BRR : 10060665
Tender Brief : Various Work Under Deposit Scheme And Other Related Work Under Edd-Iii Aligarh .-1 Cartage Of Following Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. 3 St Pole 11 Mtr. 4 Cartage Of Line Material Viz Weasal Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clam... Read More
Tender Value
₹
2,00,000
Submission Date
11-01-2021
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,97,244 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 2,03,338.8 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 1,88,293.1 | L1 |
Work Detail
various work under deposit scheme and other related work under edd-iii aligarh .-1 cartage of following poles store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 2 pcc poles 8.5 mtr. 3 st pole 11 mtr. 4 cartage of line material viz weasal conductor, gi earth wire, cross arm, angle, channel, insulator, clamps & other line material from store centre or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, t&p carrier etc. required for proper completion of work. ( dist. 0 to 50 kms. ) . 5 erection of single support including complete h.t / l.t fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 6 pcc poles 8.5 mtr. 7 erection of 11 kv line double pole on pcc / st pole including the work of complete line as per respo norm manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. 8 pcc poles 8.5 mtr 9 installation & fixing of 11 kv tpmo 10 laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per respo manual and as per direction of supervising engineer, including the cost of arrangement of labour, t&p carrier etc. required for proper completion of work. 11 acsr weasal conductor 12 acsr dog conductor 13 drilling and cutting of tee off channel, v cross arms, top channel, cross bracing angle, ms garding angle, dropper chanel. as per specification of uppcl construction manual including including loading and unloading at the both ends. 14 grouting of pcc / st poles as per respo norms including cost of grouting material ( cement: sand: brick ballast ) size as per respo norms. this qty also includes the additional work of old & existing lt line which has to be converted into ht line. presently the supports of old line do not have grouting. 15 pcc poles 8.5 mtr. 16 st pole 11 mtr. 17 making the plinth of st pole 11 mtr. 18 chopping of tree branches which are touching to 11 kv / lt lines. 19 dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective je’s ( store ) as per direction of supervising engineer. it includes the work of cartage, cost of labour, t&p carrier etc. required for proper completion of work. 20 acsr weasal conductor / gi wire 21 fixing of earthing rod as per respo manual and as per direction of supervising engineer including the cost of labour 22 erection and grouting of stay set including the work of nozzling etc. as per respo manual and also including the cost of arrangement of all grouting material, labour, t&p etc. required for proper completion of work 23 providing and fixing of stay insulator. 24 safe carriage & installation of transformer from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, t&p and carrier etc. required for proper completion of work. ( distance 0 to 50 km. ) 25 10 / 16 kva t / f 26 25 kva t / f 27 63 kva t / f 28 100 kva t / f 29 safe carriage of old line material viz. conductor, g.i. earth wire, abc conductor, cross arm, angle, channel, insulators, clamps & other line material from any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. 30 installation of extra “t”on the old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, t&p etc. required for proper completion of work. the “t”pole shall be grouted with cement, sand and brick ballast / stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast / stone ballast, stone pad etc. as per actual site requirement. 31 safe carriage of lt distribution box ( three phase ) from store centre sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per respo norms. 32 demounting & carriage of following capacity transformer due to damage of pcc poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and t&p etc. required for proper completion of work. 33 25 kva t / f 34 63 kva t / f 35 11 kv ct / pt pole mounting unit 36 safe carriage of xlpe cable of size 3x70 / 3x120 / 3x185 sq. m.m. from store to respective site of work including loading unloading at both ends. 37 laying of 3x70 / 3x120 / 3x185 sq.mm. 11 kv under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. the cable shall be duly protected by ist class bricks, two on either side and third on top of the cable, laid in series one after the other. the work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. spare cable shall be left and buried in the trench in the shape of rings at both ends. all material ( except cable ) , labour, t&p carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 38 providing & filling of 3x70 / 3x120 / 3x185 sq.mm. 11 kv xlpe heat shrinkable cable jointing kits outdoor / indoor type including the cost of labour t&p carrier etc for proper completion of work. 39 safe carriage of 11 kv pilfer proof metering cubicle from store centre, sarsol to site of work including loading and unloading at both ends. average distance approx. 0 km to 50 km. 40 erection & grouting of 11 kv pilfer proof metering cubicle making connections with bus bar, tapping with empire tape with existing earthing. the above work includes the cost of labour, t&p, carrier & material etc. required for proper completion of work except cost of 11 kv vcbs. 41 safe carriage of 11 kv ct / pt pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, t&p and carrier etc. required for proper completion of work. 42 installation of 11 kv ct-pt combined metering unit on double pole after fixing of channel with m.s. clamps and nuts bolts for holding the channel angle etc. the unit body shall be earthed by connecting m.s. strip of size 1 / 8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 kv line shall be connected to unit as per instructions of sdo / ae ( m ) . the m.s. strip & earth rod shall be included in the scope of work. 43 wearing gi pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 kv feeder cable with boxes on the feeder double pole structure and making connections including supply. 44 dismantling of all accessories from the pole. 45 disc insulator 46 pin insulator
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results