BRR : 9500501
Tender Brief : Tender For Repairing Of Link Road Gonda Faizabad Marg To Chandapur Nagari. (Premixing And Seal Coat Work By Hotmix Plant) - Earth work in cutting or in embarkment in ordinary soil, excavationto be in theform of regularpitsnot exceedingI/2 metre(20gin deptkand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.The earthfrom cuttingto be used in making embankmentor to be depositedas directedby Engineer-in-charee. 2 WBM Grading - III Providing, laying, spreading and co... Read More
Tender Value
₹
47,90,332
Submission Date
16-10-2025
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
tender for repairing of link road gonda faizabad marg to chandapur nagari. (premixing and seal coat work by hotmix plant) - earth work in cutting or in embarkment in ordinary soil, excavationto be in theform of regularpitsnot exceedingi/2 metre(20gin deptkand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.the earthfrom cuttingto be used in making embankmentor to be depositedas directedby engineer-in-charee. 2 wbm grading - iii providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading iii as per technical specification clause 405 3 providing and applying tack coat with bitumen emulsion (rs-i) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. 4 providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a hotmix plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. 5 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type c seal coat by hotmix plant. 6 s/f of signboard as per direction of engineer in charge 7 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (including cost of material t&p labour but excluding gst) for 1st year maintenance cost @ 0.00% 8 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (including cost of material t&p labour but excluding gst) for 2nd year maintenance cost @ 0.75% 9 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (including cost of material t&p labour but excluding gst) for 3rd year maintenance cost @ 1.50% 10 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (including cost of material t&p labour but excluding gst) for 4th year maintenance cost @ 2.25% 11 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (including cost of material t&p labour but excluding gst) for 5th year maintenance cost @ 3.00%
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results