1. The Subject Of The Investment Is The Construction Of A Sensory Park In Accordance With The Design Documentation Constituting Annex 3 To This Swz.2. In The City Of Zduńska Wola There Is An Urban Greenery Management System (Https://Zdunskawola.Pl/Omescie/System-Zarzadzania-Zielenia-Miejska/Miejska/), Which Should Be Taken Into Account During Design Work. 3. The Manager Informs That The Contractors Liability For Defects Is Expanding In Such A Way That The Warranty Period For Defects Is Responsible For The Warranty Date And Runs From The Date Of Effectively Completed Final Acceptance. The Minimum Warranty Period Is - 60 Months. Further Stretch Of Section 7.4.) The Type And Scope Of The Contract Changes And The Conditions For Their Introduction2) A Change In The Scope Of Materials, Technical Parameters, Technology Of Performing Construction Works, The Manner And Scope Of The Performance Of The Subject Of The Contract Will Be Possible In The Case Of: A) The Need To Complete Any Part Of The Works, Covered By The Subject Of The Contract, Using Different Technical Or Technological Solutions, Than Indicated In The Design Documentation, And Resulting From The Design Documentation The Defect Of This Documentation Or A Change In The Legal Status Based On Which They Were Prepared If The Application Of The Provided Solutions Threatened With Non -Performance Or Improper Performance Of The Subject Of The Contract, B) The Need To Implement The Subject Of The Contract Using Other Technical Or Material Solutions Due To Changes In Applicable Law, C) The Occurrence Of Higher Force Preventing The Performance Of The Subject Of The Contract In Accordance With Its Provisions, The Need To Change Building Materials, Equipment, Equipment, Equipment, Equipment, Equipment, Equipment Devices, Technical/ Technological Solutions, In A Situation Where The Use Of Building Materials, Equipment, Technical/ Technological Solutions Indicated In The Project Documentation Will Become Impossible Due To Cessation Of Production, Withdrawal From The Market Or Replace Others Or The Use Of Solutions Or Replacement Materials Will Be Dictated By Utility Or Functional Reasons, Improvement Of The Construction Process, Increasing Safety At The Construction For The Exploitation And Maintenance Of The Completed Subject Of The Contract, Technological Progress Or A Change In Applicable Regulations; The Above Change Of The Contract Is Admissible Provided That The Materials, Equipment And Equipment, Having At Least Such Quality Parameters And Utility Features, Such As Those That Constituted The Basis For Choosing The Offer (As Indicated In The Project Documentation) Or That During The Performance Of The Order, Better Quality Building Materials Or Other Parameters Will Be Used, Provided That The Order Will Be Used. 2. In Order To Change The Provisions Of The Contract Requested By The Party, It Is Obliged To Submit A Written Application With A Proposal To Change The Terms Of The Contract Along With Thei
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.