BRR : 7052696
Click Here To View Tendering Authority. Aoc City/State :  chandauli, Uttar Pradesh
Tender Brief : Tender For Kanharia Village To Ekauni Link Road - Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Grading-3 as per Technical specification Clause 405 (Including labour Material T&P etc. complete as per direction of E/I & also in... Read More
Tender Value
16,55,000
Contract Value
₹ 15,63,991
Saving / Difference
₹ 91,009 ▲
Submission Date
30-11-2024
Contract Date
05-03-2025
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 17,23,965 L2
2 cnet-technologies Bid Analytics 15,63,991 L1
Work Detail
tender for kanharia village to ekauni link road - providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 kn in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. wbm grading-3 as per technical specification clause 405 (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 2 providing and applying primer coat with bitumen emulsion(ss) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per technical specification clause 502(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 3 providing and applying tack coat with bitumen vg-10 usingpressure distributor at the rate of 0.30 kg per sqm on the prepared surface as per temechanical specification clause 503.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 4 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates using vg-10 penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of type c as per tehnical specification clause 508(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 5 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels , grade and cross fall using typec as per technical specification clause 510(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) 6 part bmaintainance cost :- maintainance cost will be paid year wise as per prevailing government order no. 17/2024/sa-113/23-1-2024-23-1099/113/2023 date 16.01.2024.maintainance cost will adjusted as per final cost of constrction and will be paid accordingly 7 1st year - maintainance cost 0% (including labour material t&p etc. complete as per direction of e/i & also including all taxes labour cess but excluding gst. 8 2nd year - maintainance cost 1.5% (including labour material t&p etc. complete as per direction of e/i & also including all taxes labour cess but excluding gst. 9 3rd year - maintainance cost 3.00% (including labour material t&p etc. complete as per direction of e/i & also including all taxes labour cess but excluding gst. 10 4th year - maintainance cost 4.5% (including labour material t&p etc. complete as per direction of e/i & also including all taxes labour cess but excluding gst. 11 5th year - maintainance cost 6% (including labour material t&p etc. complete as per direction of e/i & also including all taxes labour cess but excluding gst.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 149b48b2-bfad-4dd6-a2c1-c9ab71fec7f9
Download boqcomparativechart
Download finance_1713835
Download finsummary_1713835
Download technical_1713835
Download techsummary_1713835
Download Yekaun
Download File Name File Description
Download 4556c233-d268-4903-8bab-744cf526cf97 Tender Documents
Download BOQ_1713835 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000