Tender Brief : Tender for construction work of Chaupal/Barat Ghar in Mazra Taharpur of village Panthupura, 1 Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) SI 253 2 Providing and injecting chemical for precon... Read More
Tender Value
Ref. Document
Submission Date
07-09-2024
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
Work Detail
tender for construction work of chaupal/barat ghar in mazra taharpur of village panthupura, 1 excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge upto a distance of 30 m. from the foundation trenches. (where machine can not move ) si 253 2 providing and injecting chemical for preconstruction anttermite treatment and creating and chemical barrier under and around the column pits wall trenches basement excavation top surface in plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding or pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per i.s. 6313 (part ii 1981) aldrine emulsifiable concentrate or any other approved material such as heptachlor of chlordane will be used. the rate of application of chemical emulsion shall be as follows :- 1.treatment for massonary and foundation5 liters per sqm. 2.back fill in immediate contact with foundation 7.5 liters per sqm. 3 concrete with 4 cm. gauge brick ballast, fine sand of 1.25 f.m. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, tools & plants etc. required for proper completion of the work. si 275 4 m-150 brick work in one cement & six fine sand of 1.25 f.m.) mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work si 303 5 r.c.c. work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 inlintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 b.w.g.g.i. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work includingcost of binding wire. the rate excludes making of drip course which shall be paid extra. si 283 6 12 mmthick plaster with 1:4 cement and corse sand over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. si 584 a 7 earth work in cutting or in embankment in ordinary soil excavation to be in theform of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be in 20 cm. layers including remmingand dressing the surface to required levels and slopes and also including 1.50 m. liftand 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m. distance as directed by the engineerincharge.(royality removed by govt. ) for small works/ abadi area. (where machine can not move ) (s.i. no. 253-a+261-b) 8 m-150 brick work in 1:4 (one cement & four corse sand in superstructure including supply of all materials labour, tools & plants etc. required for proper completion of the work(si no 305a+310+309) 9 r.c.c work in 1:1.5:3for lither beam with cement, c/ sand & 20 mm gauge s/grit(si no 289) 10 r.c.c work 1:1.5:3 with cementc/sand and 2 cm gauge s/grit in t-beam & roof slab as per (si no 284-a) 11 providing and laying brick coba 12mm thick laid with m-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with aerelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30cm x cm and side wall parapet shall be mono tythic plaster wall upto 30 cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including s/o all material, labour, t&p etc complete for proper completion of work. si new item ch 11 12 s/fixing m.c iron havey size for doors, windows , and ventilations shutters with chokhat etc. complete at site (s.i. no. 502-a) 13 m-150 brick workbut in 1:4 (one cement & four corse sand) mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work(s.i no. 305-a) 14 m.s. (tor steel or plain) in plain work such as r.c.c. or r.b. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.(si no 504) 15 12 mmthick plaster ith cement and fine sand of 1.25 fineness modules mortar in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (si no 586) 16 add for extra labour and materials for plaster over rough face of one brick wall.si 596 17 supply and fixing 6 to 8 mm thick ivory or light shades vitrefied tiles 600x600 mm size in flooring and skirting with 1:3approved cement andcoarse sand morter finished with in its cement colour slurry, jointing and polished of approved quality complete, including supply of all materials, labour, tools andplants etc. required for proper completion of the work. as per direction of engineer - in- charge(s.i.no. new item -4) 18 supply and fixing 6 mm. (¼) china white glazed tiles in flooring or in skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and tools and plants. (s.i.no. 628) 19 4 cm thick c.c 1:2:4 in flooring with cement,c.sand and 2cm gauge s/grit mix withoutbase concretein appren (s.i no. 605) 20 s/fixing glass strips of 4.0 mm thick and 35 mm deep (s.i. no. 631-b) 21 s/fixing w.c. sheet (s.i no. 21.12) 22 p/fixing 110mm dia p.v.c pipe (s.i. no. 30-a) 23 providing wall puttyon new surface with approvel quality material of berger/j.k./birla or similar make 2 coats s.i. n0 -new item ch 15) 24 distempering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as berger, j&n, shalimar, asian paint after thoroughly brushing the surface free from mortar dropping and other foreign matters andalso including the surface even with plaster of paris or approved synthetic materials and sand papered smooth including supply of all materials, labour,tools & plants etc.required for proper completion of the work. (s.i no. 649+650) 25 finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials,labour, tools & plant etc. required for proper completion of the work. (s.i. no. 660+661) 26 painting or varnishing work in small areas or new woodwork with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, tools & plants etc. required for proper completion of the work. paint to be used isi marked.(s.i. no. 641+643) 27 s/fixing of sign board at site i/c comp. all respect 28 m-150 brick on edge floor laid dry joints sand filled including preparation of base to proper slope and its ramming including supply of all materials labour and tools and plants etc. required for proper completion of the work. si 615 29 s/fixing fan box at site i/c comp. all respect 30 wiring point for light as per i/c comp. all respect(s.i. no. 131-c) 31 wiring point for fan i/c comp. all respect(s.i. no. 133-c) 32 wiring point for plug i/c comp. all respect(s.i. no. 134-c) 33 s/fixing 6 amp to 32 amp mcb as per i/c comp. all respect(s.i. no.1002) 34 deduct 4% vat
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download techsummary_1648227 aoc document
Download 29de6920-8890-42f9-a6d2-3a3f4e2526cc technicalevaluation notice
Download File Name File Description
Download e1d5c2b8-ecc0-4ca7-b0df-893e352098ad Tender Documents
Download BOQ_1648227 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.