BRR : 6882194
Click Here To View Tendering Authority. Aoc City/State :  barabanki, Uttar Pradesh
Tender Brief : Renewal Work Of Ramswaroop Purwa To Zaidpur Via Banarki Godianpurwa Link Road In Block Suratganj District Barabanki - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specificationclause 405 (Including cost of all material... Read More
Tender Value
72,50,000
Contract Value
₹ 39,68,806
Saving / Difference
₹ 32,81,194 ▲
Submission Date
20-12-2024
Contract Date
07-02-2025
Completion Date
60 days
Participated Bidder List
5 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 39,68,806 L1
2 cnet-technologies Bid Analytics 53,19,206.33 L2
3 cnet-technologies Bid Analytics 57,80,146.5 L4
4 cnet-technologies Bid Analytics
5 cnet-technologies Bid Analytics 56,90,699.58 L3
Work Detail
renewal work of ramswaroop purwa to zaidpur via banarki godianpurwa link road in block suratganj district barabanki - providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specificationclause 405 (including cost of all material, labour, t&p etc required for proper completion of work also including all taxes but excluding cost of g.s.t.) 2 providing and applying tack coat with bitumen vg-10 using at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503. (including cost of all material, labour, t&p etc required for proper completion of work also including all taxes but excluding cost of g.s.t.) 3 providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using vg-10 bitumento required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either type c as per technical specication clause 508 (including cost of all material, labour, t&p etc required for proper completion of work also including all taxes but excluding cost of g.s.t.) 4 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type c,as per technical specification clause 510 (including cost of all material, labour, t&p etc required for proper completion of work also including all taxes but excluding cost of g.s.t.) 5 construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. (including cost of all material, labour, t&p etc required for proper completion of work also including all taxes but excluding cost of g.s.t.) 6 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 1styear maintenance cost @ charge - 0.00% (total cost of item nos. 1 to 6) 7 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 2ndyear maintenance cost @ pc 1.5% (total cost of item nos. 1 to 6) 8 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 3rdyear maintenance cost @ pc 3.00% (total cost of item nos.(total cost of item nos. 1 to 6) 9 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 4th year maintenance cost @ pc 4.5% (total cost of item nos.(total cost of item nos. 1 to 6) 10 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 5th year maintenance cost @ pc 6.00% (total cost of item nos.(total cost of item nos. 1 to 6)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download f73d9c4e-a451-4ca2-8097-2c86d16b87d0
Download boqcomparativechart
Download finance_1711966
Download finsummary_1711966
Download Ram
Download technical_1711966
Download techsummary_1711966
Download File Name File Description
Download f53a450c-06b0-46c5-9d26-2ddd2fa4a3eb Tender Documents
Download BOQ_1711966 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000