1. The Subject Of The Contract Is The Construction Of The Park Together With The Necessary Technical Infrastructure (Land Lighting, Street Spa With Water Connection And A Water Meter Well, Technological Channel), Pavement Surfaces Including 10 Parking Spaces And Small Architecture Facilities (Benches, Baskets, Bicycle Racks), In Accordance With The Attached Design Documentation, Sst And Detailed Description Of The Subject Of The Contract, Contained In Annex 2.2. The Contractor Will Process The Order From The Materials Provided For In The Documentation, Sst Or Equivalent Materials. 3. All Works Should Be Carried Out In Accordance With Technical Documentation And Applicable Technical Conditions And Regulations. 4. Pursuant To Art. 101 Para. 4 Of The Act, In The Place Where The Subject Of The Contract Is Described By Means Of Standards, Technical Assessments, Technical Specifications And Technical Reference Systems, The Contracting Authority Allows Equivalent Solutions Described. In Addition, It Should Be Assumed That All Such References Are Accompanied By Or Equivalent Words. Indication Of The Equivalence Of The Offered Solution In Accordance With Art. 101 Para. 5 Of The Act And, On The Terms Specified There, Lies With The Contractor, In This Case The Contractor Is Obliged To Prove By Joining The Relevant Evidence In Question Referred To In Art. 104-107 Of The Public Procurement Law, That The Proposed Solutions Balance Meet The Requirements Specified In The Description Of The Subject Of The Contract. 5. In The Event That Trademarks Have Been Used In The Design Documentation Or Technical Specification And Acceptance Of Works, This Means That They Are Given, For Example, And Specify The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Apply Equivalent Materials Or Devices, But With Technical And Quality Parameters Similar Or Better, The Use Of Which Will In No Way Negatively Affect The Proper Functioning Of The Solutions Adopted In The Project Documentation. The Contractor Who Uses The Equipment Or Equivalent Will Be Obliged To Show During The Performance Of The Order That The Materials And Devices He Used Meet The Requirements Set By The Employer. 6. The Use Of The Label In The Design Documentation Means That The Employer Accepts All Labels Confirming That The Details, Deliveries Or Services Meet The Equivalent Requirements Of The Labels Specified By The Employer. In The Event That The Contractor For Reasons Beyond His Beyond His Control Cannot Obtain A Label Specified By The Employer Or Equivalent Label, The Contracting Authority, Within The Time Limit, Accepts Other Corresponding Evidence, In Particular The Manufacturers Documentation, If The Contractor Provides That The Construction Works, Delivery Or Services To Be Performed By Him, Meet The Requirements Of A Specific Label Or Specific Requirements Indicated By Him By The Contracting Authority. 7. Using In The Project Documentation The Requirement To Have A Certi
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.