior Environment Consists Of New Soil Planning Including Play Environment, Stormwater Reservoir, Fat Separator, Emergency Water Well, Reserve Power And Storage Buildings, Etc. The Gym Consists Of Sports Rooms, Changing Rooms And Dance Rooms, Etc. Surfaces School Building Approx. 5951 M2 Bta Gym About 971 M2 Bta Complement Buildings Approx 155 M2 Bta Toms Area: Approx. 23 560 M2 Uma The Conditions For The Project The Project Is Traded As A General Contract On The Contract Form Total Contract, As The Aspect Of 06. Described In The Contracting Contract. The Client Has Designed A Request Document That Will Be Refined Together With The Contractor. The Technical Documents Are Presented Under Other Documents According To Abt 06 Section 1, Section 3 Pkt 7. The Contract Will Be Carried Out In Accordance With A Phase Division With Planning And Planning (Phase 1) On The One Hand And Detailed Planning And Execution (Phase 2) On The Other, Which Is Described In More Detail In The Contract. The Purpose Of The Procurement Form Is To Achieve A Functional, Qualitative And Sustainable Project With Overall Competence And Creativity. The Project Is Carried Out In Open Collaboration Between The Parties With Abt 06 As A Basis. In This Procurement, The Work Process Will Submit Tenders For Contracting Fees And A Fixed Price For Official Costs Under Phase 2. Offered Prices Shall Also Be Valid During The Work Process Phase 1 And Phase 2. See 07.2 Tender Evaluation Model.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.