Reconstruction Of The Internal Road No. Dwj-11 Founded On Plot No. 370 In Jaksmanice And Reconstruction Of The Internal Road No. Dwj-12 Located On Plot No. 382 In Jaksmanice. The Objective Task Will Be Offered In The Following Range: 1. Reconstruction Of The Internal Road No. Dwj-11 Founded On Plot No. 370 In Jaksmanice. A General Scope Of Works At: Dz. No. 370 At Km 0+000 - 0+080 Includes: - Correction To A Depth Of 25 Cm With A Lane Width 4.00 M Along The Entire Length Of The Road. - Making The Foundation Layer From The Clinic Thickness Of The Fraction 31.5 - 63 Mm With A Layer Thickness Of 15 Cm With A Width Of 4.00 M In The Entire Length Of The Road, - Construction Layers 10 Cm With A Width Of 4.00 M Wide Along The Entire Length Of The Road,- Construction Of A Bituminous Surface Of The W-Wa-Binding Thickness Of 4 Cm Wide With A Width Of 3.00 M Along The Entire Length Of The Road,- Construction Of The Bituminous Surface Of 4 Cm Width With A Width Of 3.00 M Along The Entire Length Of The Road,- Making Bilateral Sidewalks From Stone Material With A Thickness. 8 Cm And Width 0.50 M Klińca 0-31.5 Mm, The Scope Of Planned Works Is Within The Road Lane, Therefore The Investment Will Be Implemented In The Procedure For Notifying Construction Works On The Attitude Of Art. 29 Section 3 Points 1D Of The Act Of 7 July 1994 - Construction Law (I.E., Journal Of Laws Of 2025, Item 418). No. 382 At Km 0+000 - 0+072 Shrouds: - Corrotean At A Depth Of 25 Cm With A Lane Width 4.00 M Along The Entire Length Of The Road. - Making A Layer Of Foundation From The Clinic Thickness Of The Fraction Of 31.5 - 63 Mm With A Thickness Thickness Of 15 Cm With A Width Of 4.00 M Wide Along The Entire Length Of The Road, - Construction The Thickness Thickness Of 10 Cm With A Width Of 4.00 M Wide Along The Entire Length Of The Road,- Construction Of The Bituminous Surface Of The W-Wa-Binding Thickness Of A Thickness Of 4 Cm With A Width Of 3.00 M Along The Entire Length Of The Road,- Construction Of The Bituminous Surface In-Abrasive Surface 4 Cm Thick With A Width Of 3.00 M Along The Entire Length Of The Road,- Making Double-Sided Roads From Stone Material With A Thickness. 8 Cm And Width 0.50 M Klińca 0-31.5 Mm, The Scope Of Planned Works Is Within The Road Lane, Therefore The Investment Will Be Implemented In The Procedure For Notifying Construction Works On The Attitude Of Art. 29 Section 3 Points 1D Of The Act Of 7 July 1994 - Construction Law (I.E., Journal Of Laws Of 2025, Item 418).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.