BRR : 10631918
Click Here To View Tendering Authority. Price Bid City/State :  PLZ REF TENDER DOCUMENT, Uttar Pradesh
Tender Brief : Tender For Providing New Connection Work-1 Carriage Of Fallowings From Esc. Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd For Proper Completion Of Work, Distance About To 60 Kms. 2 S.T Pole 11 Mtr. Long 3 Pcc Pole 8.5 Mtr Long. 4 Carriage Of All Line Material From Store Center Bsr To J.E Store Sub Station As Acsr Weasel Conductor, Abc Conductor Gi Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator Etc. 5 Erection Of Single Pole Support Including Complete 1 It Fittings As Per Respo Manual And ... Read More
Tender Value
4,24,000
Submission Date
09-07-2020
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 3,99,999.98 L1
2 cnet-technologies Bid Analytics 4,19,649 L2
3 cnet-technologies Bid Analytics 4,21,627 L3
Work Detail
tender for providing new connection work-1 carriage of fallowings from esc. bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 kms. 2 s.t pole 11 mtr. long 3 pcc pole 8.5 mtr long. 4 carriage of all line material from store center bsr to j.e store sub station as acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 5 erection of single pole support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 6 erection of double pole / scation pole support including complete 1 it fittings as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 7 grouting of single support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 8 grouting of double pole support shall be grouted with cement, sand and birck ballast / stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast / stone ballast, etc. as per actual size requirement, as per respo manual and as per direction of engineer in charge including the cost of labour, t&p and carrier etc. required for proper completion of work. 9 carriage of all line material from j.e store sub station to pit site acsr weasel conductor, abc conductor gi wire, earth wire. m.s. chanel, angle, stay & earthig rods, barbed wire. disc insulator etc. 10 cutting / drilling / welding of ms angle iron for making guarding angle size 65x65x6 / 50x50x6 mm including the work of fixing the bracket on pcc / st pole for construction of the line. 11 making / filling of 11 kv cable jointing kit varius size xlpe cable 12 carriage of t / f from esc. bsr to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 kms. 13 25 kva t / f 14 63 kva t / f 15 fixing of 11 kv stay rod with stay wire in proper way with nozelling 16 grouting of 11 kv stay rods 17 laying, sagging. stringing and binding and jumpering of 11 kv xlpe cable 3*70 square mm & outher size newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 18 laying, sagging. stringing and binding and jumpering of acsr weisal , rabbit, dog newly erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t&p, carrier etc. requried for proper completion of work. 19 acsr weisal conductor 20 acsr dog conductor 21 abc cable 3*95 square mm 22 fixing of earthing rod 23 fixing of pin insulator 24 fixing disc insulator 25 fixing of sub station set for t / f 26 mounting & installation of t / f from d / p 27 25 kva t / f 28 63 kva t / f 29 the folloing material is required to be supplied by the contractor. 30 holding clamp 31 11kv cable jointing kit 3*70 square mm xlpe cable 32 double pole clamp 33 f clamp 34 distribution box 35 distribution box clamps. 36 lt clamp 37 pg clamp 38 j hook 39 piercing connector 40 earth clamp 41 stay clamp 42 dead & clamps 43 stay insulator for 11 kv 44 suspension clamps 45 lt insulator 46 x arm holding clamp. 47 bolt & nut off size.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 1aad4fd8-9a3e-4a4d-b0e6-c45afd475a1c financialevaluation notice
Download boqcomparativechart boq document
Download finance_735141 aoc document
Download finsummary_735141 aoc document
Download File Name File Description
Download 1D34783B-8D0E-4F14-88F1-AD5D596DAA7E Tender Documents - Tender Notice
Download Tendernotice_1 Tender Documents - NIT
Download T19PDF Tender Documents - TENDER DOCUMENT
Download BOQ_735141 Tender Documents - boq
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders