Tender Result - Tender For Connectivity road from Sarai Inayat Kuandih road via Adda Harijan Basti to Chamraut Basti - Construction of Embankment with Material Obtained from Borrow Pits/Right of way with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 301 & as per direction of Engineer-in-charge. 2 Construction of subgrade and earthen shoulders with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 303 & as per direction of Engineer-in-charge. 3 Construction of granular sub-base grading 1 by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete in all respect as per MORD Technical Specification Clause 401 & as per direction of Engineer-in-charge. 4 WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 5 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 6 Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete in all respects and as per direction of Engineer-in-charge. 7 Providing and applying Primer Coat with bitumen emulsion SS1 grade on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means complete in all respect as per MORD Technical Specification Clause 502 & as per direction of Engineer-in-charge. 8 Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per MORD Technical Specification Clause 503 & as per direction of Engineer-in-charge. 9 Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 2/3 part 13.2 mm approved stone grit (100% passed from 22.4 mm sieve and retained on 11.2 mm sieve) & 1/3 part 11.2 mm approved stone grit: (100% passed from 13.2mm sieve and retained on 5.6 mm sieve) using bitumen VG-10 @ 1.46 kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity, laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 506 & as per direction of Engineer-in-charge. 10 Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.7 mm size approved stone grit (100% passed from 9.5 mm sieve and retained on 2.36 mm sieve) and bitumin binder VG-10 @ 0.65 kg/sqm laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 508 & as per direction of Engineer-in-charge. 11 Supply & laying of 350 mm dia NP-3 HP Culvert complete in all respect as per MORD Technical Specification Clause 1101 & as per direction of Engineer-in-charge. 12 The Maintenance Cost will be provided for five years @7.50 percent.(The Maintenance Cost will be calculated as per actual executed construction costat the time of final bill) 13 1st Year maintenance cost @ 0.00 percent 14 2nd Year maintenance cost @ 0.75 percent 15 3rd Year maintenance cost @ 1.50 percent 16 4th Year maintenance cost @ 2.25 percent 17 5th Year maintenance cost @ 3.00 percent 18 Construction of unreinforced, plain cement Concreet Pavment, thikcness 15cm, overa prepared sub base, with43 grade cemment or any other typeas per M30 coarse and fine aggregates conforming to IS:383, the maximum size of coarse aggregates not exceeding 25mm, ixed in a concrete mixer of not less than 0..2cum capacity and appropriate weigh batcher using approved mixed design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 mmicron thick polythene film, wedges, steel platesincluding levelling the formwork as pper drawing),,spreading the concrete with shovels, raes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joint, curing of concrete slab for 14 days using curing comppound(where specified) and water finishing lines and grade as per drawings complete in all respects as per Technical Specification Clause 1501 & as per direction of Engineer-in-charge. 19 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge. 20 Providing & laying plain cement concrete 1:3:6 in open foundations as per drawings complete in all respects as per MORD technical specification Clauses 800 /1200 & as per direction of Engineer-in-charge. 21 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M20, RCC 1:1½:3) 22 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications 23 The Maintenance Cost will be provided for five years @2.50 percent.(The Maintenance Cost will be calculated as per actual executed construction costat the time of final bill) 24 1st Year maintenance cost @ 0.00 percent 25 2nd Year maintenance cost @ 0.25 percent 26 3rd Year maintenance cost @0.50 percent 27 4th Year maintenance cost @0.75 percent 28 5th Year maintenance cost @1.00 percent

Tender Detail

9855938
Public Works Department
Tender For Connectivity road from Sarai Inayat Kuandih road via Adda Harijan Basti to Chamraut Basti - Construction of Embankment with Material Obtained from Borrow Pits/Right of way with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 301 & as per direction of Engineer-in-charge. 2 Construction of subgrade and earthen shoulders with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 303 & as per direction of Engineer-in-charge. 3 Construction of granular sub-base grading 1 by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete in all respect as per MORD Technical Specification Clause 401 & as per direction of Engineer-in-charge. 4 WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 5 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 6 Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete in all respects and as per direction of Engineer-in-charge. 7 Providing and applying Primer Coat with bitumen emulsion SS1 grade on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means complete in all respect as per MORD Technical Specification Clause 502 & as per direction of Engineer-in-charge. 8 Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per MORD Technical Specification Clause 503 & as per direction of Engineer-in-charge. 9 Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 2/3 part 13.2 mm approved stone grit (100% passed from 22.4 mm sieve and retained on 11.2 mm sieve) & 1/3 part 11.2 mm approved stone grit: (100% passed from 13.2mm sieve and retained on 5.6 mm sieve) using bitumen VG-10 @ 1.46 kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity, laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 506 & as per direction of Engineer-in-charge. 10 Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.7 mm size approved stone grit (100% passed from 9.5 mm sieve and retained on 2.36 mm sieve) and bitumin binder VG-10 @ 0.65 kg/sqm laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 508 & as per direction of Engineer-in-charge. 11 Supply & laying of 350 mm dia NP-3 HP Culvert complete in all respect as per MORD Technical Specification Clause 1101 & as per direction of Engineer-in-charge. 12 The Maintenance Cost will be provided for five years @7.50 percent.(The Maintenance Cost will be calculated as per actual executed construction costat the time of final bill) 13 1st Year maintenance cost @ 0.00 percent 14 2nd Year maintenance cost @ 0.75 percent 15 3rd Year maintenance cost @ 1.50 percent 16 4th Year maintenance cost @ 2.25 percent 17 5th Year maintenance cost @ 3.00 percent 18 Construction of unreinforced, plain cement Concreet Pavment, thikcness 15cm, overa prepared sub base, with43 grade cemment or any other typeas per M30 coarse and fine aggregates conforming to IS:383, the maximum size of coarse aggregates not exceeding 25mm, ixed in a concrete mixer of not less than 0..2cum capacity and appropriate weigh batcher using approved mixed design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 mmicron thick polythene film, wedges, steel platesincluding levelling the formwork as pper drawing),,spreading the concrete with shovels, raes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joint, curing of concrete slab for 14 days using curing comppound(where specified) and water finishing lines and grade as per drawings complete in all respects as per Technical Specification Clause 1501 & as per direction of Engineer-in-charge. 19 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge. 20 Providing & laying plain cement concrete 1:3:6 in open foundations as per drawings complete in all respects as per MORD technical specification Clauses 800 /1200 & as per direction of Engineer-in-charge. 21 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M20, RCC 1:1½:3) 22 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications 23 The Maintenance Cost will be provided for five years @2.50 percent.(The Maintenance Cost will be calculated as per actual executed construction costat the time of final bill) 24 1st Year maintenance cost @ 0.00 percent 25 2nd Year maintenance cost @ 0.25 percent 26 3rd Year maintenance cost @0.50 percent 27 4th Year maintenance cost @0.75 percent 28 5th Year maintenance cost @1.00 percent
prayagraj
Uttar Pradesh
INR 48.78 Lakhs /-
15-02-2025

Contract Award Details

Bidder List
Bids List
S.No Bid Number Bidder Name Submitted Date Status Remarks Status Updated On
1 111111 Dummy Name 13-Sep-2020 11:40 AM Dummy-Finance Dummy 17-Sep-2020 12:30 PM
2 111111 Dummy Name 14-Sep-2020 01:07 PM Dummy Dummy 31-May-2022 12:40 PM
Contract Date
01-01-0001
}
Contract Value
0.00
Awarded List
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 11111 Dummy Dummy 0
}
Additional Details Available on Click
✓ Bidder List
✓ Contract Value
✓Awarded List

Tender Results Documents

Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail