BRR : 7421850
Tender Brief : Special repair work with CC and PC on Chakia Iliya road to Bhatpurwa road. - Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direc... Read More
Tender Value
₹
20,81,000
Contract Value
₹ 14,04,106
Saving / Difference
₹ 6,76,894
▲
Submission Date
10-12-2024
Contract Date
01-02-2025
Completion Date
60 days
Participated Bidder List
5 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 16,53,446.9 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 14,04,106 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 16,50,553.37 | L2 | |||
| 4 | cnet-technologies | Bid Analytics | 20,23,198.96 | L5 | |||
| 5 | cnet-technologies | Bid Analytics | 20,14,518.36 | L4 |
Work Detail
special repair work with cc and pc on chakia iliya road to bhatpurwa road. - providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kn in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density grading-3 as per technical specification clause 405.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 2 providing and applying tack coat with bitumen (vg-10) usingbitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom and air compresser as per technical specification clause 503..(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 3 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen vg-10to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller80-100 kn capacity ,finished to required level and grades to be follwed by seal coat of type -c as per technical specification clause 508.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 4 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingtype c as per technical specification clause 510(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 5 part bmaintainance cost :- maintainance cost will be paid year wise as pergovernment order no. 17/2024/sa.-113/23-1-2024-23-1099/113/2023 date 16.01.2024 and hq uppwd,lucknoworder no. 3689coprmc/mul-23-24 date 17.02.2024 . maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 4 ) 6 1st year- maintainance cost 0%on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 7 2nd year- maintainance cost 1.5% on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 8 3rd year- maintainance cost 3 %on bituminous work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 9 4th year- maintainance cost 4.50% on bituminous work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 10 5th year- maintainance cost 6 % on bituminous work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 11 providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kn in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density grading-3 as per technical specification clause 405.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 12 construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no. 300-2 (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 13 construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 m30(grade) coarde and fine aggregates confoming to is:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and expansion construction joints applying debonding strips primer sealant near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501.asdirectionby thee/i (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 14 excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the engineer in charge up to a distance of 30m. from the foundation trenches including all t&p phowarah and basket etc.as per sor si no-251 complete.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 15 concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. as per sor si no-280. (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 16 providing and laying reinforced cement concrete in superstructure as per drawing and techanical specification clauses 800 (excluding cost of reinforcement). (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 17 supplying fitting and placing tmt bar reinforcement in superstructure complete as per drawing and specification clausees 1002,1010 & 1202. (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 18 part bmaintainance cost :- maintainance cost will be paid year wise as pergovernment order no. 17/2024/sa.-113/23-1-2024-23-1099/113/2023 date 16.01.2024. maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 6 to 12) 19 1st year- maintainance cost 0%cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 20 2nd year- maintainance cost 0.25 % cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 21 3rd year- maintainance cost 0.5 %cc &drain work (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 22 4th year- maintainance cost 0.75 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 23 5th year- maintainance cost 1 % cc &drain work(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000