Tender Result - Tender For Re Construction Maya Tanda Highway To Babuapur Baihari Me Raj Kumar Tiwari Ke Ghar Tak - Providing, laying, spreading and compacting stone aggregates of 45-63 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming crushable Stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. 2 Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. 3 Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 4 Providing and applying tack coat with Bitumen using distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 5 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. 6 Providing and laying seal coatby manual means with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type Cas per Technical Specification Clause 510 7 Earth work in Both side Patri.in ordinary soil including lift upto 1.50 mtr. and lead up to 30.00 mtr. and also including ramming dressing the surface to required level and slope as per direction ofE/I. 8 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 15) 9 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 15) 10 The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 15) 11 The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 15) 12 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 15)

Tender Detail

7859729
Public Works Department
Tender For Re Construction Maya Tanda Highway To Babuapur Baihari Me Raj Kumar Tiwari Ke Ghar Tak - Providing, laying, spreading and compacting stone aggregates of 45-63 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming crushable Stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. 2 Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. 3 Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 4 Providing and applying tack coat with Bitumen using distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 5 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. 6 Providing and laying seal coatby manual means with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type Cas per Technical Specification Clause 510 7 Earth work in Both side Patri.in ordinary soil including lift upto 1.50 mtr. and lead up to 30.00 mtr. and also including ramming dressing the surface to required level and slope as per direction ofE/I. 8 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 15) 9 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 15) 10 The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 15) 11 The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 15) 12 The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 15)
ayodhya
Uttar Pradesh
INR 12.50 Lakhs /-
11-03-2025

Contract Award Details

Bidder List
Bids List
S.No Bid Number Bidder Name Submitted Date Status Remarks Status Updated On
1 111111 Dummy Name 13-Sep-2020 11:40 AM Dummy-Finance Dummy 17-Sep-2020 12:30 PM
2 111111 Dummy Name 14-Sep-2020 01:07 PM Dummy Dummy 31-May-2022 12:40 PM
Contract Date
01-01-0001
}
Contract Value
0.00
Awarded List
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 11111 Dummy Dummy 0
}
Additional Details Available on Click
✓ Bidder List
✓ Contract Value
✓Awarded List

Tender Results Documents

Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail