BRR : 9981878
Click Here To View Tendering Authority. Aoc City/State :  perambalur, Tamil Nadu
Tender Brief : Tender for Specification For The Various Capital Works To Be Carried Out In O&M Ariyalur Division Under Running Contract For 1 Year (Or) Exhausting Of Face Value.-- 1 Excavation of Pole Pits for poles upto 8.00m length by using JCB/Manual (1.25 X 0.6 X 1.5M) 2 Excavation of Pole Pits for pole above 8.00m length by using JCB/Manual (1.25x06x1.83M) 3 Excavation of Pole Pits in Hard Soil (common to all size of poles) 4 Excavation of Pole Pits in rocky area (common to all size of poles) by blasting / Manual 5 Excavation of Stay pit of 4.5 to 5 depth using JCB / Manual (0.95 X 0.6 X 1.2 M) 6... Read More
Tender Value
25,00,000
Contract Value
₹ 25,00,000
Saving / Difference
₹ 0
Submission Date
08-12-2025
Contract Date
15-04-2026
Completion Date
365 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 25,00,000 L1
2 cnet-technologies Bid Analytics
Work Detail
tender for specification for the various capital works to be carried out in o&m ariyalur division under running contract for 1 year (or) exhausting of face value.-- 1 excavation of pole pits for poles upto 8.00m length by using jcb/manual (1.25 x 0.6 x 1.5m) 2 excavation of pole pits for pole above 8.00m length by using jcb/manual (1.25x06x1.83m) 3 excavation of pole pits in hard soil (common to all size of poles) 4 excavation of pole pits in rocky area (common to all size of poles) by blasting / manual 5 excavation of stay pit of 4.5 to 5 depth using jcb / manual (0.95 x 0.6 x 1.2 m) 6 excavation of stay pit in hard rock soil (0.95 x 0.6 x 1.2 m) 7 erection of rcc, rec, psc poles upto 8.00m length by using crane / manual 8 erection of rcc, rec, psc poles above 8.00m length by using crane / manual 9 erection of metal supports above 9m / rsj / rail pole/tubular poles 10 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. excluding stay pit excavation 11 erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 12 erection of stay set complete in the rock area by blasting 13 fixing of v cross arm 3.5feet 14 fixing of v cross arm4.5 feet 15 fixing ofv cross arm5.0 feet 16 fixing of fixing of lt s phase cross arm 17 fixing of fixing of lt 3 phase cross arm 18 fixing of fixing of ht / lt ti fitting 19 fixing of fixing of ht pin insulator with pin 11 kv 20 fixing of ht pin insulator with pin 22 kv 21 fixing of ht pin insulator with pin 33 kv 22 fixing of lt pin insulator with pin 23 fixing of ht strain disc 11 kv with metal parts 24 fixing of ht strain disc 22 kv with metal parts 25 fixing of ht strain disc 33 kv with metal parts 26 fixing of tapping cross arm 27 fixing of two tapping cross arm per cut point upto 33 kv line including fixing of discs,insulators and jumpering etc.. 28 fixing of top channel 29 fixing & erection of cross bracing 30 fixing of shackle with metal parts 31 fixing of aluminium knob 32 fixing of ht las (3 nos.) 33 fixing of lt las (3 nos.) 34 paving and stringing of conductors of sizes upto 7/2.59 mm acsr or other equivalent conductor 35 paving and stringing of conductors ofabove7/2.59 mm acsr or other equivalent conductor upto 7/3.35mm acsr or other equivalent conductor 36 paving and stringing of conductors of7/4.09mm acsr or other equivalent conductor 37 paving and stringing of conductors of7/4.72 mm dog conductor or other equivalent conductor 38 releasing and reerection (resagging) of one run of all sizes of conductor 39 complete erection of double pole distribution transformer structureas per tneb standard likepole pit excavation & erection, stay pit excavation and erection, feeders arrangement, open type fuse unit,ht / lt las and jumpering, 3 nos earth pits with earth trough, concreting,coping, colour washing of rcc poles, painting of structure materials (including cost of paint(red oxide,aluminium) and distember), danger board fixing etc.. (excludingerection of distribution transformer) 40 erection ofsingle pole structure including erection of dt complete without centre support (data as per annexure iii) 41 erection of single pole structure including erection of dt complete with centre support ( data as per annexure iii) 42 (i)erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. upto 25 kva distribution transformer / metering set. 43 (ii) erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. above 25 kva to 100 kva 44 (iii) erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. above 100 kva to 250 kva 45 (iv) erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. 500 kva and above 46 (i) erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, hg fuse unit, concreting, painting, colour washing etc., with 11 kv ab switch using all types of poles of size 9.14 m and above length 47 (i) with 22 / 33 kv ab switch using all types of poles of size 9.14 m and above length erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, hg fuse unit, concreting, painting, colour washing etc., 48 erection of single pole dp with completewith earthing 49 (i) concreting with 1:4:8 mix using 40 mm jelly including curing(material + labour) mass concreting of poles with coping 0.6mx 0.45mx1.25m 50 (ii) concreting with 1:4:8 mix using 40 mm jelly including curing(material + labour) sleeveconcreting with coping 0.6mx 0.6mx0.3m 51 (iii) concreting with 1:4:8 mix using 40 mm jelly including curing(material + labour) stay concreting with coping 0.3m dia and 0.75 long 52 (i) earthing of poles with gi wires 4 or 6 swg by coil earthing 53 (iii) pipie earthing including excavation of earth pit and fixing earth pipe 3 m length 54 (i) loading & unloading of distribution transformer upto 100 kva 55 (ii) loading & unloading of distribution transformer above 100 kva and upto 500 kva 56 (i) loading& unloading of rec, rcc, psc pole upto 8.00 m length 57 (ii) loading& unloading of all rec, rcc pole above 8.00 m length 58 (iii) loading& unloading of metal poles all sizes 59 (iv) loading& unloading of 7.5mtr/8.0 mtr pole grill 60 (v) loading& unloading of 9.14 mtr pole grill 61 loading of conductor with ramp 62 unloading of conductor with ramp 63 loading of line materials (including stacking except conductor drum & scrap material) 64 unloading of line materials (including stacking except conductor drum & scrap material) 65 transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 1.0 km 66 (i) transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) for a lead upto 5 km 67 (ii) transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) above 5 km of lead of every km 68 (i) transporting of distribution transformer / line materials from stores to office / site upto 10km distance by engaging 1 ton capacity minidor (lorry) 69 (ii) transporting of distribution transformer / line materials from stores to office / site above 10 km distance by engaging 1 ton capacity minidor (lorry) 70 (i) provision of guarding with two numbers earth pits excluding stay set erection -flat guarding with earth pit 71 (ii) provision of guarding with two numbers earth pits excluding stay set erection - split neutral 72 (iii) provision of guarding with two numbers earth pits excluding stay set erection- gradle guarding including earthing and earth pit excavation without material 73 dismantling of rcc, rec, psc & metal pole of all sizes including the closing of the pit 74 dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 75 dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 76 (a)releasing of lt s ph x arm with all accessories 77 (b)relaasing of lt 3 ph x arm with all accessories 78 (c)releasing of 3 - 6 v cross arm/tapping channal/guardingx arm with all accessories 79 (d)releasing of 4 - 6 andv cross arm with all accessories 80 (e)releasing of5v cross arm with all accessories 81 (f) releasing of distn.tr. only at field - upto 25 kva / metering set 82 (g) releasing of distn.tr. only at field- above 25 kva and upto 100kva 83 (h) releasing of distn.tr. only at field - above 100 kva and upto 250kva 84 (i)releasing of distn.tr. only at field - above 250kva 85 painting of distribution transformer of all capacities (paint to be supplied by the board) including cleaning of dt 86 numbering of poles including base painting and with cost of paint 87 painting of iron poles up to 36 ft length with double coats including cost of paint 88 painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 89 painting of cement poles by distember coating including cost of distember 90 painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (items 1 to 6 brush to be owned by the contractor)(paint to be supplied by department) 91 labour charges for alteration of back clamp 92 labour charges for alteration of stay clamp 93 providing of holes all size angles/channel upto 3/4 94 providing of holes all size angles/channel above 3/4 95 slot holes in flat/angle/channel upto 3/4 96 slot holes in flat/angle/channel above 3/4 97 cuttiing of angle/ms channels 98 cuttiing of rs joist 99 manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 100 welding of base plate with rsj including consumables 101 converting pin point into cut point in ht lines 102 converting pin point into cut point in lt lines (single / three phase)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 2a9bf86d-0ebc-401a-aeae-38525b86629f result notice
Download boqcomparativechart boq document
Download finance_747302 aoc document
Download finsummary_747302 aoc document
Download rateaccp14 aoc document
Download technical_747302 aoc document
Download techsummary_747302 aoc document
Download File Name File Description
Download 646c38b6-b285-4278-b4b7-a2369c68e7a5 Tender Documents
Download BOQ_747302 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders