BRR : 4724147
Click Here To View Tendering Authority. Aoc City/State :  bijnor, Uttar Pradesh
Tender Brief : Tender For Dhampur Nehtaur Road To Milak Jahangirabad Road; 1 Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including labour cess but excluding GST.) 2 W.B.M. G-3 (22.4-53 mm stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam specif... Read More
Tender Value
78,00,000
Contract Value
₹ 76,55,862.59
Saving / Difference
₹ 1,44,137 ▲
Submission Date
30-11-2024
Contract Date
13-12-2024
Completion Date
180 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 76,55,862.59 L1
2 cnet-technologies Bid Analytics 76,71,205 L2
Work Detail
tender for dhampur nehtaur road to milak jahangirabad road; 1 construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. (including labour cess but excluding gst.) 2 w.b.m. g-3 (22.4-53 mm stone ballast) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3as per technical specification clause 405. (including labour cess, royalty but excluding gst.) 3 providing, laying, spreading and compacting graded stone aggregate (wmm) after mixing with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% opc cement and 3.50% emulsion ss-2 in uniform single layer on sub- base/sub-grade and compacting with road roller to achieve the desired density (including labour cess, royalty but excluding gst.). 4 providing and applying tack coat with bitumen vg-10 gradeusing bitumen distributor at the rate of 0.25 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specification clause 503. (including labour cess but excluding gst.) 5 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using vg-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base by mechanical means, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coatas per technical specification clause 508 (by mechanical means, including labour cess but excluding gst). 6 providing and laying seal coat by manual means with vg-10 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type b as per technical specification clause 510 (by mechanical means, including labour cess but excluding gst). 7 brick edging on both sides of the road of first class (m-150) brick on edge laid with mud mortar incluidng labour and supply of bricks finished to be required templete and in proper alignmnet and also including dressing and ramming the excavated earth as directed by the engineer in charge. as per s.i. no. 765. (including labour cess but excluding gst.) 8 maintenance of road for next five year after completion contractor shall be paid total maintenance cost 7.50% (ist year-0%, iind year-0.75%, iiird year-1.50%, ivth year-2.25% & vth year-3.00%) of civil cost for five year in the form of instalment as below. the payment shall be inclusive of cess but excluding gst payment shall be done as per sastisfaction of engineer in charge regarding maintenance work carried out by contractor. (including cess and excluding gst)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download e704ebe2-1ded-41d5-a463-fe02020be1eb
Download boqcomparativechart
Download finance_1714497
Download finsummary_1714497
Download summ
Download technical_1714497
Download techsummary_1714497
Download File Name File Description
Download 848291d7-f613-4311-ba91-2b75ed088b9b Tender Documents
Download BOQ_1714497 Tender Documents
Download t2 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000