- The Subject Of The Contract Is The Construction Of Water Supply And Sewerage System Within The Land Network. - The Water Supply Is Connected To The Existing Distribution In The Village. The Gravitational Sewerage System Is Pumped By Discharge Pipes Into The Existing Gravitational Sewerage System. For Individual Plots, Water Connections Will Be Made With Water Meter Shaft And Sewer Connections Terminated By Inspection Shaft.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.