Tender Result Notice

18375300
Presidential Directorate, Building Construction, City Of Bern
Switzerland
3,69,891 - CHF

Work Detail

Contract Award For Replacement Synthetic Turf In Bern, Stage 2024 Bodenweid Sports Complex: - Dismantling Of Existing Synthetic Turf Filled With Granules/Sand - Dismantling Of Contaminated Elastic Layer Including Disposal - Installation Of 25 Mm Elastic Layer Using The In-Situ Process - Laying Of Unfilled Synthetic Turf, 34 Mm High, 3 Floor Layers, Including Lining Lot 1 - Bodenweid 1 // Bodenweid 2 Week 24 - Week 32 Weissenstein Sports Facility: - Dismantling Of Existing Synthetic Turf Filled With Granules/Sand - Layers Determined. Elastic Layer In The Edge Area - Laying Unfilled Synthetic Turf, 34 Mm High, 3 Floor Layers, Including Lining Lot 2 - Weissenstein KW 24 - KW 27 In The Event Of A Delay For Which The Contractor Is Responsible, The Start Of Operations According To The Construction Program Will Be Subject To A Contractual Penalty Of 0.75% Of The Gross Order Amount Per Calendar Day Of Delay Will Be Claimed. Lot Number 2 Short Description: Weissenstein: Replacement Of Rubber Granulate/Sand-Filled Synthetic Turf With Unfilled Synthetic Turf With 3 Floor Layers On The Normfeld Sports Facility In Weissenstein.

Key Dates

2024-03-27
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail