BRR : 6655071
Tender Brief : Tender For Bachrampur Marwahi Sahay Link Road Km 2 To Safipur Gija Dubey Ka Purwa Via Badanpur Link Road - Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. 2 Providing and applying tack coat with Bitumen using ... Read More
Tender Value
₹
17,75,000
Contract Value
₹ 15,48,777
Saving / Difference
₹ 2,26,223
▲
Submission Date
10-12-2024
Contract Date
13-01-2025
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 17,90,016.69 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 15,48,777 | L1 |
Work Detail
tender for bachrampur marwahi sahay link road km 2 to safipur gija dubey ka purwa via badanpur link road - providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405. 2 providing and applying tack coat with bitumen using distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503. 3 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat type c as per technical specification clause 508. 4 providing and laying seal coatby manual means with vg-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type cas per technical specification clause 510 5 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 1st year maintenance cost @ charge - 0.00% (total cost of item nos. 1 to 5) 6 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall ccoommpplleettiioonn ddaattee aanndd ends after five years.(including cost of material t&p labour but excluding gst) 2nd year maintenance cost @ 1.50% (total cost of item nos. 1 to 5) 7 the routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 3rd year maintenance cost @ 3.00% (total cost of item nos. 1 to 5) 8 the routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) 4th year maintenance cost @ 4.50% (total cost of item nos. 1 to 5) 9 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall ccoommpplleettiioonn ddaattee aanndd ends after five years.(including cost of material t&p labour but excluding gst) 5th year maintenance cost @ 6.00% (total cost of item nos. 1 to 5)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results