BRR : 7522382
Tender Brief : Tender For Construction Of Lomar To Chakla Link Road Including 5 Year Maintenace - Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 2 Construction of Subgrade with Stablization of Soil with 2% slaked limeConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts... Read More
Tender Value
₹
1,05,00,000
Contract Value
₹ 77,40,766
Saving / Difference
₹ 27,59,234
▲
Submission Date
22-03-2025
Contract Date
19-05-2025
Completion Date
365 days
Participated Bidder List
8 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 83,67,265.68 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 83,72,383.28 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 93,14,020.52 | L8 | |||
| 4 | cnet-technologies | Bid Analytics | 77,40,766 | L1 | |||
| 5 | cnet-technologies | Bid Analytics | 88,52,413.56 | L5 | |||
| 6 | cnet-technologies | Bid Analytics | 89,36,342.1 | L6 | |||
| 7 | cnet-technologies | Bid Analytics | 87,00,932.79 | L4 | |||
| 8 | cnet-technologies | Bid Analytics | 92,12,692.16 | L7 |
Work Detail
tender for construction of lomar to chakla link road including 5 year maintenace - construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per mord technical specification cause 301.5 mord sepecification 301.5(i) s.no. 3.4 2 construction of subgrade with stablization of soil with 2% slaked limeconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per technical specification cause 303.1. including stablization with 2% staked lime including its mixing with rotabator complete. 3 providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at omc to achive the desired unconfined compressive strength and to form a layer of sub base. 4 providing, laying and spreading material on a prepared sub grade, adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at omc to achive the desired unconfined compressive strength and to form a layer of sub base. 5 providing and applying tack coat with v.g.-10 bitumen using bitumen pressure dristributor @ 0.35kg. per sqm. on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503. 6 providinglaying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 80-100 kn static roller capacity finished to required level and grades to be followed by seal coat . claues 508 7 providing and laying seal coat type-c sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using as per technical specification clause 510 8 construction of earthen shoulders with stablization of soil with 2% slaked limeconstruction of embankment in stablized soulder with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per mord technical specification cause 301.5 mord sepecification 301.5(i) s.no. 3.4 9 excavation in foundation in b.c soil including lift up to 15 meterand lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30 mfrom the foundation trenches.(s.i.no. 251) 10 sand filling in plinth including supply of necessaryquantityof sandfrom adistance not exceeding 8 kmfrom the site of work & including watering, dressing etc. rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (s.i.no. 255) 11 cement concrete with 4cm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 1 : 4 : 8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. as per s.i. no.-281 12 providing and laying 1000mm dia reinforced concrete pipe np3 in single row for culverts on type a (concrete cradle) bedding with m 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per data book item no. 9.3 (b) 13 s & laying in the hume pipewith collars in positionwith cement and sandmortarin 1:2 withsunincluding labour and t & p etc. required for proper completion of work as per direction ofby the engineer-in-charge n.p-3-type(a) 600 mm dia 14 supply & laying cement concrete pipe np-3 350 mm dia (burried conduits) on first calss bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation protection works, backfilling. concrete and masonary work in head wall and parapoets as per mord specification no. 1100 sr no. 9.7 as per data book item no. 9.70 15 class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. 16 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. as per si. no.-584 17 cement concrete with 20mm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. as per s.i. 279(a). 18 maintenance of bituminous surface road and gravel of wbm road including filling pot hols and patch repair etc. restroration of rain cuts and dressing of side slop / berms making up of berms / shoulders maintenance of drain, maintenance of culvert, maintenance of guard rails and parapet, maintenance of road sign, speed breakers standing tree at adjacent of road wherever required maintenance of 200m stone (hectometre) and kilometer stones, cutting of branches of trees, shrub and trimming of glass and weeds etc while washing of parapet including cd work, paiting of guard stones, refixing of displaced gaurd stone (as per performance index annexure-1) mentioned in go no-17/2024/ sa-113/23-1-2024-23-1099/113 /2023 dated 16-01-2024 & e-in-c letter no-3689/c-oprmc / mul-2023-24 dated 17-02-2024 subjected to approval from govt. maintenance of 1st year after completion of work @ 0% of total cost of pc work 19 maintenance cost for 2nd year @ 1.50% cost of pc work 20 maintenance cost for 3rd year @ 3.00% cost of pc work 21 maintenance cost for 4th year @ 4.50% cost of pc work 22 maintenance cost for 5th year @ 6.00% cost of pc work
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000