View Bid Results For Hardfacing Tenders

We found 65 Bid Results related to hardfacing tenders. You can find Contractor details who won hardfacing tenders along with contract details in Bid awards announcements section.

Filters
Stage
44
19
2
Tender Publishing Platform
27
38
State / UT
14
14
13
12
7
3
3
3
2
2
2
1
1
1
1
Contract Value
23
17
21
4
Publish Date
0
1
0
0
0
Sector
9
24
15
9
6
3
3
2
2
1
Ownership
3
38
14
13
Within keyword
Active filters:
Showing 1–2 of 65 tenders matching your filters
1.
Agriculture #11403160 Technical Bid
Tender for For All Nine Csms Of Punjab , Item Rate Boq Boq_Ver3.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: The Budhewal Coop. Sugar Mills Ltd Name Of The Work: For All Nine Csms Of Punjab Contract No: 98157-01137 , Name Of The Bidder/ Bidding Firm / Company : Price Schedule (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. For All Nine Csms Of Punjab Item Code / Make Number Size/Quantity (In Kg) Reserve Price Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency I) Rate In Rs. To Be Quoted By The Bidder. (Per Kg) Qty. Is To Be Purchased By The Bidder(In Qtl) Vat Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Total Amount Without Taxes In Rs. P Total Amount With Taxes Total Amount In Words , 1. Welding Electrode Make - Ewac Ewacslide 12 , Ewacslide 12 , Ewacslide 12 , Ewactro St 160 , Ewactro St 160 , Ewactro St 160 , Ewactro St 160 , Wunder 160 , Wunder 160 , Wunder 160 , Wunder 160 , Wunder 80 , Wunder 80 , Cast Steel Welding Electrode Make-Ewac Terrochrome/ Cpem-021 , Cast Steel Welding Electrode Make-Ewac Terrochrome/ Cpem-021 , Cast Steel Welding Electrode Make-Ewac Terrochrome/ Cpem-021 , Ewactro Bu4 , Ewactro Bu4 , Ewactro Bu4 , Cpsm -022 Electrodes , Cpsm -022 Electrodes , Cpci 0026 (Ci Machinable) , Cpci 0026 (Ci Machinable) , Ewac Make Ehdp 5600 , Ewac Make Ehdp 5600 , Ewac Te 81(Hard Facing Electrodes) , Ewac Te 81(Hard Facing Electrodes) , Ewac Te 81(Hard Facing Electrodes) , Zuperfab E316 L-16 (Ss Electrodes) , Zuperfab E316 L-16 (Ss Electrodes) , Ewactro Ci 54 (Ci Non Machinable) , Ewactro Ci 54 (Ci Non Machinable) , Ewac Make Spectra St 80L S.S To M. S/ S.S. , Ewac Make Spectra St 80L S.S To M. S/ S.S. , Ewac Make Spectra St 80L S.S To M. S/ S.S. , Ewac Make Spectra C.I 01 , Ewac Make Spectra C.I 01 , Tara Ds93 Dissimmilar Steel , Tara Ds93 Dissimmilar Steel , Terra Ht 96 , Terra Ht 96 , Make Ewac Eunitro U, , Make Ewac Eunitro U, , Cdhf 036 (Hard Facing) , Cdhf 036 (Hard Facing) , Hard Facing Powder Make Ewac 1001 Ebz , Hard Facing Powder Make Ewac 1003 Ebz , Ewac Ok-83.40/ Bu4 , Ewac Ok-83.40/ Bu4 , Welding Electrode Ewactro St 160 , Welding Electrode Ewactro St 160 , Welding Electrode Ewactro St 160 , Hard Facing Electrode Wunder 120 Hz Ewac Alloy Make , Hard Facing Electrode Wunder 120 Hz Ewac Alloy Make , Xuper 660 Nh Ewac Alloy Make , Xuper 660 Nh Ewac Alloy Make , Hf 01 Ewac Make , Hf 01 Ewac Make , Carbon Gouging Electrode Ewac Make , 2.Welding Electrode Make- Esab Hard Facing Electrodes - Esab Cobalarc Mx Make Esab , Unknown Steel Composition Welding - Esab Ok 68.82 , Unknown Steel Composition Welding - Esab Ok 68.82 , Unknown Steel Composition Welding - Esab Ok 68.82 , Ms To Ss And Ss To Ms Welding Electrode - Esab Terroweld Ds4 , Ms To Ss And Ss To Ms Welding Electrode - Esab Terroweld Ds4 , Ms To Ss And Ss To Ms Welding Electrode - Esab Terroweld Ds4 , Roller Journal/ Unknown Steel Welding Electrode - Esab Terrochrome , Roller Journal/ Unknown Steel Welding Electrode - Esab Terrochrome , Roller Journal/ Unknown Steel Welding Electrode - Esab Terrochrome , Ok 83.40 , Ok 83.40 , Ok 83.40 , Esab Duraj 3 , Esab Duraj 3 , Ci Machinable Electrode Esab 802 Kg , Ci Machinable Electrode Esab 802 Kg , Ci Machinable Electrode Esab Ferroloid 1 , Ci Machinable Electrode Esab Ferroloid 1 , Ci Machinable Electrode Esab Ferroloid 1 , Gouging Electrode Ok 21.03 , Esab Bronzoid 1 , Esab Bronzoid 1 , Esab Terroweld Dlh , Esab Terroweld Dlh , Hardfacing Powder Tung Strength-70 , Esab Cobalarc- 9 , Esab Cobalarc- 10 , Esab Terochrome , Esab Terochrome , Esab Terochrome , O.K Ni-Ci (Esab Make) , O.K Ni-Ci (Esab Make) , Welding Electrode Ok Nicrfe-3 , Welding Electrode Ok Nicrfe-3 , Make Esab. Ferroloid 4. , Make Esab. Ferroloid 4. , Make Esab, Terroweld S3. , Make Esab, Terroweld S3. , Hard Facing Electrodes, (Esab Make) Ok Weartrode-62 , Hard Facing Electrodes, (Esab Make) Ok Weartrode-62 , Hard Facing Electrodes, (Esab Make) Ok Weartrode-62 , Carbon Gouging Electrode (Esab Make) , Esab Make Nife Ci , Esab Make Nife Ci , Ok 68.53 , Ok 68.53 , Ok 68.53 , 3.Welding Electrode Make- Essen Essen 80 Brazil Essen Make , Essen 80 Brazil Essen Make , Essen 100 Brazil Essen Make , Essen 100 Brazil Essen Make , Essen 100 Brazil Essen Make , Essen Cement Concrete Road 62/1 Make Essen , Essen Cement Concrete Road 62/1 Make Essen , Essen Cement Concrete Road 62/1 Make Essen , Welding Electrode Essen Nicr8gs , Welding Electrode Essen Nicr8gs , Ci Non Machinable Essen Cast Gh , Ci Non Machinable Essen Cast Gh , Essen Cn 34 Sti , Essen Cn 34 Sti , 4.Welding Electrode Make- Sanweld Hard Facing Electrod Ac/Dc San 79 T , Ss Welding Electrode For Ss-308, Ss-309, Ss-310 & Ss-316 Grade San 47 , Roller Journal Built Up San 51 Ds , Trash Plate Hard Facing Electrode San 77 , Trash Plate Hard Facing Electrode San 78 , Roller Arcing Electrodes San 88Spl , Ci Machinable Electrodes San 61 , Ci Machinable Electrodes San 62 , Unknown Steel Composition Ac/ Dc San 55Ut , Unknown Steel Composition Ac/ Dc San 55Ut , San 50 - Ss To Ss , San 50 - Ss To Ss , San 56Uc - Ss To Ms , San 56Uc - Ss To Ms , San 71X - Crown Pinion , San 71X - Crown Pinion , San 75 Sp Hardfacing Tip Welding , San 75 Sp Hardfacing Tip Welding , San 76Xt- Hardfacing For Hammer Trush Plate , San 76Xt - Hardfacing For Hammer Trush Plate , San 58 Uc - Unknown Universal Electrode , San 58 Uc - Unknown Universal Electrode , San 66X - Ci Machinable , San 66X - Ci Machinable , San 68X - High Nickel Electrode Ci Machinable , San 68X - High Nickel Electrode Ci Machinable , 5.Welding Electrode Make- Ador Ador Make Over Cord S.S. Electrode , Ador Make Over Cord S.S. Electrode , Ador Make Over Cord S.S. Electrode , Ador Make Over Cord. S Electrodes , Ador Make Over Cord. S Electrodes , Ador Make Over Cord. S Electrodes , Ador Make Machineable Sp119 , Ador Make Machineable Sp119 , Ador Make Ss11e (S.S To S.S) , Ador Make Ss11e (S.S To S.S) , Sphf 043 (Hard Facing Electrode For Trash Plate, Static Collar, Hammer) , Sphf 043 (Hard Facing Electrode For Trash Plate, Static Collar, Hammer) , Sphf 043 (Hard Facing Electrode For Trash Plate, Static Collar, Hammer) , Lh 106 (Unknown Steel Composition) , Lh 106 (Unknown Steel Composition) , Lh 106 (Unknown Steel Composition) , Lh 106 Shaft Repair , Lh 710 (Crown Pinion /Crane Wheel) , Lh 710 (Crown Pinion /Crane Wheel) , Lh 117 (C.I Non Machinable) , Lh 117 (C.I Non Machinable) , Lh 214 Ac/ Lh 214 Dc (Gun Metal) , Lh 214 Ac/ Lh 214 Dc (Gun Metal) , Lh 128 ( Roller Journal Building) , Lh 128 ( Roller Journal Building) , Lh 126 ( Ss-Ms Unknown Ss) , Lh 126 ( Ss-Ms Unknown Ss) , Sp124 , Sp124 , Lh 409 (Aluminum Welding Electrode) , Lh 409 (Aluminum Welding Electrode) , Lh 409 (Aluminum Welding Electrode) , Sp125 Ms To Ss , Sp125 Ms To Ss , Make Ador. Lh 104 Heavy Fabrication/ Structure Welding , Make Ador. Lh 104 Heavy Fabrication/ Structure Welding , Make Ador, Ta1 Hard Facing , Make Ador, Ta1 Hard Facing , Gas Brazing Rod Lh 210 Sf , Gas Brazing Rod Lh 210 Sf , Ador Make Lh-115 , Ador Make Lh-115 , Ador Make Lh-115 Ci Machinable & Ci To Ms , Ador Make Lh-115 Ci Machinable & Ci To Ms , Ador Make Lh-783S For Hammer, Anvil Plate, Cutter Knives Hard Facing Hard Facing , Ador Make Lh-783S For Hammer, Anvil Plate, Cutter Knives Hard Facing Hard Facing , Ador Make Lh- 720 Cane Grab Hard-Facing , Ador Make Lh- 720 Cane Grab Hard-Facing , Ss39e (Ss To Ms) , Ss39e (Ss To Ms) , Welding Electrode Sa 81 E Ci Machinable , Welding Electrode Sa 81 E Ci Machinable , Welding Electrode Sp126 Build Up Stainless Steel , Welding Electrode Sp126 Build Up Stainless Steel , Welding Electrode Sp126 Build Up Stainless Steel , 6.Welding Electrode Make- Advani Super Bond Ss Welding Electrode , Super Bond Ss Welding Electrode , Super Bond Single S For Boiler , Super Bond Single S For Boiler Size Make Advani , Super Bond Single S For Boiler , 7.Welding Electrode Gee Make Gemet 209 , Gemet 209 , Gemet 3006 , Gemet 502 , Gemet 502 , Gemet 9L , Gemet 9L , Gemet 301 , Gemet 301 , Gemet 701 , Gemet 701 , 8.Welding Electrode Make- D & H Ss 308L , Ss 308L , Ss 308L , Ss 309L , Ss 309L , Ss 309L , Make - D&H India - Welding Cut Rod , Make - D&H India - Rms - 31 , Make - D&H India - Rms - 31 , Make - D&H India - Rms - 31 , Make - D&H India - Rms - 232 , Make - D&H India - Rms - 232 , Make - D&H India - E-7018-Super-Lh , Make - D&H India - E-7018-Super-Lh , Make - D&H India - E-7018-Super-Lh , Welding Electrode Make- Diffusion C.I. Non Machinable - Difftrode 301 ( Diffusion Make) , C.I. Non Machinable - Difftrode 301 ( Diffusion Make) , C.I. Machinable - Caci - 540 ( Diffusion Make ) , C.I. Machinable - Caci - 540 (Diffusion Make ) , Abroaloy 300 (Diffusion Make ) , Abroaloy 300 ( Diffusion Make ) , Abroaloy 300 ( Diffusion Make ) , Abroaloy 240 ( Diffusion Make ) , Make Diffusion - Difftrode 340 , Make Diffusion - Difftrode 340 , Make Diffusion. Tufaloy 320 , Make Diffusion. Tufaloy 320 , Make Diffusion. Ca-305 , Make Diffusion. Ca-305 , Make Diffusion -Diffusaloy 309Mo , Make Diffusion - Diffusaloy 309Mo , Make - Diffusion - Diffusaloy 565 Crni , Make - Diffusion - Diffusaloy 565 Crni , Make Diffusion - Diffusalloy 800 Elh , Make - Diffusion -Diffusaloy 800 Elh , Make - Diffusion - Diffusalloy 618 , Make Diffusion - Diffusalloy 618 , Make Diffusion - Ca - 012 D , Make Diffusion - Ca - 012 D , Make Diffusion - Superbronze , Make Diffusion - Superbronze , Any Make Approved By Sugarfed, Punjab Make- B&H/ D&H/ Spectrum/ Ewac/ Diffusion/ Ador/ Esab/ Sanweld M.S. General Purpose (Radiographic) Make-B&H/ D&H/ Spectrum/ Ewac/ Diffusion/ Ador/ Esab/ Sanweld/ Any Make Approved By Sugarfed , M.S. General Purpose (Radiographic) Make-B&H/ D&H/ Spectrum/ Ewac/ Diffusion/ Ador/ Esab/ Sanweld/ Any Make Approved By Sugarfed , M.S. General Purpose (Radiographic) Make-B&H/ D&H/ Spectrum/ Ewac/ Diffusion/ Ador/ Esab/ Sanweld/ Any Make Approved By Sugarfed , M.S. General Purpose (Radiographic) Make-B&H/ D&H/ Spectrum/ Ewac/ Diffusion/ Ador/ Esab/ Sanweld/ Any Make Approved By Sugarfed , General Purpose Ferro Speed Electrode Make- Esab/B&H/Gee. , M.S. For Boilers, Excello Make: D&H (I) Total In Figures 0.0 23 Inr Zero Only Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 10
2.
Agriculture #11246514 Technical Bid
Tender for Maschert Knives/Cane Cutting Knives, Fibrizor Tip Holders And Domite Tip Blocks , Maschert Knives, , Supply Of Maschert Knives As Per Drawing No. Ksc/Mh/91622Material - Spring Steel Flat 5Mm Thick X 55Mm Width X650mm , Supply Cane Cutting Knives Manufactured & Supply Of Cane Cutting Knives Manufacture From Shock Absorbent Steel Is: 2062/1984 Code Fe 410Wb, As Per Our Drawing No. Ksc/Lev/911(A) Duly Hard Faced; The Upper Layer Of Knives Will Be Hard Faced With Appropriate Low Heat Hard Facing Electrodes. Guarantee-The Above Knives Will Be Guaranteed For 32-34 Lacs Qtls. Cane Crush , Fixed Type Fibrizor Tip Holder Manufactured & Supply Of Cane Fibrizor Tip Holder, Manufactured As Per Our Drawing No. Mh-Kichha-2023-Fib-005 From Shock Absorbent Steel Is: 2062 Grade B Tested Quality. Duly Hardfaced With L& T Electrode(6006) Note: (1) Hammer To Cut Profile & Duly Fitted With Ss Bush (2) Dark Line Shown Hardfacing (500Bhn) 3 Mm Thick (3) Weight Of All Hammers Should Be 20 Kg Each With Allowable Vatiation ± 20 Gms. Guarantee - The Above Hammer Will Be Guaranteed For 100 Lac Qtl. , Domite Tip Block For Cane Fibrizor ( Zuper Make) Supply Of Original Block Tips Size 90 X 90 X 50 ‘MType Including Stainless Steel/High Tensile Bolt (Bsw) Of Size 22 Mm X 65 Mm Length & S. S. Washers32-34 Lacs Qtls. Cane Crush , Domite Tip Block For Cane Fibrizor (Polyshield Make) Supply Of Original Block Tips Size 90 X 90 X 50 ‘MType Including Stainless Steel/High Tensile Bolt (Bsw) Of Size 22 Mm X 65 Mm Length & S. S. Washers 32-34 Lacs Qtls. Cane Crush
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 4
Uttarakhand View Result →
4.
Heavy Industries and Public Enterprises #10624693 Price Bid
Procurement Of Hardfacing Electrode
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
5.
Road Transport and Highways #9987432 AOC
Bids Are Invited For Title1 Sand paper No 20-120 Title2 Twin Jute/Sutli Title3 Hack saw blade 12inch x1/2 with one side cutter Title4 Hack saw blade 12inch x 1 with one side cutter Title5 Electric Line Tester Title6 Screw Driver Set fo 5 Pcs Title7 Insulated Combination plier 165mm Title8 Hand gloves Rubber Red Title9 Light Duty Drill Machine Title10 Screw Driver 8inch Flat Tip Title11 Screw Driver 8inch Star Tip Title12 Battery Distilled Water Title13 Battery Lead Heavy Duty +ve Title14 Battery Lead Heavy Duty -ve Title15 Cotton Waste Title16 Tyre Pressure Gauge Heavy Duty Title17 Cable Cutter of Size 160 mm or more Title18 Screw Driver 6inch Title19 Screw Driver 18inch Title20 Screw Driver 12inch Title21 Star Screw Drvier 8inch Title22 Combination Plier 9inch Title23 Chisel Title24 Cold Chisel Title25 Non Skid Chain (245/65R17) for Mahindra Scorpio N Title26 Non Skid Chain (235/65R17) for M&M Scorpio Title27 Tyre inflating Hose Title28 File Flate Title29 File Haf Round Title30 File Round Title31 File Trangle Title32 File Needle Title33 Non Skid Chain (235/75R15) for Mahindra Camper Title34 Non Skin Chain (215/75R-15) for Mahinra Bolero Title35 CGS Rod Title36 Zed Alloy Hardfacing electrode 3 point 20mm x 450 mm Title37 MS Shuttering plate size 1Mtr x 1Mtrs Title38 MS Shuttering plate size 1Mtr x 0 point 5 Mtrs Title39 Zed Alloy Hardfacing electrode 4mm x 450 mm Title40 Cast Iron Welding Electrode 224 size 3 point 15mm Title41 Cast Iron Welding Electrode 224 size 4mm Title42 Non Skin Chain (750x16) for Tata 407 Title43 Non Skin Chain (1000x20) for Tipper LC Title44 Brazing Rod Brass 1mm size Title45 Brazing Rod Brass 2mm size Title46 Gas welding MS filler rod 1mm size Title47 Gas welding MS filler rod 2mm size Title48 Hand Gloves leather for welding Title49 Non Skin Chain (16 point 9X28) for JCB Rear Wheel Title50 Non Skin Chain (12 point 5x80-18) for JCB Front Wheel Title51 Welding Glass Black (11 Din) Title52 Welding Glass White Title53 Welding Screen(Make ESAB/ESAB/ADOR/L&T) Title54 Spark Lighter for Gas Welding Title55 Flux for Brazing Title56 Non Skin Chain (16 point 9 x 30) for MU Tractor Title57 Non Skin Chain (1400x25) for Wheel Loader Title58 Gas Welding Cutting Torch (Make ESAB/ESAB/ADOR/L&T) Title59 Blow Pipe for Gas Welding (Make ESAB/ESAB/ADOR/L&T) Title60 Gas Cutter Nozzle 3/64inch (Make ESAB/ESAB/ADOR/L&T) Title61 MS Shuttering plate size 1 point 00 Mtr x 1 point 20 Mtrs Title62 MS Shuttering plate size 1 point 00 Mtr x 0 point 60 Mtrs Title63 Gas Cutter Nozzle 1/16inch (Make ESAB/ESAB/ADOR/L&T) Title64 Nozzle Tip cleaner for Gas cutter Title65 Welding Holder 600 Amps (Make ESAB/ADOR/L&T) Title66 Flash back arrestor for DA Gas Cylinder (Make EESAB/ADOR/L&T) Title67 Flash back arrestor for Oxygen Gas Cylinder (Make ESAB/ADOR/L&T) Title68 Flash back arrestor for DA Torch Mount (Make ESAB/ADOR/L&T) Title69 Flash back arrestor for Oxygen Torch Mount (Make ESAB/ADOR/L&T) Title70 Non Skin Chain (365/85R-20) for Snow Cutter Title71 Non-Skin Chain size 1100x20 for Mahindra Dumper Title72 Saftey Goggles Title73 HSS PS Drill Bit 4mm (Make Totem/Addison/Miranda) Title74 Foam Sheet 6ft x3ft x3inch Title75 Foam Sheet 6ft x3ft x2inch Title76 Power Flux for gas welding of aluminium & its alloys (each packet of 500 gm) Aluminium Title77 Aluminium welding electrodes for manual Arc welding electrode for welding pure AL & its alloy size 3 point 15mm Title78 MS Shuttering plate size 1 point 20 Mtr x 0 point 45 Mtrs Title79 MS Pipe 40mm dia 06 Mtr long Title80 Hand Grinding Stone for angle grinder 100x16x6 Title81 Norton Gold Carbide Grinding Wheel (150 X 25 X 31 point 5mm) Title82 Grinder disc 4 inch Thickness 16 mm (Make Bosch/Norton/Carborundum) Title83 Cutter disc14 inch for Chopsaw Machine (Make Bosch/Norton/Carborundum) Title84 Hand grinder wheel 100x6x16 mm (Make- Bosch/Norton/Carborundum) Title85 Hand Grinder Cut off wheel 107x1 point 5x16 mm (Make- Bosch/Norton/Carborundum) Title86 Packing Paper/fire ply sheet (thickness 2 mm) Title87 Non-Skin Chain size 295/95D20 for AL Tpr Title88 Non-Skin Chain size 295/90R20 for AL Tpr Title89 Banjo washer 10mm (Material Copper) Title90 Banjo washer 12mm (Material Copper) Title91 Banjo washer 16mm (Material Copper) Title92 Banjo washer 17mm (Material Copper) Title93 Banjo washer 19mm (Material Copper) Title94 Banjo washer 20mm (Material Copper) Title95 Non-Skin Chain Size 385/65R22-5 for Snow Cutter Title96 Swivel coupler of 50mm x 50mm Title97 Banjo Bolt 17 mm Title98 Banjo Bolt 19 mm Title99 Fuel pipe (Material PVC Double Layer) Title100 Hose Clamp 0 point 5 inch Title101 Hose Clamp 1 inch Title102 Hose Clamp 1point 5 inch Title103 Hose Clamp 2 inch Title104 Adjustable base plate having threaded screw of 325mm lehgth with captive nut welded to 150mmx 150 mm (6mm thick) plate to allow adjustable of button or top of scaffolding confirming of BIS standards. Title105 Anabond Gasket Sealing tube (50 Gm) Title106 O-Ring Assortment Kit (Contains 407 O rings with 32 sizes of O-rings from 1/16 inch section - 1/4 inch O D to 1/8 inch section - 2 1/4 inch O D) Title107 Adjustable strip head (Dia 36mm) having threaded screw on 450mm lehgth with circular soild disc 120mm dia as adjustable collar confirming to BIS standards. Title108 Nut & Bolts 6x1 mm Title109 Nut & Bolts 8x1 point 25mm Title110 Nut & Bolts 10x1 point 25 mm Title111 Nut & Bolts 12x1 point 25 mm Title112 Nut & Bolts 12x1 point 5 mm Title113 Nut & Bolts 14x1 point 25 mm Title114 Nut & Bolts 14x1 point 5 mm Title115 Nut & Bolts 16x1 point 25 mm Title116 Nut & Bolts 16x1 point 5 mm Title117 Nut & Bolts 16x2 mm Title118 Nut & Bolts 18x1 point 25 mm Title119 Nut & Bolts 18x1 point 5 mm Title120 Nut & Bolts 3/16inch 24TPI Title121 Nut & Bolts 5/16inch 18TPI Title122 Nut & Bolts 3/8inch 16TPI Title123 Nut & Bolts 7/16inch 14TPI Title124 Nut & Bolts 3/4inch 10TPI Title125 Nut & Bolts 1inch 8TPI Title126 Nut & Bolts 1/4inch 20TPI Title127 Nut & Bolts 3/18inch 24TPI Title128 Nut & Bolt for shuttering 12mm dia 40mm long Title129 Propeller Shaft Bolt & Nut 17 (Self Lock) (Make TVS) Title130 Propeller Shaft Bolt & Nut 19 (Self Lock) (Make TVS) Title131 Flat Washer M10 Title132 Flat Washer M12 Title133 Flat Washer M16 Title134 Flat Washer M18 Title135 Flat Washer M20 Title136 Right angle coupler 50mmx 50mm Title137 Spring Washer 17mm Title138 Spring Washer 19mm Title139 Spring Washer 20mm Title140 Spring Washer 24mm Title141 Anabond (85 gm) Title142 PTFE thread seal tape (W) 25 point 0mm x (T) 0 point 075mm x (L) 12M Title143 PTFE thread seal tape (W) 12 point 5mm x (T) 0 point 075mm x (L) 12M Title144 Banjo Bolts (M8x1) Title145 Banjo Bolts (M10x1) Title146 Banjo Bolts (M10x1 point 25) Title147 Banjo Bolts (M10x1 point 5) Title148 Banjo Bolts (M12x1) Title149 Banjo Bolts (M12x1 point 25) Title150 Banjo Bolts (M12x1 point 5) Title151 Banjo Bolts (M14x1 point 5) Total Quantity : 13949
Contract Date: Ref. Documents Contract Value : 1.31 Crore
Government Departments No of Bidders 5
Contract Date: Ref. Documents Contract Value : 13.52 Lakh
Boards / Undertakings / PSU No of Bidders 6
Contract Date: Ref. Documents Contract Value : 11.77 Lakh
Boards / Undertakings / PSU No of Bidders 3
12.
Agriculture #9489710 Technical Bid
Supply Of Hydraulic Grab Capacity 5 Ton And Supply And Commisioning For Season 2025-2026 Supply Of Hydraulic Grab Capacity 5 Ton And Supply And Commisioning For Season 2025-2026 , Tender For Supply Of Hydraulic Grab Capacity 5 Ton And Supply & Commisioning Of Cane Unloader For Season 2025-26 , Supply Of Hydraulic Grab For Cane Unloaderi- Pump, Make - Vickers,Type- Gear, Discharge- 40 Cc/Rev, Maximum Working Pressure- 200 Bar, Operating Pressure- 70 Bar. Ii - Directional Control Valvemake - Vickers, Model- P To T Valve, Pressure Rating- 250 Bar, Flow Raating- 70Lpm., Modular Releif Valve -Make - Vickers, Model- Modular Type, Pressure Rating- 250 Bar, Flow Raating- 70Lpm. Iii - Couplings, Hydraulic Pump To Motor- Hydax 48. Iv- Oil Tank Capacity 140 Ltr. V-Specification Of Grab, Opening- 1.90 Mtrs., Width- 1.90Mtrs. Height- 2.20Mtrs. Weight- 2000Kgs. Approx. Vi- Fingers- Nos. Of Finger 10 Nos., Material- Is 2062, Plate Thickness- 32Mm, Hardfacing Height- 400Mm Min. 500Bhn,Vii- Hydraulic Cylinder, Rod- 50Mm Dia, Bore- 80Mm Dia, Stroke Length- 355Mm, Viii- Filters, Filtration- Suction Strainer+Return Line Filter +Air Breather, Magnetic- Magnetic Seprator Provided, Ix- Electric Moto, Power- 15Hp, Speed- 1440Rpm, Make- Abb/Seimens/Kirloskar/Bbl, Rating/Duty Class- S-1,1. Fabrication Willbe Done Using Prime Plates And Sections And Using Mig Welding Process. 2. Fabrication Of The Grab And Trolley Will Be Done Using Mig Process Of Welding. 3. Only Tack Welding Will Be Done By Electrode Using Arc Welding. 4. Hydraulic Oil Tank Will Be Throughly Cleaned, Welding Spatters And Slag Removed And Tank Epoxy Painted Inside. 5. Trolley And Grab To Be Painted With Golden Yellow Colour.
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 2
Uttar Pradesh View Result →
14.
Agriculture #9486868 Technical Bid
Tender For Competetive E-Bidding For Motor Fabrication & Errection Works - Mill House 2 Cutting of Cheveran Grooveson Mill Rollers 3 Cutting of pine apple grooves on Mill Rollers. 4 Replacement of weak/worn out Runners of cane carrier ,S.RC & IRC and cane unloader power supply angle 5 Welding of oval hole / enlarged holes of attachments of block type chain links and redrilling as per template/profile 6 Replacement of weak/ worn out attachment of block type chain links along with drilling as per template/profile and welding 7 Replacement of worn-out tail end boot of SRC& IRC 8 Fabrication and fitting of new juice rings for mill roller as per sample 9 Dismantling of worn out portion of square bar of long travel and cross travel there after grinding of base plate and fitting , leveling and alignment of new square bar of cane unloader 10 Welding on Wearout Mill and GRPF crown pinion teeth there after grinding of Teeth to make it as per profile 11 Dismantling ,Fabrication & erectionof weak/worn outMill Juice/ waterimbibitionsbox of compound imbibition system 12 Fabrication. & erection. of Mill rollerfeed & discharge bearing cover from 10 mm/ 8mm plate. 13 Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier, MBC and RBCand Bagasse elevator. 14 Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. 15 Dismantling ,fabrication & erection of worn out/ weak cane carrier chain side angle. 16 Dismantling ,fabrication & erection of return cane carrier chain supporting runner/chain guide. 17 Dismantling,Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. 18 Sprocket teeth repairing and strengthening with extra support of IRC/SRC/Elevator/MBC/RBC 19 Repair & hard facing of Auxiliary cane carrier Kicker /Pusher 20 Welding & Hard facing on wear out under feed roller teeth, Shell of roller and enlarging the length of roller as per standerd 21 Replacement of worn-out JuicePlate of screw conveyorat mill 22 Repair and hard facing on cane leveller/ chopper hubs 23 Lever bracket of underfeed roller scraper to be changed & to be fitted on as directed 24 Replacement and hard facing of worn out partition plate of anvil plate with 25 mm plate 25 Hot forging of enlarged / oval holes of cane carrier links to make them as per pre exhisting 26 Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. 27 Fabrication & erection of Rotary filter MS conical juice tank. 28 Repair of cane carrier slates such as worn-out side wear plates holes& other to be done 29 Fabrication & hard facing of under feed roller scrapper as per instructions to be done. 30 Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to bedone & teeth to be made as per profile 31 MS Ring to be fitted on worn-out both side of bagasse pusher at fibrizer& hard facing to be done on Square bars fitted 32 Welding of GRPF Scrapper teethto make them as per profile after hard facing and grinding 33 Repair & hard facing of cane UnloadedGrab Finger 34 Underfeed Roller pinion hard facing/welding 35 Repairing of MS Guard/ cover mill rollers crown pinion 36 Dismantling & fabrication of bagacillo screenas per instruction. 37 Dismantling of sprokets of SRC/IRC/Elevator etc. on drive/trail end shaft and fitting the same with successful trail 38 Rotary screen wornout support box replacement & accordingly strenthening its platform with successful trail 39 SS plates lining on the truff of IRC/ SRC and Mills Head Stock/GRPF Pressure Chute/Nose Plates/etc. 40 Fabrication & fitting of new fish plates of the GRPF pressure chute and also fitting/profile building of the bottom & top new/old scrappers of the same along with patching/linner of 5mm thick ss plate as per sample 41 Build up of oval/enlarged pin holes of links of block type chain and drilling of holes as per pitch or suitable to our pin 42 Patching/ repairing of weak/wornout portion of Cane Unloader No.2 cabinby new/old MS plate size 6mm plate along with proper strengthening 43 Fabrication & Erection of New SRC/IRC Racks as existing design 44 Repairing of old SRC/IRC racks 45 Repairing & hard facing of Fibrizer Hammers Shanks 46 Boiler House 47 Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work 48 Dismantling fabrication & fitting of complete new casing of ID Fan with cone for Boiler (A) 20 ton boiler (B) 30 ton boiler 49 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler 50 Fabrication & erection of weak portion of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. 51 Replacement of worn out/weak portion of Bottom trough & side plate of Old or New Main Bagasse carrier/ Bagasse Elevator/ cross carriers/ RBC/IRC by old/ new MS plates 52 Replacement of worn-out ducting dampers of I.D./ FD Fan, economizer/airheater inlet and outlet dempers with levers and bushes 53 Replacement of worn-out/weak portion of ducting of flue gas at diffirent places with new/old MS plate 54 Fabrication & fitting of bagasse/ash chute for new & old boilers with new/old MS plate 55 Reparing of wet scrubber shell demister of the 20, 30 & 40 Tons Boilerby new/old MS Plate/Flat 56 Fabrication & fitting of bagasse sliding gate for diffirent bagasse Carriers 57 Fabrication & Erection of the bagasse cillo impeller with satisfactory trial as per old sample or as directed 58 Dismantling ofboiler side wall/front wall sealing plate, economizer casingfor replacement of boiler tubes. Dismantled old plates to be fitted with minor repair/patching after replacement of boiler tubes. 59 Replacement/reversing of weak/wornout runners of new MBC /old MBC /bagasse Elevator /Cross Carriers & RBC etc. 60 Repairing of wearout drive/non drive end sprocket teeth by welding and grinding to make profile as per template of all bagasse carrier chains etc. 61 Repair of wornout/ weak boiler FD/ID Fan casing along with successful trial by old/new MS plate 62 Replacement of worn out blower casing of boiler D.M.Plant 63 Replacement of worn out bagasse blower casing at bagasse elevator as per sample or as directed 64 Complete hardfacing of ID Fan Impeller of 20/30/40 Ton boilers 65 Dis., Fab. & Erection of New Boiler I.D. Fan Expantion Joint 66 Dis. Cleaning , Repair & fitting of 20,30 & 40 Ton Boilers internal fitting, 67 Replacement of worn out hanging roof and arch structure of Beam/channel Size- 4”/5” of Boiler No.1 & 2 ofFarnace and detrick arch 68 Fabrication of Bagasse Feeding Jantra of Tractor 69 Fabrication & fitting of worn out / weak bagasse chute at belt conveyor 70 Reparing of Grade Bars of30/40 Ton Boilers 71 Replacement of worn out teeth of bagasse feeder rotating drum of boiler no-3,4 & 5 with satisfactory trial 72 Dismantling, fabrication & erection of ID. Fan blade with Base Plate, Ribs and suction cone.(A) 20 Ton Boiler (B) 30 Ton Boiler 73 Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone.(C) 40 Ton Boiler 74 Fabrication & fitting of worn out chain supporting guide of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC etc. 75 Fitting of new 8mm thick MS plate ring on base plate of boiler ID fan impeller for strengthening 76 Dismantling,fabrication and fitting ofworn out portionof old feed tank ofBoiler No.1,2& 3 77 Replacement of worn out MS Beam and Channel arrangement Size- 4”/5” of Boiler No.1 & 2arch. 78 Dismantling,fabrication and fitting of safty valve worn out discharge assembly with proper support 79 Dismantling of 63.50mm OD X 2000mm long old weak/leaky air heater tubes of M/S LIPPI, make 40 TPH, Boiler no.- 04, Cleaning of tube plates, cleaning & fitting of tube plates holes, cutting as actual length of old tubes, Cleaning of outer surface of old tubes, fitting and erection of provided new/old tube, expanding of both ends of tubes in tube plates and finally leak proof testing of air heater. 80 Replacement of worn out MS Beam and Channel arrangement Size- 8/9 for supporting side wall and roof tubes of Boiler No.4 & 5. 81 Fabrication & erection of new racks for New MBC 82 Fabrication & erectionof new racks for old MBC 83 Fabrication & erectionof new racks for 3rd cross carrier chain 84 Repairing weak portion of racks of all bagasse carrier chains 85 Evaporator & Clarification House 86 Dismantling, cleaning ,repairing & refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial 87 Dismantling, fabrication & erection work of Evaporator body/ Semikestner/vapour shell complete with saveall of uttam quad set. 88 Major repair of save all of the evaporator body/Semikastner /vapour shell along with leak proof water and vacuum trail 89 Dismantling, fabrication & erection ofweak/ worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover , leak proof water and vacuum trial 90 Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial 91 Dismantling, Fabrication & erection of sulphur furnace secondry cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial 92 Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its exhisting connection 93 Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station by providing all its exhisting connection 94 Dismantling, fabrication & erection of weak / leak condenser at vacuum filter. 95 Dismantling, fabrication & erection of Muddy juice receiving tank complete with all connection & associated pipe lines along with leak proof trial 96 Dismantling, fabrication & erection of mud tray of vacuum filter 10’ X 20’ vacuum filter along with satisfactory trial 97 Dismantling, fabrication & erection weak mud agitator of 10’ X 20’ vacuum filter along with satisfactory trial 98 Dismantling, fabrication & erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial. 99 Dismantling Fabrication & fitting of weak/worn out portion of bagacillo pipe with MS/GI plate size 18 100 Dismantling , fabrication & erection of weak/ worn out portion ofclear juice Liquidation box along with leak proof trial 101 Dismantling, fabrication & erection of weak/ worn out clarifier mud boot along with leak proof trial 102 Disamantling,Fabrication & Erectionweak shell of compartment no. 1 & 2 of Juice clarifier (Big) Work of New DORR Dia 28 ,Capacity 3750 HL Body shell including completion of all connections & leak proof trial. 103 Disamantling,Fabrication & Erectionweak shell of compartment no. 1of Juice clarifier (Small) Work of New DORR Dia 24 ,Capacity 2550 HL Body shell including completion of all connections & leak proof trial. 104 Disamantling,Fabrication & Erection of weak shell of juice sulphiter 320 HL including complition of all connection & leak proof trial 105 Dismantling, fabrication & erection ofJuice catcher for Raw/vacuum/sugar melter /sulphitedJuice pumpswith suction/ delivery connection 106 Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. 107 RepairingofSO2 furnace sublimation pipe with its leaking Tower etc. with testing 108 Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. 109 Fabrication & erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial. 110 Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. 111 Dismantling, fabrication and erection of weak/ leaky recovery tower of juice sulphiter/ Syrup Sulphiter. 112 Repairing of Umbrella and Providing essential supports of Quad & Pan. 113 Dismantling, fabrication & erection of worn out Umbrella of Quad & Pan with Old/New Plates. 114 Dismantling, fabrication & erection ofsaveall ofQuad old bodies 115 Dismantling, fabrication & erection ofsaveall ofQuad Uttam set. 116 Replacement of worn-outtop conical portion ofQuad & Vapour Shell with save all proper strengthening with associated machinery 117 Dismantling of worn out arms and shell (outside & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. 118 Dismantlingof worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. 119 To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial 120 Dismantling ofworn outjuice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. 121 Replacement of wornout mud scrapper plate & fitting of mud scrapper at Vacuum Filter. 122 Disamantling,Fabrication & Erection of worn out juice baffel plate of Dorr compartment. 123 Fabrication & erection of new sulphur furnace having burning capacity of 140kg/hr & burning area 01Sqm.as per old sample & fitted with of all connections. Complete in all respect with water & Gas Trial. 124 Major repair of lime slaker with proper alignment & trial 125 Dismantling, fabrication & erection of Weak/Leaky After burner/Primary cooler vessel for So2 furnace.Complete in all respect with leak Proof Trial. 126 To replace worn out sulphur furnace header of size 8”/10” between after burner & Cooler. 127 Dismantling, fabrication & erection of ammonia pipe inside new/old Evaporator bodies. 128 Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc. 129 Replacement of partition plate of old door Compartment/Intermediate tray with 5/6 mm MS plate 130 Replacement of leaky cooling coil of C twin vertical crystalizer, B mono vertical cryst. with 3 size ms pipe with proper hydraulic testing and trial. 131 Dismantling, fabrication & erection of weak Portion Calandria shell of 700 Sqm. 5th Quad body of uttam set with leak proof water vacuum trial. 132 Repairing of B & C massecuite mono Cryst. Leakage coil with Hydraulic testing & successful trial. 133 Dismantling of existing 560 Sqm H.S. Area of Quad body first (Jagat Set Clandria ) Providing the Support for Stay the Shell above Calandria,Unloading of New Clandria from Vehicle by their resources shifting of new Calandria at the site. Fitting and Erection of Calandria at the Place of Old Clandria with Shell fitting of bottom cone of Calandria inlet Vapour/Exhaust steam Connection, water line connection and making all other connection to run the body complete in all respect. 134 Dismantling the existing Vapour Pipe between Uttam Quad Set Body No 2 & 3 along with Right angle valve correcting the size of vapour inlet nipple of body no 3 as per right angle valve, fitting of right angle valve on nipple of vapour entry to 3rd body and making the new provision of vapour pipe from out going vapour line of FFE to right angle valve along with leak proof trial. 135 Fabrication of New tank and fitting of vertical stirrer along with drive for melting of Brown sugar .Fabrication & fixing of new bed and fitting of pump & motor for lifting of melt along with all connections as directed and satisfactory trial of system. 136 Fabrication and fitting of M.S. structure and laying out & fixing of G.I. sheet for over head covering of moulding hearth complete in all respect. 137 Pan House 138 Repairing of down-take of Pan for 40/50 Ton Pan 139 Repairing of down-take of Pan for 60/80 Ton Pan 140 Replacement of worn out/broken angle arms of crystallizer & replacing of paddel type arms with ribbon type of air cooled/vaccume cryst. 141 Dismantling of Gutter of Molasses Magma & massecuite. 142 Fabrication & fitting of Gutter of Molasses, Magma & massecuite. 143 Repairing of hinge type cover of Gutter 144 Replacement of worn-out condensate box of pans, quad & juice heaters 145 Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 40/50 Ton pan 146 Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 60/80 Ton pan 147 Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan 148 Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan 149 Replacement of worn out distributor by new for 40/50 Ton Pan 150 Replacement of worn out distributor by new for 60/80 Ton Pan 151 Repair of wornout/ broken Arm/ Ribbon of air cooled, vacuum & seed crystallizer 152 Replacement of weak sight glasss flanges of Pan & Evaoparated Body along with leak proof water and vaccuum trial. 153 Dismantling , fabrication & erection of 40 Ton pan complete body shell along with save all, umbrella, feed header, top taper cone , distributor,man hole ,sight glasss flanges,all pipeline connections with 12/10mm MS plate with leak proof water and vaccuum trial. 154 Replacement of complete worn-out/ weaktop cone of 40/50 TonPan by new withsupports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial. 155 Replacement of complete worn-out/ weaktop cone of 60/80 TonPan by new withsupports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial. 156 Strengthening of 40/60 Ton Pan body &Taper Portion with channel etc. 157 Replacement of worn out bushes of air cooled crystallizer of both side after dismantling all drive arrangement (worm wheel, reduction gear) and there after fitting ,alignment after replacement of bush (bush will be provided by factory) 158 Dismantling Fabrication & Erection of Box type feed header for each Pan with all related connections including valves, nipples,flanges etc. 159 Dismantling Fabrication & Erection of weak portion of pan shell with 12mm MS plate along with leak proof water & vacuum trial. Welding must be double coated from outside & inside. 160 Replacement of weak/wornoutside & bottom plate of cold/hot water over head tank, syrup tank & Molasses storage tanks at pan station by providing proper strengthening 161 Fabrication & erection of complete new down take of 40/50 ton pan along with leak proof water and vacuum trial 162 Fabrication & erection of complete new down take of 60/80 ton pan along with leak proof water and vacuum trial 163 Repairing of weak/worn out save-all of 40/50 Ton pan along with leak proof water and vacuum trial 164 Dismantling, fabrication and erection of pan save all with proper trial 40/50 Ton along with leak proof water and vacuum trial 165 Dismantling , fabrication & erection of 80 Ton pan complete body shell along with save all, umbrella, feed header, top taper cone , distributor,man hole ,sight glasss flanges,all pipeline connections with 16mm MS plate with leak proof water and vaccuum trial. 166 Dismantling, fabrication and erection of 60/80 Ton pan save all along with leak proof water and vacuum trial 167 Repairing of weak save-all of60/80 Ton pan along with leak proof water and vacuum trial 168 Repairing/patching of weak portion of roof of molasses tank no 1 & 2 169 Dismantling,Fabrication & Erection of Wornout Portion of the Chute for Pan Discharge Valve with Satisfactory trial. 170 Repairing / patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor. 171 Disamntling,fabrication & fitting work of 80Ton Pan save all internals 172 Dismantling , fabrication & erection of 80 Ton pan partial weak body shell and complete top taper cone along with save all, umbrella, feed header , distributor,man hole ,sight glasss flanges,all pipeline connections with 16mm MS plate providing supports to associate machinary along with successful water & vaccuum trial. 173 Centrifugal House 174 To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine with proper Trial. 175 To Replace worn-out Molasses Casing of “A” Centrifugal Machine followed by satisfactory trial. 176 Replacement of worn out portion of horizontal sugar melter shell with steam & juice connection followed by leak proof trial. 177 Dismantling ofexisting stirrer shaft of magma mixture of B/C Continuous machine Straightening of worn out shaft, replacement of Bushes, re-fitting of shaft, arms and alignmrnt of drive system with satisfactory trial. 178 Replacement of weak/worn out portion of sugar hopper. 179 Broken Shaft of Cryst. to be made correct or replaced by new one.Alignment is to be done afterproper ftting of arms and ribbon . 180 Replacement ofworn-outbushes & Arms of Sugar Melter with satisfactoty trial. 181 Replacement of weak/leaky suction pipe of MF- 50X50/ 40X40 injection & spray pump as per old sample.Making and fitting of stone catcher.Fitting of Pipe with Pump. 182 Dis.,fab. & Erection of weak body shell of pugmill, melter & Magma Mixer of A, B & C FW/AF C/f Machines. 183 Dis. & Fitting work of bushes of melter, Magma mixer & sugar elevator. 184 Replacement ofworn- out/weak molasses ring along with Fingure of WK-1500 C/F machine complete in all respect. 185 Dis.,fab. & Erection of New. Fan ofE.T.P. aerator 186 Disamntling,fabrication & fitting work of structure including rubber scrapper drum of ETP clarification Pit. 187 Fabrication,Erection and Fitting work of Spray Pond mesh type inlet channel stainer Size-2.5mtx2.5mt 188 Disamantling,Reapiring & Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no.10 Condensor. 189 Dismantling ,Fabrication & Erection of weak/wornout delivery Pipe of injection pump having one end reducer. 190 Disamantling,fabrication & fitting work of injection header Suction Pipe Mesh type Stainer. 191 Replacement of existing C.I. Sluice type Cutover Valve by Rubber seated right angle type valve. 192 Replacement of worn out channel after De-grouting & Re-fitting of A4/A5 side hopper no. 04new Channel,Clit insize 4 X4 fitting of wooden strip. 193 Replacement ofworn out/broken padestal arms of magma mixture & pug mill. 194 Replacement ofweak/wornout Perforated Sheet of hopper & fitting with frame 195 Dismantling Fabrication and erection of air diffuser for ETP from old boiler tubes 196 Replacement of worn-out bed/base plate of sugar exiter with proper strengthening of old grader. 197 Replacement of damaged /worn-out arms of mono crystillizer 198 Dis.,fab. & Erection of MS Coil of 1 dia for WK-1500 & SC1350-KT C/F Machine with 3mm perforation. 199 Dis.,fab. & Erection of New Molasses storage tank(1.5mtr dia X 1.5mtr height) with 08mm MS Platefor A Centrifugal Machine and Providing with all connection,nipples etc. 200 Dismantling of existing Gate type masscuite taking valve 1250 Batch type machine & fitting of Pneumatic type Butterfly valve inplace of above & make in all necessary provision with satisfactory trial. 201 Dis.,fab. & Erection of wornout/weak Conical Discharge Chute for Contniuous machine with 06mm New/Old Plate (as per sample). 202 Dismantling of M/S Backawwolfmake SC-1350 KT continuous C/F Machine along with Motor,Panel,Base Plate & Other accessories & keeping the all dismantled equipment/accessories as directed. 203 Disamntling of M/S Balchand Nagar make WK-1500 C Fore Worker Machine No.1 including Machine,Motor,Panel & Other accessories.Shifting this machine at place of dismantled C after work Machine No.2 making the provision in structure to suite for fitting of this Machine.Fitting & Erection of this machine along with all related works like modification in structure,raising the height of Pug Mill if requird,Providing all connection along with satisfactory trial of the machine. 204 Unloading the New 1500 mm Basket Dia M/S Balchand Nagar/Thyssen Krupp make Continuous centrifugal Machine along with accessories from Vehicle and shifting of Machine all accessories at the site of installation making necessary alternation in existing structure as per suitabilty of new machine.Erection & Commissioning of new machine and accessories like Motor,Panel,Lubrication System etc.Making all Connection as per drawing or machine manual & satisfactory load trial of machine. 205 Dismantling Fabrication & fitting of man hole of vertical crystallizer 206 Dismantling of existing WIL make 1250Kg/charge capacity machine no 2 & 3 along with all accessories and motors & panel shifting and keeping of these machines and motors at directed place. Shifting and re-fitting of existing pug mill after shortening its length and suitable for one no 1250 Kg/charge machine. 207 Unloading of New 1750 Kg/charge machine along with all accessoriesie . motor , panel etc from vehicle. Strengthening the existing column 2 base structure of dismantled 1250 Kg/charge machine making essential modification in existing structure to suit the foundation of new machine ,Erection of new 1750 Kg/charge machine in all respect , fitting & commissioning of new/old pug mill as suitability to new machine, shifting & fixing of new drive control panel ,providing the all connection to new M/C as per drawing / manual and satisfactory commissioning of new machine in all respect. 208 Schedule Work Dismantling , fabrication & erection of MS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc upto 12 dia 209 Dismantling of M.S. Pipe Line including bend/flange etc Upto 12” dia 210 Fabrication & Erection of M.S. Pipe Line upto 12” dia 211 Dismantling ,fabrication & Erection of Bend upto 12” dia (MS) 212 Dismantling ,fabrication & Erection of Nipple upto 12” dia (MS) 213 Dismantling ,fabrication & Erection of Cross upto 12” dia (MS) 214 Dismantling ,fabrication & Erection of Tee upto 12” dia (MS) 215 Dismantling ,fabrication & Erection of Flange upto 12” dia (MS) 216 Dismantling ,fabrication & Erection of Blind upto 12” dia (MS) 217 Dismantling ,fabrication & Erection of Reducer upto 12” dia (MS) 218 Dismantling ,fabrication & Erection of Elbow upto 12” dia (MS) 219 Dismantling , fabrication & erection of SS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc upto 12 dia 220 Dismantling ,fabrication & Erection of Bend up to 12” dia (SS) 221 Dismantling ,fabrication & Erection of Nipple up to 12” dia (SS) 222 Dismantling ,fabrication & Erection of Cross up to 12” dia (SS) 223 Dismantling ,fabrication & Erection of Tee up to 12” dia (SS) 224 Dismantling ,fabrication & Erection of Flange up to 12” dia (SS) 225 Dismantling ,fabrication & Erection of Blind up to 12” dia (SS) 226 Dismantling ,fabrication & Erection of Reducer up to 12” dia (SS) 227 Dismantling ,fabrication & Erection of Elbow up to 12” dia (SS) 228 Dismantling & fitting of valve upto 12 dia 229 Dismantling of valve up to 12” dia 230 Fitting of valve up to 12” dia 231 Dismantling fitting of valve above 12 dia 232 Dismantling of valve above 12” dia 233 Fitting of valve above12” dia 234 Dismantling Fabrication & fitting of man hole 235 Dismantling , fabrication & erection of MS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc above 12 dia 236 Dismantling ,fabrication & Erection of Bend above 12” dia 237 Dismantling ,fabrication & Erection of Nipple above 12” dia 238 Dismantling ,fabrication & Erection of Tee above 12” dia 239 Dismantling ,fabrication & Erection of Flange above 12” dia 240 Dismantling ,fabrication & Erection of Blind above 12” dia 241 Dismantling ,fabrication & Erection of Reducer above 12” dia 242 Dismantling ,fabrication & Erection of Elbow above 12” dia 243 Dismantling of M.S. Pipeabove 12 “ dia 244 Fabrication of M.S. Pipe above 12” dia 245 Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. 246 Dismantling of old worn-out Platform 247 Fabrication & erection of platform by using old plate 248 Fabrication & erection of Cat/monkey Ladder 249 Fabrication & erection stair case 250 Fabrication & erection of railing from old Material 251 Fabrication & erection of railing from old Material 252 Fabrication & erection of T ring for strengthening of evaporator /Pan vapour Pipe 253 Dismantling ofS.S. Pipe Linewith bend & flange upto 12 dia 254 Fitting of S.S. Pipe Line with bend & flange upto 12 dia 255 Dismantling of MS heavy structure / Tank 256 Dismantling of MS Light structure 257 Fabrication & Erection Light structure 258 Fabrication & Erection heavy structure 259 Fabrication of Pump bed with Pump, Reduction gear & motor alignment up to 30 H.P. 260 Fabrication of pump bed with pump, reduction gear box & motor alignment above 30 HP 261 SS Plate lining in different size for various equipments. 262 Dismantling & cleaning of MS Pipe Line with bend, flange , nipple etc. 263 Fitting of MS pipe line with bend, flange ,nipple etc after cleaning 264 Fabrication & Erection ofcomplete Square / Rectangular /Round Tank with conical Bottom 265 Fabrication & fitting ofMS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) 266 Fabrication & fitting ofSS Coil 267 Welding work for various equipments in B/H 268 Dismantling , Fabrication & fitting ofnew Coneand umbrella anywhere in the factory. Cone up to 01 Mtr. Dia 269 Dismantling, Fabrication & fitting of new Coneand umbrella any where in the factory.Cone above 01 Mtr. Dia upto 2.5mtr dia. 270 Dismantling , Fabrication & fitting of new Coneand umbrella any where in the factory, Cone above 2.5 Mtr. Dia 271 Fabrication and Patchwork of equipmentsusing old/ NewMS plateby 6/8 mm thick plate overround vessels/any vessels 272 Dismantling ,Fabrication & erection of Carbon steel seamless steam Pipe A-106 Grade BLine including bend/flange etc size -219.1mm OD (8 NB)
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 3
Uttar Pradesh View Result →
15.
Agriculture #9482956 Technical Bid
Tender For Competitive Job Febrication - At each station/unit in the mill, the old and weak pipes of 1 inch to 12 inch dia should be cut and removed and replaced with new old pipes by making new flanges and give trial.At each station/unit in the mill, the old and weak nipples of 1 inch to 12 inch dia should be cut and removed and replaced with nipples made from the pipes made available and give trial. Cutting and removing the old and weak bands of 1 inch to 12 inch dia at each station/units inside the mill and making a vand from the pipes provided in its place and giving trial.Removing the old and weak valves of 1 inch to 12 inch dia at each station units inside the mill and making a tee from the pipes provided in its place and giving trial.Cutting and removing the old and weak bands of 1 inch to 12 inch dia at each station units inside the mill and making a tee from the pipes provided in its place and giving trial.Patching and giving trial by installing MS plate on the sore and weak units at various places inside the mill.Removing the sore platform at various places/stations inside the mill and making a new platform from the plate/angle/channel rangeil/channel provided in its place. Cutting and removing the loose and weak round and square tanks installed at various places inside the mill and in its place making a new round/square tank from the iron provided and installing it.Cutting and removing loose and weak gutters at various places and making a new gutter from the iron provided and installing it and giving it a trial.Dismantling, fabrication and erection work of loose and weak round and square light and heavy structures inside the mill.Making and installing new planks of size 1 inch to 48 inches from the iron pipes provided by the mill.Opening, unloading, cleaning and installing pipe lines of various sizes inside the mill.Removing loose/weak MS cone and making and installing a new cone in its place - up to one meter dia.Removing loose/weak MS cone and making and installing a new cone in its place - up to one to two and a half meters dia.Cleaning the leaky welding at various places inside the mill/boiling house and doing leak proof welding and giving it a trial. Making and installing beds from available iron as per requirement for motors installed at various places inside the mill for 05 to 10 horse power.Making and installing beds from available iron as per requirement for motors installed at various places inside the mill for 11 to 25 horse power.Making and installing beds from available iron as per requirement for motors installed at various places inside the mill for more than 28 horse power. Prove serviceability on mill rollers.New RollerProve serviceability on mill rollers. RollerOldMake runners from plate iron and fit neck runners of cane carrier, rack carrier bagasse carrier bagasse elevator and cash carrier.Make runners from flat iron and base angle and fit neck runners of cane carrier, rack carrier bagasse carrier bagasse elevator and cash carrier.Remove square bar rail from neck of bridge and trolley of cane unloader and make another square bar/rail and fit it in its place. Make square bar/rail with plate and fit it.Cut out and remove the weak old juice trough tray from neck of mill and make a new trough/tray from 6/8 mm plate and fit it and give leak proof trial after making connection of related pipes etc.For two drain/TRPF rollers of mill, make bagasse scraper chute and fit it and give trial.Make a new neck guard of mill cown pinion and fit it and give trial.Welding and grinding the worn out teeth of TRPF cow pinion to correct size.Welding and repairing the worn out eaves of can unloaders.Cutting out the weak deflector plate of the fiberizer and replacing it with a new one made from 12 mm plate. Taking out the defective shaft of final motion transmission gear of the mill and fitting the shaft provided by the mill committee and giving it a successful trial.Removing the old plumber block of transmission gear of mill no.2 and fitting the new block provided, aligning it and giving it a trial.Cutting and removing the broken/tight-sided side plates of the pockets of the pocketed type anvil plate of the fibrizer and repairing the damaged pockets with the provided 25/32 mm thick plate, hard facing it and doing two to three coats of welding on both the sides.The side plate of the fibrizer hood has become weak due to wear and has failed, cutting and removing them and making the side plate of the hood from 10/12 mm thick MS plate as per the old one and fitting it in place, putting rivets, doing the necessary hard facing and giving a satisfactory trial. Replacing the pocket type hollow/weak box of pressure plate with 25 mm plate provided by the mill. Cutting and removing the melted discharge suit of mills and replacing it with a new/old plate of 6/8 mm thickness. Cutting and removing the box of crooked/misaligned channel of the base fitted at the bottom and side of the trough of the rack carrier, straightening and re-correcting it and aligning it by fitting square bar. Cutting and removing the weak, hollow half round plate fitted at the tail of the trough of the chains of the rack carrier. Preparing the 1200 mm MS plate as per the sample and fitting it at the place, making it leak proof by welding and giving a satisfactory trial. Cutting and removing the neck and weak platform and ladder of the chimney of boiler no. 1 and 2 installed in the mill committee and fabricating the platform and ladder from the iron provided by the mill committee and installing it and giving it a trial.Removing the shuttering from the neck of boiler no. 1 and 2 and making and installing new shuttering.Opening the bend of the economizer of both the boilers of 20 tonne capacity, taking down the coils of economizer and cleaning the fins of the coil properly and painting them with the paint provided by the mill committee and repairing their bases etc. and climbing up all the 48 pipes and tying the bend and successfully giving a hydraulic trial at 32 kg pressure. Pa Replacing the high pressure steam line with valve planch installed in the mill unit and the exhaust line with valve planch from the mill turbines going to PRDS and giving it a successful trial.3 dia steam lineDia steam line12Dia exhaust line14Dia exhaust lineFabricating new impeller of Bagasilo blower / secondary air fan and fitting it completely in the new shaft and fastening it on the unit and giving it a trial.Cutting and removing all the Bagasilo screens (found defective) and fitting the provided skins according to size.Cutting and removing the neck roof of boilers and re-roofing them with the provided angle, platechannel, pipe. Fabricating the frame as per sample from the given MS plate for internal fitting of the steam drum of boiler no. 10 2.Fabricating the box as per sample from the given MS plate and SS mesh for internal fitting of the steam drum of boiler no. 3.Hardfacing work of the blades of the secondary air fan / Vegas dyer fan fitted on the boiler.Fitting the corroded cable trench made in the power house by making a new trench from 03 mm plate and installing supports etc.Unrolling and bringing down the fans (which take out hot gas) installed on the roof of the power house and installing the repaired / new fan given by the mill committee at the place and getting it successfully trialled.The drive end structure of bagasse elevator/ RBC/ Cass carrier which has become very crooked and its alignment was also not found to be correct. Correction and alignment with the provided iron (channel plate etc.).Removal of the melted vapour exhaust spray and injection pipes of 350 to 1200 mm dia. Make a new pipe of the same size from the available iron and install it.Open and clean the spray pipe, nozzle installed on the spray pond, paint it and tie it back at the place and give a trial.Removal of the old and corrugated meshes of the suction pipes of spray injection pumps and make a new mesh and install it.Cutting the neck/ weak feeding suit of lime slaker and fabricating suit as per the previous requirement with old/ new plate and fitting it at the place and making it leak proof and giving a successful trial. Removing the ammonia perforated coil at the throat of quad/semi-cancer paper cell and making a new coil in its place. Removing the weak/wrinkled beams and channels installed for supporting various bodies and strengthening them by installing new ones. Opening the blinds of all the branch lines and main lines installed in the spray plant, cleaning the clogged nozzles, replacing the damaged nozzles and clusters and cleaning the lines by flushing them, tying all the blinds and making them leak proof. Cutting and removing the weak header installed in the delivery line of the pumps installed inside the spray house and installing a new header with connections from an 8 mm plate and making and installing a new delivery pipe and giving it a trial. Cutting and removing the top cover of the box installed in the suction line of the injection pump and removing its mesh and making and installing another mesh in its place and fitting it again by welding the header. Cutting and removing the weak parts of the neck of different sizes of injection header and in its place fabricating pipe from 8/10 mm thick new/old plate and fitting it in place and making it leak proof and giving satisfactory trial.Repairing the neck parts of cell, bottom and recovery tower of syrup sulphiter by applying patch and giving satisfactory trial.Cutting and removing the neck/weak parts of structure at drive/driven end of mud conveyor belt, fabricating and fitting as per instructions and giving trial.Repairing the neck/damaged umbrella of pano quad and fixing it by welding by applying support and giving trial, ETC.
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 3
Uttar Pradesh View Result →
16.
Agriculture #9482558 Technical Bid
Tender For Competitive E-Bidding For Dismantling, Fabrication And Erection Work Of Various Items And Pipelines For Season 2025-26 - Making and installing new covers of pinions of mill rollers.3 Repairing and installing damaged and corroded juice trays fitted under TRPF.4 Cutting and removing damaged and worn out runners of can carrier, bagasse carrier, rack carrier and installing grinder and installing new runner.5 Cutting and removing damaged and corroded side plates of fiberizer etc. and installing new plates.6 Replacing worn out and weak troughs of rack carrier no. 1,2 and 3 and secondary can carrier.7 Replacing worn out side plates of can carrier, rack carrier, bagasse carrier and secondary can carrier.8 Making and installing new and lining the groove deflector plate of fiberizer and doing steel lining.9 Removing damaged and broken square bars of bridge and trolley of can unloader and cleaning its surface using grinder and installing new square bars by pressing and welding them. 10. Renovating and installing TRPF bottom boot. Repairing old racks16 Renovating and fitting the worn cones of round tanks fitted in the mill: (a) 1.5 ft dia to 2.5 ft dia17 (b) 2.5 ft dia to 5 ft dia18 (c) Above 5 ft dia19 Profile the cut teeth of crown pinions of mill rollers with the help of provided welding rod and hard facing.20 Cutting and removing the runner box of secondary can carrier and rack carrier and giving trial by fitting the provided angle for the runner.21 Repairing the drum and teeth of TRPF roller with MS welding electrode and later hard facing.22 Removing the worn out boot of IRC/SRC in the mill and making and fitting a new one with the help of provided plate. Repairing the broken and damaged pockets of two pieces of Anbil plate fitted on the fiberizer with the given plate and hardfacing all the pockets of the complete Anbil plate Removing leaky tubes of air heater and cutting and installing new/old tubes as per size.27 Cutting and removing gully vane/plates of ID fan and making and installing new plates and giving tiles.28 Making and installing new ash suits at the neck of boilers.29 Cutting and removing damaged ducting of ID/FD fans of boiler no. 1,2,3 and making and installing new MS plates as per instructions.30 Making and installing new suction cone of ID/FD fan and giving it to run.31 Making and installing new gully top and bottom cover of ID fan and giving it to run (complete).32 Making and installing new impeller of bagasilo fan. Removing the hollow plates in the boiling house and patching them with new MS plates (up to 6 mm plate).35 Patching with 8/10/12 mm plates in various houses.36 Leak proof repair of damper of economizer and air heater.37 38 Removing leaking tubes of semicastner, juice heater, vaporline juice heater fitted on boilers of 20, 30 ton capacity and inserting new tubes and doing hydraulic test at 100 lbs.39 Replacing leaking tubes of quad vapor cell and expanding by inserting new tubes and doing hydraulic test at 100 lbs.40 Replacing leaking tubes of pans and doing hydraulic test.41 Cutting out and removing the hollow packing rivets of juice heater and replacing them with new rivets. Replacing xyh partition plate of juice heater Removing the corroded sublimation pipe of the sulphur furnace along with the jacket, making a new one, installing it and making all the connections and giving a leak proof trial.48 Opening the cooler/scrubber of the sulphur furnace and replacing the corroded cooler pipe and re-fitting it and giving a leak proof trial.49 Removing the corroded and weak gutter at various places and making a new one and installing it.50 Cutting and removing the weak external catcher fitted in the quad and pan and installing a new one.51 Cutting and removing the weak and corroded umbrella fitted in the pan and quad. gVkuk] cukdj u;k yxkuk ,oa Vªk;y nsukA (a) For 40 ton pan52 (b) For 60 ton pan53 (c) For quad54 Cutting and removing the weak sewal around the neck of the quad/pan and making a new one and installing it as per sample/drawing and giving a leak proof trial. Cutting and removing the damaged and weak feed box of 55 panes and making a new one and installing it and making all its connections and giving it a trial. Removing the old meshes of Sugar Melter/Juice Sulphiter/Syrup Sulphiter etc. and making and installing new meshes.58 Replacing the mesh bottom plate of Syrup and Molasses tank and doing leak proof welding and providing the tile.59 Cutting and removing the weak and corroded coils at various places in the mill and making and installing new ones.60 Cutting and removing the old weak manholes and making and installing new ones, flange and cover will have to be machined and installed.61 Cutting and removing the neck portion of the hopper and making and installing a new one and providing the mesh.62 Cutting and removing the trough of the old hopper (riveting) and making and fitting a new one and giving it a successful test.63 Repairing and refitting the neck suction pipe of injection/spray pump.64 Opening the nozzles and blinds in the spray pound clusters and cleaning the pipes, nozzles etc. and doing the necessary repairs and refitting and providing the mesh. 65 Light structure work (a) Dismantling.66 FabricationRepair and installation of damaged drive of Primary Clarifier installed at ETP and successful trial.138 Installation of Lime Dosing Tank on Lime Mixer Tank and Chemical Dosing Tank on Tube Settler Tank for operationalization of Sulphate Removal Plant installed in the Mill and successful trial.139 Removal of old reduction gear ckWDl and installation of new Planetary Gear Box on Crystallizer and successful trial.140 Removal of old reduction gear boss and installation of new Planetary Gear Box on Pug Mill and successful trial.141 Dismantling/Fabrication and Erection of Steam Line 4 as per IBR standards.142 Dismantling/Fabrication and Erection of 4 Bend as per IBR standards.143 Dismantling/Fabrication and Erection of 4 Flange as per IBR standards.144 Dismantling/Fabrication and Erection of Steam Line 6 as per IBR standards.145 Dismantling/fabrication and erection of 6 bend as per IBR standards146 Dismantling/fabrication and erection of 6 flange as per IBR standards/147 Dismantling of sulphited juice heater 120 HSA148 Replacement of final molasses pipe line 4 & 5/
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 3
Uttar Pradesh View Result →
17.
Agriculture #9458012 Technical Bid
Tender For Competitive E-bidding For Fabrication And Erection Works Of Boiler Mill Or Boiling House After Dismantling For Season 2024-25, 1 Boiler House 2 Fabrication & erection of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. 3 Fabrication & Erection of the bagacillo impeller with trial. 4 Dismantling of MS plates of boiler side wall, economizer and boiler roof for replacement of boiler tubes. Dismantled old plates to be fitted with minor repair/patching after replacement of boiler tubes. 5 Replacement of worn out Beam Size- 4”/5” of Boiler No.1 & 2 Farnace and chamber. 6 Reparing of Grade Bars of the 40 Tons Boilers 7 Dismantling,fabrication and fitting of safty valve worn out discharge assembly with proper support 8 Mill House 9 Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier, MBC and RBCand Bagasse elevator. 10 Sprocket teeth repairing and strengthening with extra support of IRC/SRC/Elevator/MBC/RBC 11 Repair & hard facing of Auxiliary cane carrier Kicker /Pusher 12 Repair and hard facing on cane leveller/ chopper hubs 13 Dismantling of sprokets of SRC/IRC/Elevator drive/trail end shaft and fitting the same with successful trail 14 Fabrication & Erection of New SRC/IRC Racks as existing design 15 SS plates patching on the truff of IRC/ SRC and Mills Head Stock/ GRPF Pressure Chute/Nose Plates/etc. 16 Repairing & hardfacing of Fibrizer Hammers 17 Repairing of old SRC/IRC racks 18 Extension of Juice tray of the Each Mill upto the foundation of the underfeed roller 19 Repairing of the cabin of Cane unloader 20 Ovality of the shaft is to be made true on the both sides by welding & machining of the Cane Kicker at the Auxillary Cane Carrier 21 Boiling House 22 Dismantling Fabrication & fitting of man hole 23 Fabrication & Erection ofcomplete Square / Rectangular Tank/Round with conical Bottom 24 Welding work for various equipments in B/H 25 Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 60/80 Ton pan 26 Dismantling of 40 Ton pan complete body shell with save all and umbrella feed header, distributer, etc & fabrication of shell with 12/10mm MS plate with satisfactory trial 27 Dismantling, Fabrication & erection of sulphur furnace cooler with its pipe cooling coil complete connection of water and associated pipe lines with satisfactory trial 28 Dismantling and repairing of 2300 sq mtrs SK catcher of uttam quad set With Satisfactory trial 29 Dismantling & erectionofUttam Quad 1700 sq. mtr. calendria shell all connection with successful trail 30 Repairingof B & C massecuitemono Cryst. Leakage coil with Hydraulic testing & and successdul trial.
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 4
Uttar Pradesh View Result →
19.
Agriculture #9444890 Technical Bid
tender for Competitive E-bidding For Miscellaneous Fabrication And Erection Works Season 2024-25, 1 Boiler House 2 Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work 3 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40/30/20 ton boiler 4 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler 5 Fabrication & erection of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. 6 Replacement of worn out Bottom & side plate of Bagasse carrier/ Bagasse/Elevator/ cross carrier/ RBC/IRC by MS/SS plates 7 Replacement of worn-out ducting dampers of I.D./ FD Fan, and other ducting with levers and bushes 8 Replacement of worn-out ducting of flue gas 9 Fabrication & fitting of bagasse/ash chute for new & old boilers 10 Reparing of wet scrubber shell demister of the 20, 30 & 40 Tons Boiler 11 Fabrication & fitting of bagasse sliding gate for bagasse Carriers 12 Fabrication & Erection of the bagacillo impeller with trial. 13 Dismantling of MS plates of boiler side wall, economizer and boiler roof for replacement of boiler tubes. Dismantled old plates to be fitted with minor repair/patching after replacement of boiler tubes. 14 Replacement of runners of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC 15 Welding on teeth of new MBC /old MBC / bagasse Elevator /Cross Carrier & RBC chain sprocket to be done& teeth to be made as per profile 16 Repair of boiler FD/ID Fan casing & successful trial. 17 To replace worn out blower casing of boiler D.M.Plant 18 To replace worn out bagasse blower casing at bagasse elevator 19 Complete hardfacing of ID Fan Impeller 20 Dis., Fab. & Erection of New Boiler I.D. Expantion Joint 21 Dis. Cleaning , Repair & fitting of 20,30 & 40 Ton Boilers internal fitting, 22 Replacement of worn out Beam Size- 4”/5” of Boiler No.1 & 2 Farnace and chamber. 23 Fabrication of Bagasse Feeding Jantra of Tractor 24 Fabrication & fitting of bagasse chute at belt conveyor 25 Reparing of Grade Bars of the 40 Tons Boilers 26 Replacement of worn out teeth of bagasse feeder rotating drum of boiler no-3,4 & 5 with satisfactory trial 27 Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone.(A) 20 Ton Boiler (B) 30 Ton Boiler 28 Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone.(C) 40 Ton Boiler 29 Fabrication & fitting of chain guide of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC 30 Fitting of new 8mm thick MS plate ring on base plate of boiler ID fan impeller for strengthening 31 Dismantling,fabrication and fitting ofworn out portionof old feed tank ofBoiler No.1,2& 3 32 Replacement of worn out MS Beam and Channel arrangement Size- 4”/5” of Boiler No.1 & 2arch. 33 Dismantling,fabrication and fitting of safty valve worn out discharge assembly with proper support 34 Dismantling of worn out & leaky air heater tubes then Cutting & welding of old tubes of boiler(Which are kept in scrap yard) in order to make it ready for boiler air heater tubes. Fitting & expending of air heater tubes along with successful trial 35 Schedule Work 36 Dismantling of M.S. Pipe Line including bend/flange etc Up to 12” dia 37 Fabrication & Erection of M.S. Pipe Line Up to 12” dia 38 Fabrication & Erection of Bend up to 12” dia (MS) 39 Fabrication & Erection of Nipple up to 12” dia (MS) 40 Fabrication & Erection of Cross up to 12” dia (MS) 41 Fabrication & Erection of Tee up to 12” dia (MS) 42 Fabrication & Erection of Flange up to 12” dia (MS) 43 Fabrication & Erection of Blind up to 12” dia (MS) 44 Fabrication & Erection of Reducer up to 12” dia (MS) 45 Fabrication & Erection of Elbow up to 12” dia (MS) 46 Fabrication & Erection of Bend up to 12” dia (SS) 47 Fabrication & Erection of Nipple up to 12” dia (SS) 48 Fabrication & Erection of Cross up to 12” dia (SS) 49 Fabrication & Erection of Tee up to 12” dia (SS) 50 Fabrication & Erection of Flange up to 12” dia (SS) 51 Fabrication & Erection of Blind up to 12” dia (SS) 52 Fabrication & Erection of Reducer up to 12” dia (SS) 53 Fabrication & Erection of Elbow up to 12” dia (SS) 54 Dismantling of valve up to 12” dia 55 Fitting of valve up to 12” dia 56 Dismantling of valve above 12” dia 57 Fitting of valve above12” dia 58 Dismantling Fabrication & fitting of man hole 59 Fabrication & Erection of Bend above 12” dia 60 Fabrication & Erection of Nipple above 12” dia 61 Fabrication & Erection of Tee above 12” dia 62 Fabrication & Erection of Flange above 12” dia 63 Fabrication & Erection of Blind above 12” dia 64 Fabrication & Erection of Reducer above 12” dia 65 Fabrication & Erection of Elbow above 12” dia 66 Dismantling of M.S. Pipeabove 12 “ dia 67 Fabrication of M.S. Pipe above 12” dia 68 Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. 69 Dismantling of old worn-out Platform 70 Fabrication & erection of platform by using old plate 71 Fabrication & erection of Cat Ladder 72 Fabrication & erection stair case 73 Fabrication & erection of railing from old Material 74 Fabrication & erection of railing from old Material 75 Fabrication & erection of unvested type ring over evaporator vapour pipe/Pan vapour Pipe 76 Dismantling ofS.S. Pipe Linewith bend & flange 77 Fitting of S.S. Pipe Line with bend & flange. 78 Dismantling of MS heavy structure / Tank 79 Dismantling of MS Light structure 80 Fabrication & Erection Light structure 81 Fabrication & Erection heavy structure 82 Fabrication of Pump bed with Pump, Reduction gear & motor alignment up to 30 H.P. 83 Fabrication of pump bed with pump, reduction gear box & motor above 30 HP 84 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for quad/ J. Heater/ Vapour Cells 85 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for Pan Tube 86 SS Plate lining in different size of equipments. 87 Dismantling, cleaning & fitting of MS Pipe Line with bend, flange , nipple etc. 88 Fitting of MS pipe line with bend, flange ,nipple etc 89 Fabrication & Erection ofcomplete Square / Rectangular Tank/Round with conical Bottom 90 Fabrication & fitting ofMS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) 91 Fabrication & fitting ofSS Coil 92 Welding work for various equipments in B/H 93 Dismantling , Fabrication & fitting ofnew Coneand umbrella anywhere in the factory. Cone up to 01 Mtr. Dia 94 Dismantling, Fabrication & fitting of new Coneand umbrella any where in the factory.Cone above 01 Mtr. Dia upto 2.5mtr dia. 95 Dismantling , Fabrication & fitting of new Coneand umbrella any where in the factory, Cone above 2.5 Mtr. Dia 96 Fabrication and Patchwotk of equipmentsusing old/ NewMS plateby 6/8 mm thick plate overround vessels/any vessels 97 Mill House 98 Cutting of Cheveran Grooveson Mill Rollers 99 Cutting of pine apple grooves on Mill Rollers. 100 Replacement of Runners of cane carrier ,S.RC & IRC and cane un loader power supply angle 101 Welding of worn-out holes of Block type chain Link, Rack holding square and duere drilling of holes 102 Replacement of worn-out bootof SRC& IRC 103 Fabrication of new juice rings 104 Dismantling, Grinding & erection of the square bar of cane unloader 105 Welding on Wearout Mill and GRPF crown pinion Teeth as per profile. 106 Fabrication and replacement of new Mill Juice/ waterimbibitionsbox/distributer. 107 Fabrication. & erection. of Mill rollerfeed & discharge bearing cover from 10 mm/ 8mm plate. 108 Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier, MBC and RBCand Bagasse elevator. 109 Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. 110 Fabrication & erection of cane carrier chain side angle. 111 Fabrication & erection of return cane carrier chain supporting runner/chain guide. 112 Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. 113 Sprocket teeth repairing and strengthening with extra support of IRC/SRC/Elevator/MBC/RBC 114 Repair & hard facing of Auxiliary cane carrier Kicker /Pusher 115 Welding & Hard facing on wear out under feed roller teeth,side & Shell of roller. 116 Replacement of worn-out Juice screen Plate of screw bagasseconveyorat mill 117 Repair and hard facing on cane leveller/ chopper hubs 118 Lever bracket of underfeed roller scraper to be changed & to be fitted on as per direction. 119 Partition plate of half anvil to be changed completely with 25 mm plate & hard facing. 120 Welding and forging in holes of cane carrier chain links. 121 Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. 122 Fabrication & erection of Rotary filter MS conical juice tank. 123 Extension of SS Juice distributer pipe of rotary filter 124 Repair of cane carrier slates such as worn-out side wear plates holes& other to be done 125 Fabrication & hard facing of under feed roller scrapper as per instructions to be done. 126 Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to bedone & teeth to be made as per profile 127 MS Ring to be fitted on worn-out both side of bagasse pusher at fibrizer& hard facing to be done on Square bars fitted 128 Welding & grinding of GRPF Scrapper to be done to make them as per profile & hard facing to be done 129 Repair & hard facing of cane UnloadedGrab Finger 130 Underfeed Roller pinion hard facing/welding 131 Repairing of MS Guard/ cover mill rollers crown pinion 132 Dismantling & fabrication of bagacillo screen with Modification as per instruction. 133 Dismantling of sprokets of SRC/IRC/Elevator drive/trail nd shaft and fitting the same with successful trail 134 Rotary screen wornout support box replacement & accordingly strenthening its platform with successful trail 135 SS plates patching on the truff of IRC/ SRC and Mills Head Stock 136 Fabrication & fitting of new side-pressure plates of the GRPF and also fitting/profile building of the bottom & top new/old scrappers of the same along with patching/linner of 5mm thick ss plate as per sample 137 Pan House 138 Repairing of down-take of Pan for 40/50 Ton Pan 139 Repairing of down-take of Pan for 60/80 Ton Pan 140 Replacement of worn out/ broken angle arms of crystallizer 141 Dismantling of Gutter of Molasses Magma & massecuite. 142 Fabrication & fitting of Gutter of Molasses, Magma & massecuite. 143 Repairing of hinge type cover of Gutter 144 Replacement of worn-out condensate box of pans, quad & juice heaters 145 Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 40/50 Ton pan 146 Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 60/80 Ton pan 147 Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan 148 Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan 149 Replacement of worn out distributor by new for 40/50 Ton Pan 150 Replacement of worn out distributor by new for 60/80 Ton Pan 151 Repair of wornout/ broken Arm/ Ribbon of air cooled, vacuum & seed crystallizer 152 Dismantling of 40 Ton pan complete body shell with save all and umbrella feed header, distributer, etc & fabrication of shell with 12/10mm MS plate with satisfactory trial 153 Replacement of complete worn-out top conical portion of Pan by new withsupports of associated machinery parts proper strengthening-40/50 Ton Pan 154 Replacement of complete worn-out top conical portion of Pan by new withsupports of associated machinery parts proper strengthening-60/80 Ton Pan 155 Strengthening of 40/60 Ton Pan body &Taper Portion with channel etc. 156 Replacement of worn out bushes of air cooled crystallizer of both side & completion with proper alignment & successful trial (Bushes will be provided by the factory)- Both side (rate ratio drive : non drive end shall be 65:35) 157 Dismantling Fabrication & Erection of Box type feed header for each Pan with related all connections. 158 Dismantling Fabrication & Erection of worn out portion of pan body with 12mm plate with water & vacuum trial 159 Replacement of wearout/wornout Ms side & bottom plate of water over head tank/ syrup storage tanks at pan station 160 Repairing of wearout/wornout down take of pans 40/50 Ton 161 Repairing of wearout/wornout down take of pans 60/80 Ton 162 Repairing of wearout/wornout save-all of pans 40/50 Ton 163 Dismantling , fabrication and erection of pan save all with proper trial 40/50 Ton 164 Dismantlingand erectionof 80 Ton Pan no 2 shell and save all 165 Dismantling , fabrication and erection of pan save all with proper trial 60/80 Ton 166 Repairing of wearout/wornout save-all of pans 60/80 Ton 167 Evaporator & Clarification House 168 Dismantling, repair & refitting, cleaning work of catcher of new Semikestner (Uttam Set) 169 Dismantling, fabrication & erection work of Evaporator body/ Semikestner/vapour cell newsave all 170 Major repair of save all of the evaporator body/Semikestner /vapour cell 171 Dismantling, fabrication & erection ofnew Juice heater Header withribs& fitting of cover with satisfactory trial 172 Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with steam coil and their hydraulic testing. 173 Dismantling, Fabrication & erection of sulphur furnace cooler with its pipe cooling coil complete connection of water and associated pipe lines with satisfactory trial 174 Repairing of sulphur furnace cooler with its pipe cooling coil and complete connection of water cooling pipe and gas line. 175 Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station 176 Dismantling, fabrication & erection of condenser at vacuum filter. 177 Dismantling, fabrication & erection of Mud juice receiving tank complete with connection & associated pipe lines. 178 Dismantling, fabrication & erection of mud tray of vacuum 10’ x20’ vacuum filter 179 Dismantling, fabrication & erection of vacuum filter agitator. 180 Dismantling, fabrication & erection of the juice box of juice heater with satisfactory trial. 181 Dismantling Fabrication & fitting of bagacillo pipe. 182 Dismantling , fabrication & erection of clear juice Liquidation box with trial 183 Dismantling, fabrication & erection of clarifier mud boot. 184 Dismantling, fabrication & erection ofJuice catcher for Raw/vacuum/sugar melter /sulphitedJuice pumpswith suction/ delivery connection 185 Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. 186 RepairingofSO2 furnace sublimation pipe with its leaking Tower etc. with testing 187 Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. 188 Fabrication & erection of screw conveyor from 6mm thick plate with satisfactory trial. 189 Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. 190 Dismantling, fabrication and erection of new recovery tower of juice sulphiter/ Syrup Sulphiter. 191 Replacement of muddy juice tank fitted at vacuum filter with new plates & with all connections. 192 Repairing of Umbrella of Quad & Pan 193 Dismantling, fabrication & erection of worn out Umbrella of Quad & Pan 194 Dismantling, fabrication & erection ofsaveall ofQuad old bodies 195 Dismantling, fabrication & erection ofsaveall ofQuad Uttam set. 196 Replacement of worn-outtop conical portion ofQuad & Vapour Shell with save all proper strengthening with associated machinery 197 Dismantling, Repair, & erection of worn out Juice heater partition plate with ribs. 198 Dismantling of worn out arms and shell (outside & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. 199 Dismantlingof worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. 200 To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial 201 Dismantling ofwear outjuice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. 202 To replace worn out mud scrapper plate with support & vacuum filter fitting to be done. 203 To replace worn out juice baffle plate of door compartment 204 Fabrication & erection of new sulphur furnace after dismantling of old furnace with successful water/Air trial. 205 Major repair of lime slaker with proper alignment & trial 206 Dismantling & erectionofQuad 440 sq. mtr. calendria include all connection with successful trail 207 Dismantling, fabrication & erection of After burner vessel. For So2 furnace. 208 To replace worn out sulphur furnace header of size 8” /10” 209 Dismantling, fabrication & erection of ammonia pipe inside new Evaporator body 210 Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc. 211 Dismantling and repairing of 2300 sq mtrs SK catcher of uttam quad set With Satisfactory trial 212 Replacement of partition plate of old door Compartment with 5/6 mm MS plate 213 Replacement of cooling coil pipe of C- vertical crystalizer 930 mtr with new M.S. pipesize 3 with proper hydraulic testing and trial 214 Dismantling, fabrication & erection of 440 sq mtr quad body shell with save all, top taper cone, manhole and its all connection with satisfactory trial 215 Dismantling & erectionofUttam Quad 1700 sq. mtr. calendria shell all connection with successful trail 216 Centrifugal House 217 To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine with proper Trial. 218 To Replace worn-out “A” Centrifugal Machine Molasses Chute/housing chute followed by satisfactory trial. 219 To replace worn out half portion of horizontal sugar melter in Centrifugal house with steam & juice connection followed by satisfactory trial. 220 Dismantling of worn out B & C centrifugal m/c, Magma mixture shaft, fabrication of complete new shaft with 12mm plate, fitting of arms etc. with successful trial. 221 Replacement of damaged portion of hopper 222 Broken Shaft of Cryst. To be made correct or replaced by new one andproper alignment to be done. 223 Replacement ofwornoutbushes & Arms of Sugar Melter with satisfactoty trial 224 Replacement of cooling pipe of C & B Mono Cryst. 225 Replacement of wornout suction pipe of MF- 50X50/ 40X40 injection & spraypump 226 C- Pug mill, Magma mixer, broken shaft to be taken out andto be repaired/ to be changed new along with bush, support & arm to be fitted a satisfactory trial. 227 Repairingof B & C massecuitemono Cryst. Leakage coil with Hydraulic testing & and successdul trial. 228 B & C Magma Mixer, Pugmill worn-out broken Shell to be replaced, work to br completedwith satisfactory trial. 229 Dis. Of worn-outB & C magma mixer shaft, fab.& erection of the shaft with 12 mm M.S. Plate, fittingand successful trial. 230 Replacement ofworn- out molasses ring of 1350 KT C/F Machine. 231 Dis.,fab. & Erection of New. Fan ofE.T.P. aerator 232 Dismantling, fabrication & erection of worn out WK1350 C/F machine cover. 233 Replacement ofdamaged hopper air try with new plate 234 Replacement ofworn out magma/pug mill worn out padestal arms. 235 Replacement ofweak/wearout MS jali of hopper &fitting with frame 236 Dismantling Fabrication and erection of air diffuser for ETP from old boiler tubes 237 Replacement of worn-out bed of sugar exiter with proper strengthening 238 Replacement of damaged /worn-out arms of mono crystillizer
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 5
Uttar Pradesh View Result →
20.
Agriculture #9301786 Technical Bid
Tender For Competitive Ebidding For Job Work Of Miscellaneous Fabrication Season 2023-24-2 Dismantling Of C.I. Feeding Chute Of 20 Ton Boiler & Fitting Of Ci Mouth-Piece / Chute Complete Work 3 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 30 / 20 Ton Boiler 4 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 40 Ton Boiler 5 Fabrication & Erection Of Runner Supporting Box Below At Old Mbc / New Mbc / Cross Carrier / Bagasse Elevator. 6 Replacement Of Worn Out Bottom & Side Plate Of Bagasse Carrier / Bagasse / Elevator / Cross Carrier / Rbc / Irc By Ms / Ss Plates 7 Replacement Of Worn-Out Ducting Dampers Of I.D. / Fd Fan, And Other Ducting With Levers And Bushes 8 Outside Cleaning & Painting Of 30 / 20 Tph Boiler Chimney In Double Coat With High Tempeture Resistant Paint 9 Replacement Of Worn-Out Ducting Of Flue Gas 10 Fabrication & Fitting Of Bagasse / Ash Chute For New & Old Boilers 11 Reparing Of Wet Scrubber Shell Demister Of The 20, 30 & 40 Tons Boiler 12 Fabrication & Fitting Of Bagasse Sliding Gate For Bagasse Carriers 13 Fabrication & Erection Of The Bagacillo Impeller With Trial. 14 Dismantling Of Ms Plates Of Boiler Side Wall, Economizer And Boiler Roof For Replacement Of Boiler Tubes. Dismantled Old Plates To Be Fitted With Minor Repair / Patching After Replacement Of Boiler Tubes. 15 Replacement Of Runners Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 16 Welding On Teeth Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc Chain Sprocket To Be Done& Teeth To Be Made As Per Profile 17 Repair Of Boiler Id Fan Casing & Successful Trial. 18 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 19 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 20 Complete Hardfacing Of Id Fan Impeller 21 Dis., Fab. & Erection Of New Boiler I.D. Expantion Joint 22 Dis. Cleaning , Repair & Fitting Of 20, 30 & 40 Ton Boilers Internal Fitting, 23 Replacement Of Worn Out Beam Size- 4” / 5” Of Boiler No.1 & 2 Farnace And Chamber. 24 Fabrication Of Bagasse Feeding Jantra Of Tractor 25 Fabrication & Fitting Of Bagasse Chute At Belt Conveyor 26 Reparing Of Grade Bars Of The 40 Tons Boilers 27 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 28 Replacement Of Worn Out Teeth Of Bagasse Feeder Rotating Drum Of Boiler No-3, 4 & 5 With Satisfactory Trial 29 Dismantling, Fabrication & Erection Of Id. Fan Blade With Back Plate, Ribs And Suction Cone. ( A ) 20 Ton Boiler ( B ) 30 Ton Boiler 30 Dismantling, Fabrication & Erection Of Id. Fan Blade With Back Plate, Ribs And Suction Cone. ( C ) 40 Ton Boiler 31 Fabrication & Fitting Of Chain Guide Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 32 Fitting Of New 8Mm Thick Ms Plate Ring On Base Plate Of Boiler Id Fan Impeller For Strengthening 33 Dismantling, Fabrication And Fitting Ofworn Out Portionof Old Feed Tank Ofboiler No.1, 2& 3 34 Replacement Of Worn Out Ms Beam And Channel Arrangement Size- 4” / 5” Of Boiler No.1 & 2Arch. 35 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 36 Dismantling, Fabrication And Fitting Of Safty Valve Worn Out Discharge Assembly With Proper Support 37 Schedule Work 38 Dismantling Of M.S. Pipe Line Including Bend / Flange Etc Up To 12” Dia 39 Fabrication & Erection Of M.S. Pipe Line Up To 12” Dia 40 Fabrication & Erection Of Bend Up To 12” Dia ( Ms ) 41 Fabrication & Erection Of Nipple Up To 12” Dia ( Ms ) 42 Fabrication & Erection Of Cross Up To 12” Dia ( Ms ) 43 Fabrication & Erection Of Tee Up To 12” Dia ( Ms ) 44 Fabrication & Erection Of Flange Up To 12” Dia ( Ms ) 45 Fabrication & Erection Of Blind Up To 12” Dia ( Ms ) 46 Fabrication & Erection Of Reducer Up To 12” Dia ( Ms ) 47 Fabrication & Erection Of Elbow Up To 12” Dia ( Ms ) 48 Fabrication & Erection Of Bend Up To 12” Dia ( Ss ) 49 Fabrication & Erection Of Nipple Up To 12” Dia ( Ss ) 50 Fabrication & Erection Of Cross Up To 12” Dia ( Ss ) 51 Fabrication & Erection Of Tee Up To 12” Dia ( Ss ) 52 Fabrication & Erection Of Flange Up To 12” Dia ( Ss ) 53 Fabrication & Erection Of Blind Up To 12” Dia ( Ss ) 54 Fabrication & Erection Of Reducer Up To 12” Dia ( Ss ) 55 Fabrication & Erection Of Elbow Up To 12” Dia ( Ss ) 56 Dismantling Of Valve Up To 12” Dia 57 Fitting Of Valve Up To 12” Dia 58 Dismantling Of Valve Above 12” Dia 59 Fitting Of Valve Above12” Dia 60 Dismantling Fabrication & Fitting Of Man Hole 61 Fabrication & Erection Of Bend Above 12” Dia 62 Fabrication & Erection Of Nipple Above 12” Dia 63 Fabrication & Erection Of Tee Above 12” Dia 64 Fabrication & Erection Of Flange Above 12” Dia 65 Fabrication & Erection Of Blind Above 12” Dia 66 Fabrication & Erection Of Reducer Above 12” Dia 67 Fabrication & Erection Of Elbow Above 12” Dia 68 Dismantling Of M.S. Pipeabove 12 “ Dia 69 Fabrication Of M.S. Pipe Above 12” Dia 70 Erection Of M.S. Pipe Above 12” Dia Including Bend Flange & Nipple Etc. 71 Dismantling Of Old Worn-Out Platform 72 Fabrication & Erection Of Platform By Using Old Plate 73 Fabrication & Erection Of Cat Ladder 74 Fabrication & Erection Stair Case 75 Fabrication & Erection Of Railing From Old Material 76 Fabrication & Erection Of Railing From Old Material 77 Fabrication & Erection Of Unvested Type Ring Over Evaporator Vapour Pipe / Pan Vapour Pipe 78 Dismantling Ofs.S. Pipe Linewith Bend & Flange 79 Fitting Of S.S. Pipe Line With Bend & Flange. 80 Dismantling Of Ms Heavy Structure / Tank 81 Dismantling Of Ms Light Structure 82 Fabrication & Erection Light Structure 83 Fabrication & Erection Heavy Structure 84 Fabrication Of Pump Bed With Pump, Reduction Gear & Motor Alignment Up To 30 H.P. 85 Fabrication Of Pump Bed With Pump, Reduction Gear Box & Motor Above 30 Hp 86 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Quad / J. Heater / Vapour Cells 87 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Pan Tube 88 Ss Plate Lining In Different Size Of Equipments. 89 Dismantling, Cleaning & Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc. 90 Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc 91 Fabrication & Erection Ofcomplete Square / Rectangular Tank / Round With Conical Bottom 92 Fabrication & Fitting Ofms Coil ( Coils Are To Be Duly Bend And Not Offset Pipe Welding .Offset Welds Shall Not Be Treated As Coils But As Pipes ) 93 Fabrication & Fitting Ofss Coil 94 Welding Work For Various Equipments In B / H 95 Dismantling , Fabrication & Fitting Ofnew Coneand Umbrella Anywhere In The Factory. Cone Up To 01 Mtr. Dia 96 Dismantling, Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory.Cone Above 01 Mtr. Dia Upto 2.5Mtr Dia. 97 Dismantling , Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory, Cone Above 2.5 Mtr. Dia 98 Fabrication And Patchwotk Of Equipmentsusing Old / Newms Plateby 6 / 8 Mm Thick Plate Overround Vessels / Any Vessels 99 Mill House 100 Cutting Of Cheveran Grooveson Mill Rollers 101 Cutting Of Pine Apple Grooves On Mill Rollers. 102 Replacement Of Runners Of Cane Carrier , S.Rc & Irc Mbc And Rbcand Cane Un Loader Power Supply Angle 103 Welding Of Worn-Out Holes Of Block Type Chain Link, Rack Holding Square And Duere Drilling Of Holes 104 Replacement Of Worn-Out Bootof Src& Irc 105 Fabrication Of New Juice Rings 106 Dismantling, Grinding & Erection Of The Square Bar Of Cane Unloader 107 Welding On Wearout Mill And Grpf Crown Pinion Teeth As Per Profile. 108 Fabrication And Replacement Of New Mill Juice / Waterimbibitionsbox / Distributer. 109 Fabrication. & Erection. Of Mill Rollerfeed & Discharge Bearing Cover From 10 Mm / 8Mm Plate. 110 Fabrication & Erection Of Runner Supporting Box Below Runner At Irc, Src & Cane Carrier, Mbc And Rbcand Bagasse Elevator. 111 Replacement Of Worn Out Deflector Plate And Top Plate Of Cane Chopper / Cane Leveler / Fibrizer By M.S. Plate / Ss Lining Plates Along With Strengthening. 112 Fabrication & Erection Of Cane Carrier Chain Side Angle. 113 Fabrication & Erection Of Return Cane Carrier Chain Supporting Runner / Chain Guide. 114 Fabrication & Erection Of Worn Out Ms Plate Of Truck Tripler, Src, Irc & Cane Carrier Side Plate. 115 Sprocket Teeth Repairing And Strengthening With Extra Support Of Irc / Src / Elevator / Mbc / Rbc 116 Repair & Hard Facing Of Auxiliary Cane Carrier Kicker / Pusher 117 Welding & Hard Facing On Wear Out Under Feed Roller Teeth, Side & Shell Of Roller. 118 Replacement Of Worn-Out Juice Screen Plate Of Screw Bagasseconveyorat Mill 119 Repair And Hard Facing On Cane Leveller / Chopper Hubs 120 Lever Bracket Of Underfeed Roller Scraper To Be Changed & To Be Fitted On As Per Direction. 121 Partition Plate Of Half Anvil To Be Changed Completely With 25 Mm Plate & Hard Facing. 122 Welding And Forging In Holes Of Cane Carrier Chain Links. 123 Fabrication Of 10” Size Non Return Valve From M.S. Plate With Fitting & Leak Proof Trial. 124 Fabrication & Erection Of Rotary Filter Ms Conical Juice Tank. 125 Extension Of Ss Juice Distributer Pipe Of Rotary Filter 126 Repair Of Cane Carrier Slates Such As Worn-Out Side Wear Plates Holes& Other To Be Done 127 Fabrication & Hard Facing Of Under Feed Roller Scrapper As Per Instructions To Be Done. 128 Welding On Wear Out Teeth Of Cane Carrier, S.R.C. & I.R.C. Sprockets To Bedone & Teeth To Be Made As Per Profile 129 Ms Ring To Be Fitted On Worn-Out Both Side Of Bagasse Pusher At Fibrizer& Hard Facing To Be Done On Square Bars Fitted 130 Welding & Grinding Of Grpf Scrapper To Be Done To Make Them As Per Profile & Hard Facing To Be Done 131 Repair & Hard Facing Of Cane Unloadedgrab Finger 132 Underfeed Roller Pinion Hard Facing / Welding 133 Repairing Of Ms Guard / Cover Mill Rollers Crown Pinion 134 Dismantling & Fabrication Of Bagacillo Screen With Modification As Per Instruction. 135 Dismantling Of Sprokets Of Src / Irc / Elevator Drive / Trail Nd Shaft And Fitting The Same With Successful Trail 136 Rotary Screen Wornout Support Box Replacement & Accordingly Strenthening Its Platform With Successful Trail 137 Ss Plates Patching On The Truff Of Irc / Src And Mills Head Stock 138 Pan House 139 Repairing Of Down-Take Of Pan For 40 / 50 Ton Pan 140 Repairing Of Down-Take Of Pan For 60 / 80 Ton Pan 141 Replacement Of Worn Out / Broken Angle Arms Of Crystallizer 142 Dismantling Of Gutter Of Molasses Magma & Massecuite. 143 Fabrication & Fitting Of Gutter Of Molasses, Magma & Massecuite. 144 Repairing Of Hinge Type Cover Of Gutter 145 Replacement Of Worn-Out Condensate Box Of Pans, Quad & Juice Heaters 146 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 40 / 50 Ton Pan 147 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 60 / 80 Ton Pan 148 Repairing Of Umbrella Of Pans With Supports & J Pipes 40 / 50 Ton Pan 149 Repairing Of Umbrella Of Pans With Supports & J Pipes 60 / 80 Ton Pan 150 Replacement Of Worn Out Distributor By New For 40 / 50 Ton Pan 151 Replacement Of Worn Out Distributor By New For 60 / 80 Ton Pan 152 Repair Of Wornout / Broken Of Air Cooled, Vacuum & Seed Crystallizer 153 Dismantling Of 40 Ton Pan Complete Body Shell With Save All And Umbrella Feed Header, Distributer, Etc & Fabrication Of Shell With 12 / 10Mm Ms Plate With Satisfactory Trial 154 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-40 / 50 Ton Pan 155 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-60 / 80 Ton Pan 156 Strengthening Of 40 / 60 Ton Pan Body &Taper Portion With Channel Etc. 157 Replacement Of Worn Out Bushes Of Air Cooled Crystallizer Of Both Side & Completion With Proper Alignment & Successful Trial ( Bushes Will Be Provided By The Factory ) - Both Side ( Rate Ratio Drive : Non Drive End Shall Be 65:35 ) 158 Dismantling Fabrication & Erection Of Box Type Feed Header For Each Pan With Related All Connections. 159 Dismantling Fabrication & Erection Of Worn Out Portion Of Pan Body With 12Mm Plate With Water & Vacuum Trial 160 Replacement Of Wearout / Wornout Ms Side & Bottom Plate Of Water Over Head Tank / Syrup Storage Tanks At Pan Station 161 Repairing Of Wearout / Wornout Down Take Of Pans 40 / 50 Ton 162 Repairing Of Wearout / Wornout Down Take Of Pans 60 / 80 Ton 163 Repairing Of Wearout / Wornout Save-All Of Pans 40 / 50 Ton 164 Dismantling , Fabrication And Erection Of Pan Save All With Proper Trial 40 / 50 Ton 165 Dismantling , Fabrication And Erection Of 40 Ton Pan No 5 Calendria With Proper Trial 166 Dismantling , Fabrication And Erectionof 80 Ton Pan No 10 Taper Portion And Save All 167 Dismantlingand Erectionof 80 Ton Pan No 1 Shell And Save All 168 Dismantling , Fabrication And Erection Of Pan Save All With Proper Trial 60 / 80 Ton 169 Repairing Of Wearout / Wornout Save-All Of Pans 60 / 80 Ton 170 Evaporator & Clarification House 171 Dismantling, Repair & Refitting, Cleaning Work Of Catcher Of New Semikestner ( Uttam Set ) 172 Dismantling, Fabrication & Erection Work Of Evaporator Body / Semikestner / Vapour Cell Newsave All 173 Major Repair Of Save All Of The Evaporator Body / Semikestner / Vapour Cell 174 Dismantling, Fabrication & Erection Ofnew Juice Heater Header Withribs& Fitting Of Cover With Satisfactory Trial 175 Dismantling, Fabrication & Erection Work Of The Sulphur Furnace Melter / Melt Receiver Along With Steam Coil And Their Hydraulic Testing. 176 Dismantling, Fabrication & Erection Of Sulphur Furnace Cooler With Its Pipe Cooling Coil Complete Connection Of Water And Associated Pipe Lines With Satisfactory Trial 177 Repairing Of Sulphur Furnace Cooler With Its Pipe Cooling Coil And Complete Connection Of Water Cooling Pipe And Gas Line. 178 Dismantling, Fabrication & Erection Of Juice Receiving Bottle Fitted At Vacuum Filter Station 179 Dismantling, Fabrication & Erection Of Condenser At Vacuum Filter. 180 Dismantling, Fabrication & Erection Of Mud Juice Receiving Tank Complete With Connection & Associated Pipe Lines. 181 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 8’ X16’ Vacuum Filter 182 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 10’ X20’ Vacuum Filter 183 Dismantling, Fabrication & Erection Of Vacuum Filter Agitator. 184 Dismantling, Fabrication & Erection Of The Juice Box Of Juice Heater With Satisfactory Trial. 185 Dismantling Fabrication & Fitting Of Bagacillo Pipe. 186 Dismantling , Fabrication & Erection Of Clear Juice Liquidation Box With Trial 187 Dismantling, Fabrication & Erection Of Clarifier Mud Boot. 188 Dismantling, Fabrication & Erection Ofjuice Catcher For Raw / Vacuum / Sugar Melter / Sulphitedjuice Pumpswith Suction / Delivery Connection 189 Repairing Of Juice Heater Condensate Bottle / Evaporator / Syrup Receiving Bottle With Leak Proof Testing Partition Plate With All Connection. 190 Repairingofso2 Furnace Sublimation Pipe With Its Leaking Tower Etc. With Testing 191 Dismantling, Fabrication & Erection Of Vacuum Filter Mud Mixer Body & Fitting Of Screw Conveyor With Proper Alignment & Satisfactory Trial. 192 Fabrication & Erection Of Screw Conveyor From 6Mm Thick Plate With Satisfactory Trial. 193 Dismantling, Fabrication & Fitting Of New Down Take Of Quad / Old Or New Semikestner, Etc. 194 Dismantling, Fabrication And Erection Of New Recovery Tower Of Juice Sulphiter / Syrup Sulphiter. 195 Replacement Of Muddy Juice Tank Fitted At Vacuum Filter With New Plates & With All Connections. 196 Repairing Of Umbrella Of Quad & Pan 197 Dismantling, Fabrication & Erection Of Worn Out Umbrella Of Quad & Pan 198 Dismantling, Fabrication & Erection Ofsaveall Ofquad Old Bodies 199 Dismantling, Fabrication & Erection Ofsaveall Ofquad Uttam Set. 200 Replacement Of Worn-Outtop Conical Portion Ofquad & Vapour Shell With Save All Proper Strengthening With Associated Machinery 201 Dismantling, Repair, & Erection Of Worn Out Juice Heater Partition Plate With Ribs. 202 Dismantling Of Worn Out Arms And Shell ( Outside & Inside ) Of Juice Sulphiter Drum, Fabrication & Erection With Satisfactory Trial. 203 Dismantlingof Worn Out Central Drum & Bed Of Juice Sulphiter, Fabrication & Erection With Satisfactory Trial. 204 To Replace Worn Out Clear Juice Box / Mud Discharge Box With Valve Of New Door Followed By Satisfactory Trial 205 Dismantling Ofwear Outjuice Heater Cover, Fitting Of New 12 Mm Thick Ms Plate By Welding & Bolting Including Repair Of Lever & Erection Of Cover Followed By Satisfactory Water Trial. 206 To Replace Worn Out Mud Scrapper Plate With Support & Vacuum Filter Fitting To Be Done. 207 To Replace Worn Out Juice Baffle Plate Of Door Compartment 208 Fabrication & Erection Of New Sulphur Furnace After Dismantling Of Old Furnace With Successful Water / Air Trial. 209 Major Repair Of Lime Slaker With Proper Alignment & Trial 210 Dismantling & Erectionofquad 440 Sq. Mtr. Calendria Include All Connection With Successful Trail 211 Dismantling, Fabrication & Erection Of After Burner Vessel. For So2 Furnace. 212 To Replace Worn Out Sulphur Furnace Header Of Size 8” / 10” 213 Dismantling, Fabrication & Erection Of Ammonia Pipe Inside New Evaporator Body 214 Replacement Of Worn-Out Stirrer Arms Of Clarifier Completed With All Support And Squeezers Etc. 215 Dismantling And Repairing Of 2300 Sq Mtrs Sk Catcher Of Uttam Quad Set With Satisfactory Trial 216 Dismantling & Erection Work Of Uttan Quad Set 2300 Sq. Mtr Calendria Include All Connection With Successful Trial 217 Replacement Of Partition Plate Of Old Door Compartment With 5 / 6 Mm Ms Plate 218 Replacement Of Cooling Coil Pipe Of C- Vertical Crystalizer 930 Mtr With New M.S. Pipesize 3 With Proper Hydraulic Testing And Trial 219 Dismantling, Fabrication & Erection Of 440 Sq Mtr Quad Body Shell With Save All, Top Taper Cone, Manhole And Its All Connection With Satisfactory Trial 220 Dismantling & Erectionofuttam Quad 1700 Sq. Mtr. Calendria Shell All Connection With Successful Trail 221 Erection Work Of Transfer Pump Bottle Size 3Mtrx1.5Mtr Connection. 222 Centrifugal House 223 To Replace Worn-Out Molasses Jacket Of B & C Continuous Centrifugal Machine With Proper Trial. 224 To Replace Worn-Out “A” Centrifugal Machine Molasses Chute / Housing Chute Followed By Satisfactory Trial. 225 To Replace Worn Out Half Portion Of Horizontal Sugar Melter In Centrifugal House With Steam & Juice Connection Followed By Satisfactory Trial. 226 Dismantling Of Worn Out B & C Centrifugal M / C, Magma Mixture Shaft, Fabrication Of Complete New Shaft With 12Mm Plate, Fitting Of Arms Etc. With Successful Trial. 227 Replacement Of Damaged Portion Of Hopper 228 Broken Shaft Of Cryst. To Be Made Correct Or Replaced By New One Andproper Alignment To Be Done. 229 Replacement Ofwornoutbushes & Arms Of Sugar Melter With Satisfactoty Trial 230 Replacement Of Cooling Pipe Of C & B Mono Cryst. 231 Replacement Of Wornout Suction Pipe Of Mf- 50X50 / 40X40 Injection & Spraypump 232 C- Pug Mill, Magma Mixer, Broken Shaft To Be Taken Out Andto Be Repaired / To Be Changed New Along With Bush, Support & Arm To Be Fitted A Satisfactory Trial. 233 Repairingof B & C Massecuitemono Cryst. Leakage Coil With Hydraulic Testing & And Successdul Trial. 234 B & C Magma Mixer, Pugmill Worn-Out Broken Shell To Be Replaced, Work To Br Completedwith Satisfactory Trial. 235 Dis. Of Worn-Outb & C Magma Mixer Shaft, Fab.& Erection Of The Shaft With 12 Mm M.S. Plate, Fittingand Successful Trial. 236 Replacement Ofworn- Out Molasses Ring Of 1350 Kt C / F Machine. 237 Dis., Fab. & Erection Of New. Fan Ofe.T.P. Aerator 238 Dismantling, Fabrication & Erection Of Worn Out Wk1350 C / F Machine Cover. 239 Replacement Ofdamaged Hopper Air Try With New Plate 240 Replacement Ofworn Out Magma / Pug Mill Worn Out Padestal Arms. 241 Replacement Ofweak / Wearout Ms Jali Of Hopper &Fitting With Frame 242 Dismantling Fabrication And Erection Of Air Diffuser For Etp From Old Boiler Tubes 243 Replacement Of Worn-Out Bed Of Sugar Exiter With Proper Strengthening 244 Replacement Of Damaged / Worn-Out Arms Of Mono Crystillizer
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 8
Uttar Pradesh View Result →
21.
Public Administrative Department #9213981 Technical Bid
supply of Welding Elecrode , Welding Electrodes , Welding Electrodes Caci 540, Diffusion Make, Size 3.15 Mm. , Welding Electrodes Caci 540, Diffusion Make, Size 4.00 Mm. , Welding Electrodes Super Bronze Size 3.15 Mm. , Welding Electrodes Super Bronze Size 4.00 Mm. , Super Gauge Welding Electrodes Size 4.00 Mm , Welding Electrodes Essen- 80 (Unoweld), Brizil Make Size 4.00 Mm , Welding Electrodes Essen Ccr- 62/1 Size 3.15 Mm , Welding Electrodes Essen Ccr- 62/1 Size 4.00 Mm. , Welding Electrodes Essen - 100Size 3.15 Mm , Welding Electrodes Essen - 100 Size 4.00 Mm , Welding Electrode Nicr 8Gs Size 3.15 Mm , Welding Electrode Nicr 8Gs Size 4.00 Mm , Terroweld Dlh Size 4 .00 Mm (Essab Make) , Terroweld Dlh Size 3.2 Mm (Essab Make) , Terroweld Ds3 Size 4.00 Mm (Essab Make) , Terroweld Ds3 Size 3.2 Mm (Essab Make) , Terroweld Ds4 Size 4.00 Mm (Essab Make) , Terroweld Ds4 Size 3.15 Mm (Essab Make) , O.K. Selectrode 21.03 Size 4.00 Mm (Essab Make) , O.K. Selectrode 83.40 Size 4.00 Mm (Essab Make) , O.K. Selectrode 83.40 Size 3.15 Mm (Essab Make) , O.K C.I.Size 4.00 Mm (Essab Make) , O.K C.I.Size 3.15 Mm (Essab Make) , Welding Electrodes 160 (680)Size 1.6 Mm. , Welding Electrodes 160 (680) Size 2.5 Mm , Welding Electrodes 160 (680)Size 3.15 Mm , Welding Electrodes 160 (680) Size 4.00 Mm. , For Brass Bronze Welding Electrodesexd 5600 (Xhd2800) Size 4.00 Mm. , For Brass Bronze Welding Electrodesexd 5600 (Xhd2800) Size 3.15 Mm , For Brass Bronze Electrode Wunder Bronzo158size 3.15 Mm , For Brass Bronze Electrode Wunder Bronzo158size 4.00 Mm , Welding Electrodesewacslide 12 (6006) Size 2.50 Mm. , Welding Electrodesewacslide 12 (6006) Size 3.15 Mm. , Welding Electrodesewacslide 12 (6006) Size 4.00 Mm. , Welding Electrodes120 (660 Nh)Size 3.15 Mm , Welding Electrodes120 (660 Nh)Size 4.00 Mm , Welding Electrodesunitro M – (Amol)Size 3.15 Mm , Welding Electrodesunitro M – (Amol)Size 4.00 Mm , Ewac (L & T) Make Brazing Rod Ewacstik E 10 (1805) Size 3.15 Mm. , Ewac (L & T) Make Eutector Flux 1805 For Above. , Pinion Teeth Hardfacing Bu 4 (2B). , Wunder – 80 (2240)Size 3.15 Mm. , Wunder – 80 (2240)Size 4.00 Mm. , S.S. To M.S. Spectra 80 Lsize 3.15 Mm. , S.S. To M.S. Spectra 80 Lsize 4.00 Mm. , Cpsm- 022 , For Ci Machienablespectra Ci 01 Size3.15 Mm , For Ci Machienablespectra Ci 01 Size4.00 Mm , Tubular Electrode For Hard Facing Id Fan And Pump Impeller Ewac Te-81 Size 4.00 Mm , Tubular Electrode For Hard Facing Id Fan And Pump Impeller Ewac Te-81Size 6.00 Mm , Cpem – 021 Size3.15 Mm , Cpem – 021 Size4.00 Mm , General Purpose Welding Electrodes B & H (Supreme ) Make (Qty. In Pkts) Size- 3.15 Mm X 350 Mm , General Purpose Welding Electrodes B & H (Supreme ) Make (Qty In Pkts). Size-4.00 Mm X 450 Mm
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 7
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 9
23.
Rural Development #9153800 Technical Bid
Supply Of Welder Trade Raw Materials At Scdd Iti Bela, Nadathara, Elathur At Kasargod, Thrissur, Kozhikode District Respectively. , Supply Of Welder Trade Raw Materials , Ms Flat 50X 10Mm , Ms Flat 50X 12Mm , Ms Pipedia 50X 3Mm , Ms Pipedia 50X 6Mm , Ms Pipedia 60X 3Mm , Cutting Wheel 14 Inch Dia , Cutting Wheel 4 Inch Dia , Grinding Wheel 4 Inch Dia , Dia 25Mm Ms Rod , Welding Electrodedia 2.6Mm , Welding Electrodedia3.2Mm , Aluminium Sheet 2 Mmthick , Aluminium Pipe Dia 50X 3Mm , Stainless Steelsheet 2 Mmthick , Stainless Steelsheet 1.6 Mm Thick , Brass Sheet 3 Mm Thick , Cast Iron Plate 6Mm Thick , Copper Sheet 2 Mm Thick , Copper Tube 25 Mm Dia , Copper -Silver Filler Rod 1.6 Mm , Silicon Bronze Filler Rod 1.6 Mm , Hardfacing Electrode , Tungeston Electrode2.4 Mm Green , Tungeston Electrode2.4 Mm Red , Collet 2.4 Mm For Tig Welding Torch , Cemaric Cup For Plasma Cutting , Cemaric Nozzle No 5 For Tig Welding Torch , Cemaric Nozzle No 6 For Tig Welding Torch , Grease , 20W40 Grade Oil , Teflon Tape , Mild Steel Sheet 2 Mmthick , Mild Steel Sheet 3 Mmthick , C C M S Filler Rod 1.6 Mm , Stainless Steel Filler Rod 2 Mm , Silicon Aluminium Filler Rod 1.6 Mm , Weldingelectrode 2.5 Mm 7018 , Weldingelectrode 2.5 Mm S S , Weldingelectrode 2.5 Mm 6013 , Pickling Gel , Hydrocholoric Acid , Sulphuric Acid , Borax Flux For Gas Welding , Ptfe Tape , Hack Saw Blade , Mig Welding Wire Stainless Steel 1Mm , Nozzle For Mig / Mag , Anti Spatter Spray
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 1
24.
Agriculture #9145629 Technical Bid
Compititive Ebidding For Miscellaneous Fabrication Jobs And Erection Work In Different Items For Season 2022-23- 1 Boiler House 2 Dismantling Of C.I. Feeding Chute Of 20 Ton Boiler & Fitting Of Ci Mouth-Piece / Chute Complete Work 3 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 30 / 20 Ton Boiler 4 Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 40 Ton Boiler 5 Fabrication & Erection Of Runner Supporting Box Below At Old Mbc / New Mbc / Cross Carrier / Bagasse Elevator. 6 Replacement Of Worn Out Bottom & Side Plate Of Bagasse Carrier / Bagasse / Elevator / Cross Carrier / Rbc / Irc By Ms / Ss Plates 7 Replacement Of Worn-Out Ducting Dampers Of I.D. / Fd Fan, And Other Ducting With Levers And Bushes 8 Inside & Outside Cleaning & Painting Of Boiler Chimney In Double Coat. 9 Replacement Of Worn-Out Ducting Of Flue Gas 10 Fabrication & Fitting Of Bagasse / Ash Chute For New & Old Boilers 11 Reparing Of Wet Scrubber Shell Demister Of The 20, 30 & 40 Tons Boiler 12 Repairing Of Rack Of Boiler Chain. For New Boiler 13 Repairing Of Rack Of Boiler Chain. For Old Boiler 14 Fabrication & Fitting Of Bagasse Sliding Gate For Bagasse Carriers 15 Fabrication & Erection Of The Bagacillo Impeller With Trial. 16 Dismantling Cleaning, Painting & Hydraulic Testing & Fitting Of Economizer Coil Of 20 Ton Boiler. 17 Dismantling Of Ms Plates Of Boiler Side Wall, Economizer And Boiler Roof For Replacement Of Boiler Tubes. Dismantled Old Plates To Be Fitted With Minor Repair / Patching After Replacement Of Boiler Tubes. 18 Complete Dismantling, Fabrication And Erection Of Boiler Ms Chimney With Associated Ladder Sampling Platform Etc As Per Existing Or As Instructed By Chief Engineer 19 Replacement Of Runners Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 20 Welding On Teeth Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc Chain Sprocket To Be Done& Teeth To Be Made As Per Profile 21 Repairing Of Clarifier With Drive Arms Of 40 Ton Boiler Wet Scrubber. 22 Repair Of Boiler Id Fan Casing & Successful Trial. 23 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 24 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 25 Complete Hardfacing Of Id Fan Impeller 26 Dis., Fab. & Erection Of New Boiler I.D. Expantion Joint 27 Dis. Cleaning , Repair & Fitting Of 20, 30 & 40 Ton Boilers Internal Fitting, 28 Replacement Of Worn Out Beam Size- 4” / 5” Of Boiler No.1 & 2 Farnace And Chamber. 29 Fabrication Of Bagasse Feeding Jantra Of Tractor 30 Fabrication & Fitting Of Bagasse Chute At Belt Conveyor 31 Dismantling, Fabrication And Fitting Ofworn Out Portionof Boiler No.4 & 5 Fly Ash Arrester Shell 32 Fabrication Of New Racks For Boiler Chain. ( A ) New Boiler ( B ) Old Boiler 33 Reparing Of Grade Bars Of The 40 Tons Boilers 34 To Replace Worn Out Bagasse Blower Casing At Bagasse Elevator 35 Replacement Of Worn Out Teeth Of Bagasse Feeder Rotating Drum Of Boiler No-3, 4 & 5 With Satisfactory Trial 36 Modification / Upliftment Of The Bagasse Belt Coveyor No.2 As Instructed By Chief Engineer 37 Dismantling, Fabrication & Erection Of Id. Fan Blade With Back Plate, Ribs And Suction Cone. ( A ) 20 Ton Boiler ( B ) 30 Ton Boiler ( C ) 40 Ton Boiler 38 Patching & Strengthening Of M.S. Chimneyshell Of 30 Ton Boiler 39 Fabrication & Fitting Of Chain Guide Of New Mbc / Old Mbc / Bagasse Elevator / Cross Carrier & Rbc 40 Fitting Of New 8Mm Thick Ms Plate Ring On Base Plate Of Boiler Id Fan Impeller For Strengthening 41 Dismantling, Fabrication And Fitting Ofworn Out Portionof Old Feed Tank Ofboiler No.1, 2& 3 42 Replacement Of Worn Out Ms Beam And Channel Arrangement Size- 4” / 5” Of Boiler No.1 & 2Arch. 43 To Replace Worn Out Blower Casing Of Boiler D.M.Plant 44 Dismantling, Fabrication And Fitting Of Safty Valve Worn Out Discharge Assembly With Proper Support 45 Schedule Work 46 Dismantling Of M.S. Pipe Line Including Bend / Flange Etc Up To 12” Dia 47 Fabrication & Erection Of M.S. Pipe Line Up To 12” Dia 48 Fabrication & Erection Of Bend Up To 12” Dia ( Ms ) 49 Fabrication & Erection Of Nipple Up To 12” Dia ( Ms ) 50 Fabrication & Erection Of Cross Up To 12” Dia ( Ms ) 51 Fabrication & Erection Of Tee Up To 12” Dia ( Ms ) 52 Fabrication & Erection Of Flange Up To 12” Dia ( Ms ) 53 Fabrication & Erection Of Blind Up To 12” Dia ( Ms ) 54 Fabrication & Erection Of Reducer Up To 12” Dia ( Ms ) 55 Fabrication & Erection Of Elbow Up To 12” Dia ( Ms ) 56 Fabrication & Erection Of Bend Up To 12” Dia ( Ss ) 57 Fabrication & Erection Of Nipple Up To 12” Dia ( Ss ) 58 Fabrication & Erection Of Cross Up To 12” Dia ( Ss ) 59 Fabrication & Erection Of Tee Up To 12” Dia ( Ss ) 60 Fabrication & Erection Of Flange Up To 12” Dia ( Ss ) 61 Fabrication & Erection Of Blind Up To 12” Dia ( Ss ) 62 Fabrication & Erection Of Reducer Up To 12” Dia ( Ss ) 63 Fabrication & Erection Of Elbow Up To 12” Dia ( Ss ) 64 Dismantling Of Valve Up To 12” Dia 65 Fitting Of Valve Up To 12” Dia 66 Dismantling Of Valve Above 12” Dia 67 Fitting Of Valve Above12” Dia 68 Dismantling Fabrication & Fitting Of Man Hole 69 Fabrication & Erection Of Bend Above 12” Dia 70 Fabrication & Erection Of Nipple Above 12” Dia 71 Fabrication & Erection Of Tee Above 12” Dia 72 Fabrication & Erection Of Flange Above 12” Dia 73 Fabrication & Erection Of Blind Above 12” Dia 74 Fabrication & Erection Of Reducer Above 12” Dia 75 Fabrication & Erection Of Elbow Above 12” Dia 76 Dismantling Of M.S. Pipeabove 12 “ Dia 77 Fabrication Of M.S. Pipe Above 12” Dia 78 Erection Of M.S. Pipe Above 12” Dia Including Bend Flange & Nipple Etc. 79 Dismantling Of Old Worn-Out Platform 80 Fabrication & Erection Of Platform By Using Old Plate 81 Fabrication & Erection Of Cat Ladder 82 Fabrication & Erection Stair Case 83 Fabrication & Erection Of Railing From Old Material 84 Fabrication & Erection Of Railing From Old Material 85 Fabrication & Erection Of Unvested Type Ring Over Evaporator Vapour Pipe / Pan Vapour Pipe 86 Dismantling Ofs.S. Pipe Linewith Bend & Flange 87 Fitting Of S.S. Pipe Line With Bend & Flange. 88 Dismantling Of Ms Heavy Structure / Tank 89 Dismantling Of Ms Light Structure 90 Fabrication & Erection Light Structure 91 Fabrication & Erection Heavy Structure 92 Fabrication Of Pump Bed With Pump, Reduction Gear & Motor Alignment Up To 30 H.P. 93 Fabrication Of Pump Bed With Pump, Reduction Gear Box & Motor Above 30 Hp 94 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Quad / J. Heater / Vapour Cells 95 Dismantling, Fitting And Expanding Of Ss / Brass Tubes With Satisfactory Hydraulic Testing For Pan Tube 96 Ss Plate Lining In Different Size Of Equipments. 97 Dismantling, Cleaning & Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc. 98 Fitting Of Ms Pipe Line With Bend, Flange , Nipple Etc 99 Fabrication & Erection Ofcomplete Square / Rectangular Tank / Round With Conical Bottom 100 Fabrication & Fitting Ofms Coil ( Coils Are To Be Duly Bend And Not Offset Pipe Welding .Offset Welds Shall Not Be Treated As Coils But As Pipes ) 101 Fabrication & Fitting Ofss Coil 102 Welding Work For Various Equipments In B / H 103 Dismantling , Fabrication & Fitting Ofnew Coneand Umbrella Anywhere In The Factory. Cone Up To 01 Mtr. Dia 104 Dismantling, Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory.Cone Above 01 Mtr. Dia Upto 2.5Mtr Dia. 105 Dismantling , Fabrication & Fitting Of New Coneand Umbrella Any Where In The Factory, Cone Above 2.5 Mtr. Dia 106 Fabrication And Patchwotk Of Equipmentsusing Old / Newms Plateby 6 / 8 Mm Thick Plate Overround Vessels / Any Vessels 107 Mill House 108 Cutting Of Cheveran Grooveson Mill Rollers 109 Cutting Of Pine Apple Grooves On Mill Rollers. 110 Replacement Of Runners Of Cane Carrier , S.Rc & Irc Mbc And Rbcand Cane Un Loader Power Supply Angle 111 Fabrication Of Racks Of S.Rc & Irc And Due Modification Of Wear Plate Arrangement Using Metlon Pads 112 Repair Of S.Rc & Ircracks And Due Modification Of Wear Plate Arrangement Using Metlon Pads 113 Welding Of Worn-Out Holes Of Block Type Chain Link, Rack Holding Square And Duere Drilling Of Holes 114 Replacement Of Worn-Out Bootof Src& Irc 115 Fabrication Of New Juice Rings 116 Dismantling, Grinding & Erection Of The Square Bar Of Cane Un Loader 117 Welding On Wearout Mill And Grpf Crown Pinion Teeth As Per Profile. 118 Fabrication And Replacement Of New Mill Juice / Waterimbibitionsbox / Distributer. 119 Fabrication. & Erection. Of Mill Rollerfeed & Discharge Bearing Cover From 10 Mm / 8Mm Plate. 120 Fabrication & Erection Of Runner Supporting Box Below Runner At Irc, Src & Cane Carrier, Mbc And Rbcand Bagasse Elevator. 121 Replacement Of Worn Out Deflector Plate And Top Plate Of Cane Chopper / Cane Leveler / Fibrizer By M.S. Plate / Ss Lining Plates Along With Strengthening. 122 Replacement Of Worn Out Msbottom Plates Of Src & Irc. Rbc / Mbc Etc 123 Fabrication & Erection Of Cane Carrier Chain Side Angle. 124 Fabrication & Erection Of Return Cane Carrier Chain Supporting Runner / Chain Guide. 125 Fabrication & Erection Of Worn Out Ms Plate Of Truck Tripler, Src, Irc & Cane Carrier Side Plate. 126 Sprocket Teeth Repairing And Strengthening With Extra Support Of Irc / Src / Elevator / Mbc / Rbc 127 Repair & Hard Facing Of Auxiliary Cane Carrier Kicker / Pusher 128 Welding & Hard Facing On Wear Out Under Feed Roller Teeth, Side & Shell Of Roller. 129 Replacement Of Worn-Out Juice Screen Plate Of Screw Bagasseconveyorat Mill 130 New Src Coupling With Rg Box & Motor Bed Along With Sproket Plumber Block Fitting & Other Works As Required Is To Be Done With Successful Trail 131 Repair And Hard Facing On Cane Leveller / Chopper Hubs 132 Repair & Hard Facing On Wear Out Fibrizer Hubs 133 Lever Bracket Of Underfeed Roller Scraper To Be Changed & To Be Fitted On As Per Direction. 134 Partition Plate Of Half Anvil To Be Changed Completely With 25 Mm Plate & Hard Facing. 135 Welding And Forging In Holes Of Cane Carrier Chain Links. 136 Fabrication Of 10” Size Non Return Valve From M.S. Plate With Fitting & Leak Proof Trial. 137 Fibrizer Hammers To Be Made As Per Size & Weight By Welding & Hard Facing To Be Done. 138 Fabrication & Erection Of Rotary Filter Ms Conical Juice Tank. 139 Extension Of Ss Juice Distributer Pipe Of Rotary Filter 140 Repair Of Cane Carrier Slates Such As Worn-Out Side Wear Plates Holes& Other To Be Done 141 Fabrication & Hard Facing Of Under Feed Roller Scrapper As Per Instructions To Be Done. 142 Welding On Wear Out Teeth Of Cane Carrier, S.R.C. & I.R.C. Sprockets To Bedone & Teeth To Be Made As Per Profile 143 Ms Ring To Be Fitted On Worn-Out Both Side Of Bagasse Pusher At Fibrizer& Hard Facing To Be Done On Square Bars Fitted 144 Welding & Grinding Of Grpf Scrapper To Be Done To Make Them As Per Profile & Hard Facing To Be Done 145 Repair & Hard Facing Of Cane Unloadedgrab Finger 146 Rotary Screen Dismantling & Fitting At Site With All Accessories With Successful Trail 147 Cane Carrier Alignment & Fitting Of Rg Box, Gear, Drive Side Sproket As Per Modification Required By Fibrizer Rotor With Successful Trail 148 Underfeed Roller Pinion Hard Facing 149 Repairing Of Ms Guard / Cover Mill Rollers Crown Pinion 150 Fabrication & Fitting Of Chain Guide Cane Carrier & Bagasse Elevator 151 Dismantling & Fabrication Of Bagacillo Screen With Modification As Per Instruction. 152 TipplerS Patform Due Repairing With Ms Old / New Plates And Making Its Rough For The Vehicles 153 Elevator Perforated Mesh Repairing & Fitting With Sucessful Trail 154 Ss Plates Patching On The Truff Of Irc / Src And Mills Head Stock 155 Pan House 156 Repairing Ofdown-Take Of Pan For 40 / 50 Ton Pan 157 Repairing Ofdown-Take Of Pan For 60 / 80 Ton Pan 158 Replacement Of Worn Out / Broken Anglearms Of Crystallizer 159 Dismantling Of Gutter Of Molasses Magma & Massecuite. 160 Fabrication & Fitting Of Gutter Of Molasses, Magma & Massecuite. 161 Repairing Of Hinge Type Cover Of Gutter 162 Replacement Of Worn-Out Condensate Box Of Pans, Quad & Juice Heaters 163 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 40 / 50 Ton Pan 164 Dismantling Fabrication & Fitting Of New Umbrella In Pans With Supports & J Pipes 60 / 80 Ton Pan 165 Repairing Of Umbrella Of Pans With Supports & J Pipes 40 / 50 Ton Pan 166 Repairing Of Umbrella Of Pans With Supports & J Pipes 60 / 80 Ton Pan 167 Replacement Of Worn Out Distributor By New For 40 / 50 Ton Pan 168 Replacement Of Worn Out Distributor By New For 60 / 80 Ton Pan 169 Repair Of Wornout / Broken Of Air Cooled , Vacuum & Seed Crystallizer 170 Dismantling & Fabrication Of Wornout Injection Header With Complete Connections With Successful Trial 171 Dismantling Of 40 Ton Pan Complete Body Shell With Save All And Umbrella Feed Header, Distributer, Etc & Fabrication Of Shell With 12 / 10Mm Ms Plate With Satisfactory Trial 172 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-40 / 50 Ton Pan 173 Replacement Of Complete Worn-Out Top Conical Portion Of Pan By New Withsupports Of Associated Machinery Parts Proper Strengthening-60 / 80 Ton Pan 174 Strengthening Of 40 / 60 Ton Pan Body &Taper Portion With Channel Etc. 175 Replacement Of Worn Out Bushes Of Air Cooled Crystallizer Of Both Side & Completion With Proper Alignment & Successful Trial ( Bushes Will Be Provided By The Factory ) - Both Side ( Rate Ratio Drive : Non Drive End Shall Be 65:35 ) 176 Dismantling Fabrication & Erection Of Box Type Feed Header For Each Pan With Related All Connections. 177 Dismantling Fabrication & Erection Of Worn Out Portion Of Pan Body With 12Mm Plate With Water & Vacuum Trial 178 Replacement Of Wearout / Wornout Ms Side & Bottom Plate Of Water Over Head Tank / Syrup Storage Tanks At Pan Station 179 Repairing Of Wearout / Wornout Down Take Of Pans 40 / 50 Ton 180 Repairing Of Wearout / Wornout Down Take Of Pans 60 / 80 Ton 181 Repairing Of Wearout / Wornout Save-All Of Pans 40 / 50 Ton 182 Repairing Of Wearout / Wornout Save-All Of Pans 60 / 80 Ton 183 Evaporator & Clarification House 184 Dismantling, Repair & Refitting, Cleaning Work Of Catcher Of New Semikestner ( Uttam Set ) 185 Dismantling, Fabrication & Erection Work Of Evaporator Body / Semikestner / Vapour Cell Newsave All 186 Major Repair Of Save All Of The Evaporator Body / Semikestner / Vapour Cell 187 Dismantling, Fabrication & Erection Ofnew Juice Heater Header Withribs& Fitting Of Cover With Satisfactory Trial 188 Dismantling, Fabrication & Erection Work Of The Sulphur Furnace Melter / Melt Receiver Along With Steam Coil And Their Hydraulic Testing. 189 Dismantling, Fabrication & Erection Of Sulphur Furnace Cooler With Its Pipe Cooling Coil Complete Connection Of Water And Associated Pipe Lines With Satisfactory Trial 190 Repairing Of Sulphur Furnace Cooler With Its Pipe Cooling Coil And Complete Connection Of Water Cooling Pipe And Gas Line. 191 Dismantling, Fabrication & Erection Of Juice Receiving Bottle Fitted At Vacuum Filter Station 192 Dismantling, Fabrication & Erection Of Condenser At Vacuum Filter. 193 Dismantling, Fabrication & Erection Of Mud Juice Receiving Tank Complete With Connection & Associated Pipe Lines. 194 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 8’ X16’ Vacuum Filter 195 Dismantling, Fabrication & Erection Of Mud Tray Of Vacuum 10’ X20’ Vacuum Filter 196 Dismantling, Fabrication & Erection Of Vacuum Filter Agitator. 197 Dismantling, Fabrication & Erection Of The Juice Box Of Juice Heater With Satisfactory Trial. 198 Dismantling Fabrication & Fitting Of Bagacillo Pipe. 199 Dismantling , Fabrication & Erection Of Clear Juice Liquidation Box With Trial 200 Dismantling, Fabrication & Erection Of Clarifier Mud Boot. 201 Dismantling, Fabrication & Erection Ofjuice Catcher For Raw / Vacuum / Sugar Melter / Sulphitedjuice Pumpswith Suction / Delivery Connection 202 Repairing Of Juice Heater Condensate Bottle / Evaporator / Syrup Receiving Bottle With Leak Proof Testing Partition Plate With All Connection. 203 Repairingofso2 Furnace Sublimation Pipe With Its Leaking Tower Etc. With Testing 204 Dismantling, Fabrication & Erection Of Vacuum Filter Mud Mixer Body & Fitting Of Screw Conveyor With Proper Alignment & Satisfactory Trial. 205 Fabrication & Erection Of Screw Conveyor From 6Mm Thick Plate With Satisfactory Trial. 206 Dismantling, Fabrication & Fitting Of New Down Take Of Quad / Old Or New Semikestner, Etc. 207 Dismantling, Fabrication And Erection Of New Recovery Tower Of Juice Sulphiter / Syrup Sulphiter. 208 Replacement Of Muddy Juice Tank Fitted At Vacuum Filter With New Plates & With All Connections. 209 Repairing Of Umbrella Of Quad & Pan 210 Dismantling, Fabrication & Erection Of Worn Out Umbrella Of Quad & Pan 211 Dismantling, Fabrication & Erection Ofsaveall Ofquad Old Bodies 212 Dismantling, Fabrication & Erection Ofsaveall Ofquad Uttam Set. 213 Replacement Of Worn-Outtop Conical Portion Ofquad & Vapour Shell With Save All Proper Strengthening With Associated Machinery 214 Dismantling, Repair, & Erection Of Worn Out Juice Heater Partition Plate With Ribs. 215 Dismantling Of Worn Out Arms And Shell ( Outside & Inside ) Of Juice Sulphiter Drum, Fabrication & Erection With Satisfactory Trial. 216 Dismantlingof Worn Out Central Drum & Bed Of Juice Sulphiter, Fabrication & Erection With Satisfactory Trial. 217 To Replace Worn Out Clear Juice Box / Mud Discharge Box With Valve Of New Door Followed By Satisfactory Trial 218 Dismantling Ofwear Outjuice Heater Cover, Fitting Of New 12 Mm Thick Ms Plate By Welding & Bolting Including Repair Of Lever & Erection Of Cover Followed By Satisfactory Water Trial. 219 To Replace Worn Out Mud Scrapper Plate With Support & Vacuum Filter Fitting To Be Done. 220 To Replace Worn Out Juice Baffle Plate Of Door Compartment 221 Fabrication & Erection Of New Sulphur Furnace After Dismantling Of Old Furnace With Successful Water / Air Trial. 222 Major Repair Of Lime Slaker With Proper Alignment & Trial 223 Dismantling & Erectionofquad 440 Sq. Mtr. Calendria Include All Connection With Successful Trail 224 Dismantling, Fabrication & Erection Of After Burner Vessel. For So2 Furnace. 225 To Replace Worn Out Sulphur Furnace Header Of Size 8” / 10” 226 Dismantling, Fabrication & Erection Of Ammonia Pipe Inside New Evaporator Body 227 Replacement Of Worn-Out Stirrer Arms Of Clarifier Completed With All Support And Squeezers Etc. 228 Dismantling And Repairing Of 2300 Sq Mtrs Sk Catcher Of Uttam Quad Set With Satisfactory Trial 229 Replacement Of Partition Plate Of Old Door Compartment With 5 / 6 Mm Ms Plate 230 Dismantling, Fabrication & Erection Of 440 Sq Mtr Quad Body Shell With Save All, Top Taper Cone, Manhole And Its All Connection With Satisfactory Trial 231 Centrifugal House 232 To Replace Worn-Out Molasses Jacket Of B & C Continuous Centrifugal Machine With Proper Trial. 233 To Replace Worn-Out “A” Centrifugal Machine Molasses Chute / Housing Chute Followed By Satisfactory Trial. 234 To Replace Worn Out Half Portion Of Horizontal Sugar Melter In Centrifugal House With Steam & Juice Connection Followed By Satisfactory Trial. 235 Dismantling Of Worn Out B & C Centrifugal M / C, Magma Mixture Shaft, Fabrication Of Complete New Shaft With 12Mm Plate, Fitting Of Arms Etc. With Successful Trial. 236 Replacement Of Damaged Portion Of Hopper 237 Broken Shaft Of Cryst. To Be Made Correct Or Replaced By New One And Their Proper Alignment To Be Done. 238 Replacement Ofwornoutbushes & Arms Of Sugar Melter With Satisfactoty Trial 239 Replacement Of Cooling Pipe Of C & B Mono Cryst. 240 Replacement Of Wornout Suction Pipe Of Mf- 50 / 50 / 40 / 40 Injection & Spraypump 241 C- Pug Mill, Magma Mixer, Broken Shaft To Be Taken Out Andto Be Repaired / To Be Changed New, Bush, Support & Aram To Be Fitted A Satisfactory Trial. 242 Repairingof B & C Massecuitemono Cryst. Leakage Coil With Hydraulic Testing & And Successdul Trial. 243 B & C Magma Mixer, Pugmill Worn-Out Broken Shell To Be Replaced, Work To Br Completedwith Satisfactory Trial. 244 Dis. Of Worn-Outb & C Magma Mixer Shaft, Fab.& Erection Of The Shaft With 12 Mm M.S. Plate, Fittingand Successful Trial. 245 Replacement Ofworn- Out Molasses Ring Of 1350 Kt C / F Machine. 246 Dis., Fab. & Erection Of New. Fan Ofe.T.P. Aerator 247 Dismantling, Fabrication & Erection Of Worn Out Wk1350 C / F Machine Cover. 248 Replacement Ofdamaged Hopper Air Try With New Plate 249 Replacement Ofworn Out Magma / Pug Mill Worn Out Padestal Arms. 250 Replacement Ofweak / Wearout Ms Jali Of Hopper &Fitting With Frame 251 Dismantling Fabrication And Erection Of Air Diffuser For Etp From Old Boiler Tubes 252 Dismantling, Fabrication & Erection Of Worn Out C Twin Crystallizer Shell & Cooling Coils With Arms Along With Satisfactory Trail 253 A Centrifugal Machine 1250 Kg / Charge Wornout Moniter Casing Replacement & Patching Work 254 Replacement Of Worn-Out Bed Of Sugar Exiter With Proper Strengthening 255 Replacement Of Damaged / Worn-Out Arms Of Mono Crystillizer
Contract Date: Ref. Documents Contract Value : Ref. Document
Cooperative No of Bidders 7
Uttar Pradesh View Result →
25.
Public Administrative Department #9121268 Technical Bid
Tender For Welding Electrodes-- 1 Welding Electrodes 2 Welding Electrodes CACI 540, Diffusion make, size 3.15 mm. 3 Welding Electrodes CACI 540, Diffusion make, size 4.00 mm. 4 Welding Electrodes super Bronze size 3.15 mm. 5 Welding Electrodes super Bronze size 4.00 mm. 6 Super gauge welding electrodes size 4.00 mm 7 Welding Electrodes Essen- 80 (Unoweld), Brizil make size 4.00 mm 8 Welding Electrodes Essen CCR- 62/1 size 3.15 mm 9 Welding Electrodes Essen CCR- 62/1 size 4.00 mm. 10 Welding Electrodes Essen - 100size 3.15 mm 11 Welding Electrodes Essen - 100 size 4.00 mm 12 Welding Electrode NiCr 8GS size 3.15 mm 13 Welding Electrode NiCr 8GS size 4.00 mm 14 Terroweld DLH size 4 .00 mm (ESSAB Make) 15 Terroweld DLH size 3.2 mm (ESSAB Make) 16 Terroweld DS3 size 4.00 mm (ESSAB Make) 17 Terroweld DS3 size 3.2 mm (ESSAB Make) 18 Terroweld DS4 size 4.00 mm (ESSAB Make) 19 Terroweld DS4 size 3.15 mm (ESSAB Make) 20 O.K. Selectrode 21.03 size 4.00 mm (ESSAB Make) 21 O.K. Selectrode 83.40 size 4.00 mm (ESSAB Make) 22 O.K. Selectrode 83.40 size 3.15 mm (ESSAB Make) 23 O.K C.I.Size 4.00 mm (ESSAB Make) 24 O.K C.I.Size 3.15 mm (ESSAB Make) 25 Welding Electrodes 160 (680)size 1.6 mm. 26 Welding Electrodes 160 (680) Size 2.5 mm 27 Welding Electrodes 160 (680)Size 3.15 mm 28 Welding Electrodes 160 (680) size 4.00 mm. 29 For Brass bronze Welding ElectrodesEXD 5600 (XHD2800) size 4.00 mm. 30 For Brass bronze Welding ElectrodesEXD 5600 (XHD2800) size 3.15 mm 31 For brass bronze electrode wunder bronzo158Size 3.15 mm 32 For brass bronze electrode wunder bronzo158Size 4.00 mm 33 Welding ElectrodesEwacslide 12 (6006) size 2.50 mm. 34 Welding ElectrodesEwacslide 12 (6006) size 3.15 mm. 35 Welding ElectrodesEwacslide 12 (6006) size 4.00 mm. 36 Welding Electrodes120 (660 NH)size 3.15 mm 37 Welding Electrodes120 (660 NH)size 4.00 mm 38 Welding ElectrodesUnitro M – (AMOL)size 3.15 mm 39 Welding ElectrodesUnitro M – (AMOL)size 4.00 mm 40 Ewac (L & T) make Brazing Rod Ewacstik E 10 (1805) size 3.15 mm. 41 Ewac (L & T) Make Eutector flux 1805 for above. 42 Pinion Teeth hardfacing BU 4 (2B). 43 Wunder – 80 (2240)size 3.15 mm. 44 Wunder – 80 (2240)size 4.00 mm. 45 S.S. to M.S. Spectra 80 Lsize 3.15 mm. 46 S.S. to M.S. Spectra 80 Lsize 4.00 mm. 47 CPSM- 022 48 For CI machienablespectra CI 01 Size3.15 mm 49 For CI machienablespectra CI 01 Size4.00 mm 50 Tubular Electrode for hard facing ID fan and pump impeller Ewac TE-81 Size 4.00 mm 51 Tubular Electrode for hard facing ID fan and pump impeller Ewac TE-81Size 6.00 mm 52 CPEM – 021 Size3.15 mm 53 CPEM – 021 Size4.00 mm
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 5
27.
Heavy Industries and Public Enterprises #8516882 AOC
Bids Are Invited For Custom Bid For Services - Mechanical Maintenance Contract Of 52/01 Area & 56 Area Of Alumina Refinery; EQUIPMENT: T.T.HOPPER FLAP GATE. 1 Replacement of liners(Manganese Steel) of Disch. Chute of Mines conveyor plate in T.T.Hopper & Flap gate, and in skirt board OR (includes erection & removal ofany scaffoldings if required) NO A 4 1575.27 2 Replacement of liners(Manganese Steel) of Disch. Chute of Mines conveyor plate in T.T.Hopper & Flap gate, and in skirt board OR (includes erection & removal ofany scaffoldings if required) NO B 1 901.68 3 Removal of old flap gate, fitting of new flap gate inside the T.T.Hopper, alignment of the new gate, checking of the new gate for proper operation. NO A 1 26595.73 4 TT hopper Flap gate fabrication NO B 1 22486.27 5 Replacement of flap gate actuator. NO A 2 2909.89 6 Replacement of flap gate actuator. NO B 1 2217.21 7 Repairing of flap gate actuator. NO A 1 2410.23 8 Repairing of flap gate actuator. NO B 1 2121.59 9 Flap gate actuator U pin holder repairing, fixing/ changing includes removal & fixing of flap gate pin. NO A 1 1260.32 10 Flap gate actuator U pin holder repairing, fixing/ changing includes removal & fixing of flap gate pin. NO B 1 566.13 11 Flap gate drive pin chaging / removal & fixing NO A 1 229.88 12 Flap gate drive pin chaging / removal & fixing NO B 1 141.54 13 Replacement of Bearing Housings andbearing in flap Gate Drive Shaft. NO A 1 6299.28 14 Replacement of Bearing Housings andbearing in flap Gate Drive Shaft. NO B 1 4497.26 15 Opening of undercover for flap gate andfixing it back NO A 1 1574.82 16 Opening of undercover for flap gate andfixing it back NO B 4 1478.14 17 Repair of Flap Gate . The job includes includes opening of mandoor, scaffolding,removal of old Flap Gate, cleaning, rewelding, replacement of liner, fixing of Flap Gate, fixing of mandoor, removal ofscaffolding . NO A 1 31480.16 18 Repair of Flap Gate . The job includes includes opening of mandoor, scaffolding,removal of old Flap Gate, cleaning, rewelding, replacement of liner, fixing of Flap Gate, fixing of mandoor, removal ofscaffolding . NO B 1 22486.27 19 Flap gate actuator gearbox replacement TIME A 6 1600.99 20 Flap gate actuator gearbox replacement TIME B 1 1124.33 21 APRON FEEDER 701,702:- Replacement of Shear Pin NO A 1 315.09 22 APRON FEEDER 701,702:- Replacement of Shear Pin NO B 1 176.92 23 APRON FEEDER 701,702:- Tensioning & detensioning of Apron feeder NO A 1 1260.32 24 APRON FEEDER 701,702:- Counter shaft/Drive shaft/Tail shaft bearing checking TIMES A 1 2477.32 25 APRON FEEDER 701,702:- Replacement of Top Deck Roller NO A 1 970.94 26 APRON FEEDER 701,702:- Replacement of Top Deck Roller NO B 8 616.40 27 APRON FEEDER 701,702:- Replacement of Bottom Deck Roller/Return Roller NO A 1 1260.32 28 APRON FEEDER 701,702:- Replacement of Bottom Deck Roller/Return Roller NO B 4 899.45 29 APRON FEEDER 701,702:- Checking/replacement of flight bolt,sprocketbolt etc. TIME A 1 1840.24 30 APRON FEEDER 701,702:- Checking/replacement of flight bolt,sprocketbolt etc. TIME B 2 1697.27 31 APRON FEEDER 701,702:- Replacement of conveyor flight which includes detensioning of apron chain, removal of deck rollers, replacement of flight and reassembly of deck rollers and chain tensioning. NO A 1 2429.37 32 APRON FEEDER 701,702:- Replacement of conveyor flight which includes detensioning of apron chain, removal of deck rollers, replacement of flight and reassembly of deck rollers and chain tensioning. NO B 1 1686.48 33 APRON FEEDER 701,702:- Grease filling in grease tank NO A 1 392.13 34 APRON FEEDER 701,702:- Grease filling in grease tank NO B 188 283.07 35 APRON FEEDER 701,702:- Deck plate removal & fixing. TIME A 1 919.54 36 APRON FEEDER 701,702:- Deck plate removal & fixing. TIME B 1 707.66 37 APRON FEEDER 701,702:- Drive shaft bearing replacement includes detensioning of feeder chain, hood opening, decoupling of gearbox, bearing changing and assembly, alignment between gearbox anddrive shaft, tensioning of chain TIME A 1 30691.76 38 APRON FEEDER 701,702:- Drive shaft bearing replacement includes detensioning of feeder chain, hood opening, decoupling of gearbox, bearing changing and assembly, alignment between gearbox anddrive shaft, tensioning of chain TIME B 1 22737.61 39 APRON FEEDER 701,702:- Drive shaft replacement including bearing replacement TIME A 1 28661.6 40 APRON FEEDER 701,702:- Drive shaft replacement including bearing replacement TIME B 1 27281.24 41 APRON FEEDER 701,702:- Tail shaft bearing replacement includes detensioning of feeder chain, dismantling of tail shaft, bearing changing, assembly and tensioning of chain TIME A 4 12519.26 42 APRON FEEDER 701,702:- Tail shaft bearing replacement includes detensioning of feeder chain, dismantling of tail shaft, bearing changing, assembly and tensioning of chain TIME B 1 11368.81 43 APRON FEEDER 701,702:- Tail shaft replacement includes detensioning of feeder chain, dismantling of chain, removal of tailshaft, bearing changing/ checking, removal of sprockets, assembly of tail shaftand tensioning of chain. TIME A 1 15361.46 44 APRON FEEDER 701,702:- Tail shaft replacement includes detensioning of feeder chain, dismantling of chain, removal of tailshaft, bearing changing/ checking, removal of sprockets, assembly of tail shaftand tensioning of chain. TIME B 1 13868.78 45 APRON FEEDER 701,702:- Countershaft replacement includes detentioning of feeder chain, removal of Counter shaft, removal of pinoin, bearing changing/ checking, assembly of Countershaft, fixing of pinion and tensioning of chain. TIME A 1 29727.77 46 APRON FEEDER 701,702:- Countershaft replacement includes detentioning of feeder chain, removal of Counter shaft, removal of pinoin, bearing changing/ checking, assembly of Countershaft, fixing of pinion and tensioning of chain. TIME B 1 4622.94 47 APRON FEEDER 701,702:- Countershaft bearing replacement includes detensioning of feeder chain, removal of Counter shaft, removal of pinoin, bearing changing, assembly of Countershaft, fixing ofpinion and tensioning of chain TIME A 1 15854.81 48 APRON FEEDER 701,702:- Countershaft bearing replacement includes detensioning of feeder chain, removal of Counter shaft, removal of pinoin, bearing changing, assembly of Countershaft, fixing ofpinion and tensioning of chain TIME B 1 5393.42 49 APRON FEEDER 701,702:- Checking of centralised lub. Lines. TIME A 1 1726.63 50 APRON FEEDER 701,702:- Checking of centralised lub. Lines. TIME B 4 1061.48 51 APRON FEEDER 701,702:- Checking / rectification of centralised lub.pump . NO A 2 2871.03 52 APRON FEEDER 701,702:- Checking / rectification of centralised lub.pump . NO B 2 1769.14 53 APRON FEEDER 701,702:- Scraper conveyor gear box replacement. NO A 1 4733.05 54 APRON FEEDER 701,702:- Scraper conveyor gear box replacement. NO B 1 2122.97 55 APRON FEEDER 701,702:- Scraper conveyor coupling replacement. NO A 1 1726.63 56 APRON FEEDER 701,702:- Scraper conveyor coupling replacement. NO B 4 1415.31 57 APRON FEEDER 701,702:- Scraper conveyor coupling pad checking/replacement. NO A 1 1144.4 58 APRON FEEDER 701,702:- Scraper conveyor coupling pad checking/replacement. NO B 1 707.66 59 APRON FEEDER 701,702:- Scraper conveyor tail wheel shaft replacement includes detensioning of chain, dismantling of chain, removal of tailshaft, bearing changing/ TIME A 2 15854.81 60 APRON FEEDER 701,702:- Scraper conveyor tail wheel shaft replacement includes detensioning of chain, dismantling of chain, removal of tailshaft, bearing changing/ checking, removal of wheel, assembly of tail shaft and tensioning of chain . TIME B 1 8129.77 61 APRON FEEDER 701,702:- Scraper conveyor tail wheel bearing replacement includes detentioning of chain, dismantling of chain, removal of tailshaft, bearing changing, removal of wheel, assembly of tail shaft and tensioning of chain. NO A 1 9677.06 62 APRON FEEDER 701,702:- Scraper conveyor tail wheel bearing replacement includes detentioning of chain, dismantling of chain, removal of tailshaft, bearing changing, removal of wheel, assembly of tail shaft and tensioning of chain. NO B 1 7390.70 63 APRON FEEDER 701,702:- Drive shaft of scraper conveyor replacement includes detensioning of chain, decoupling of gearbox, removal of drive shaft, bearing changing/ checking, removal of sprockets, assembly of drive shaft, alignment betweengearbox and drive shaft, tensioning o TIME A 1 11805.07 64 APRON FEEDER 701,702:- Drive shaft of scraper conveyor replacement includes detensioning of chain, decoupling of gearbox, removal of drive shaft, bearing changing/ checking, removal of sprockets, assembly of drive shaft, alignment betweengearbox and drive shaft, tensioning o TIME B 1 7390.70 65 APRON FEEDER 701,702:- Drive shaft bearing replacement incldes detensioning of chain, decoupling of gearbox, bearing changing and assembly of drive shaft, alignment between gearbox and driveshaft, tensioning of chain. NO A 1 11805.07 66 APRON FEEDER 701,702:- Drive shaft bearing replacement incldes detensioning of chain, decoupling of gearbox, bearing changing and assembly of drive shaft, alignment between gearbox and driveshaft, tensioning of chain. NO B 1 7390.70 67 APRON FEEDER 701,702:- Tensioning & detensioning of Scraper chain. NO A 28 1144.4 68 APRON FEEDER 701,702:- Tensioning & detensioning of Scraper chain. NO B 1 1124.33 69 APRON FEEDER 701,702:- Repositioning of disloged chain. TIME A 14 1928.65 70 APRON FEEDER 701,702:- Repositioning of disloged chain. TIME B 1 1478.14 71 APRON FEEDER 701,702:- Scraper conveyor take up assy. Changing/servicing. TIME A 4 2366.53 72 APRON FEEDER 701,702:- Scraper conveyor take up assy. Changing/servicing. TIME B 4 1686.48 73 APRON FEEDER 701,702:- Scraper conveyor chain replacement includes detensioning of chain, dismantling of chain, repositioning of chain and tensioning of chain. (chain consists of 39 sections) TIME A 1 5586.32 74 APRON FEEDER 701,702:- Scraper conveyor chain replacement includes detensioning of chain, dismantling of chain, repositioning of chain and tensioning of chain. (chain consists of 39 sections) TIME B 1 3081.96 75 APRON FEEDER 701,702:- Scraper conveyor part chain replacement includes detensioning of chain, dismaentling of chain, repositioning of chain and tensioning of chain. TIME A 2 3985.23 76 APRON FEEDER 701,702:- Scraper conveyor part chain replacement includes detensioning of chain, dismaentling of chain, repositioning of chain and tensioning of chain. TIME B 1 3081.96 77 APRON FEEDER 701,702:- Scraper conveyor chain shackle replacement includes detensioning of chain, changing of chain shackle, repositioning of chain andtensioning of chain NO A 1 1379.30 78 APRON FEEDER 701,702:- Scraper conveyor chain shackle replacement includes detensioning of chain, changing of chain shackle, repositioning of chain andtensioning of chain NO B 4 1061.48 79 APRON FEEDER 701,702:- Scraper conveyor flight replacement includes detensioning of chain, changing of flight, repositioning of chain and tensioning of chain. NO A 40 3151.83 80 APRON FEEDER 701,702:- Scraper conveyor flight replacement includes detensioning of chain, changing of flight, repositioning of chain and tensioning of chain. NO B 1 1061.48 81 STACKER:-Boom Conveyor Gearbox Replacement including alignment NO A 1 34682.39 82 STACKER:-Boom Conveyor Fluid coupling Replacement including alignment NO A 1 11891.12 83 STACKER;- Tripper Pulley bearing Checking NO A 1 1981.86 84 Removal & refitting of large balancer for inspection of pin housings, bearing etc. , while super structure of reclaimer is in lifted condition. NO A 1 78355.15 85 Removal & refitting of large balancer for inspection of pin housings, bearing etc. , while super structure of reclaimer is in lifted condition. NO B 1 59863.74 86 STACKER/RECLAIMER:-Replacement of Six wheel pin assy of fixed leg while large balancer is in removed condition. NO A 1 3834.48 87 STACKER/RECLAIMER :-Replacement of Six wheel pin assy of fixed leg while large balancer is in removed condition. NO B 1 3750.85 88 STACKER SLEW GEARBOX FOUNDATION BOLT CHECKING NO A 1 593.91 89 STACKER LUB PUMP CHECKING NO B 1 354.28 90 RECLAIMER - 01, 02 & 03:-Bucket chain clamps replacement / fixing. NO A 26 286.1 91 RECLAIMER - 01, 02 & 03:-Bucket chain clamps replacement / fixing. NO B 1 176.92 92 RECLAIMER - 01, 02 & 03:-Bucket chain rods replacement/fixing. NO A 26 572.21 93 RECLAIMER - 01, 02 & 03:-Bucket chain rods replacement/fixing. NO B 8 353.84 94 RECLAIMER - 01, 02 & 03:-Bucket chain mesh replacement. NO A 20 1385.57 95 RECLAIMER - 01, 02 & 03:-Bucket chain mesh replacement. NO B 1 566.13 96 RECLAIMER - 01, 02 & 03:-Bucket repair in situ.The repairing includes chain,backside clamp &body by cutting&welding. NO A 58 3148.51 97 RECLAIMER - 01, 02 & 03:-Bucket repair in situ.The repairing includes chain,backside clamp &body by cutting&welding. NO B 1 566.13 98 RECLAIMER - 01, 02 & 03:-Bucket replacement NO A 2 7085.50 99 RECLAIMER - 01, 02 & 03:-Bucket replacement NO B 1 1773.78 100 RECLAIMER - 01, 02 & 03:-Bucket repair consisting of chain mesh replacement, Bucket body repair by welding. NO A 10 6198.75 101 RECLAIMER - 01, 02 & 03:-Bucket repair consisting of chain mesh replacement, Bucket body repair by welding. NO B 1 3396.74 102 RECLAIMER - 01, 02 & 03:-Bucket hardfacing using suitable hard facing electrodes. Hard facing electrodes shall be provided by NALCO free of charges. NO A 1 1726.63 103 RECLAIMER - 01, 02 & 03:-Bucket hardfacing using suitable hard facing electrodes. NO B 1 1061.48 104 STACKER, RECLAIMER - 01, 02 & 03:-All leg bolts ,balancer bolts &pin joint side plate fasteners tightness checking (If required bolt replacement will be done) TIME A 1 9195.3 105 STACKER, RECLAIMER - 01, 02 & 03:-All leg bolts ,balancer bolts &pin joint side plate fasteners tightness checking TIME B 1 5661.22 106 RECLAIMER - 01, 02 & 03:-Bucket wheel inspection door opening forcleaning & box up NO A 1 919.54 107 RECLAIMER - 01, 02 & 03:-Bucket wheel inspection door opening forcleaning & box up NO B 1 566.13 108 RECLAIMER - 01, 02 & 03:-Bucket wheel support box replacement NO A 1 2366.53 109 RECLAIMER - 01, 02 & 03:-Bucket wheel support box replacement NO B 1 1061.48 110 RECLAIMER - 01, 02 & 03:-Bucket wheel drive coupling bush/pin/disc replacement NO A 1 1549.69 111 RECLAIMER - 01, 02 & 03:-Bucket wheel drive coupling bush/pin/disc replacement NO B 1 1182.52 112 RECLAIMER - 01, 02 & 03:-Bucket tooth replacement / bolt replacement NO A 60 392.13 113 RECLAIMER - 01, 02 & 03:-Bucket tooth replacement / bolt replacement NO B 8 176.92 114 Reclaimer Bucket Pin replacement NO A 4 1574.82 115 Reclaimer Bucket Pin replacement NO B 120 1124.33 116 RECLAIMER - 01, 02 & 03:-Bucket wheel drive gearbox support legbrgs./ vibration dampener replacement. NO A 1 4512.19 117 RECLAIMER - 01, & 03:-Bucket wheel drive gearbox LUB PUMP REPLACEMENT NO A 1 849.19 118 RECLAIMER - 01, 02 & 03:-Bucket wheel drive gear box input oil seal replacement includes removal & fixing of motor, coupling, changing of oil seal, topping of oil & all associated jobs. NO A 8 4838.54 119 RECLAIMER - 01, 02 & 03:-Bucket wheel drive fluid coupling replacement NO B 1 3695.36 120 RECLAIMER - 01, 02 & 03:-Bucket wheel drive gear box motor alignment. NO A 1 2270.00 121 RECLAIMER - 01, 02 & 03:-Bucket wheel oil hose replacement NO A 1 1592.23 122 RECLAIMER - 02 :-Bucket Wheel Gear box replacement includes decoupling at motor & bucket wheel end, removal of motor, positioning of gear box and alignment. NO A 1 42569.50 123 RECLAIMER -02 :- B/W Gear box antivibration pad assembly replacement NO B 1 14616.08 124 RECLAIMER - 01, 02 & 03:-B/W NDE bearing or housing replacement (includes removal & fixing of Bucket Wheel discharge chute. Welding of required plates for jacking and any other activity required for this job). NO A 1 31480.16 125 RECLAIMER - 01, 02 & 03:-B/W DE/NDE bearing checking NO A 1 3468.25 126 Reclaimer -001,002& 003 BOOM / BRIDGE fluid coupling replacement which includes removal rotable invert, fixing of new flange coupling and aligning with the gear box. NO A 1 5041.24 127 Reclaimer - 001,003 BOOM / BRIDGE Gear coupling replacement which includes alignment & other associated jobs NO A 1 19818.51 128 Reclaimer - 2, BOOM/ BRIDGE fluid coupling rubber pad replacement. NO A 1 1839.06 129 Reclaimer - 2, BOOM/ BRIDGE fluid coupling rubber pad replacement. NO B 1 1132.25 130 RECLAIMER - 01, 02 & 03:-Bucket Wheel replacement (includes shifting& erection of required props under the pylon or hanging of required counter weight at the desired location, removal of required counterweight if required, arranging suitable lifting arrangement for Wheel, removal of Bucket Wheel Drive system along with the foundation after loosening the Shrink disc coupling and Erecting the Bucket wheel, the drive system and removal of hanging counter weights or props and inserting the removed counter weight and associated jobs.. Fabrication of props is not in the scope of this job. However, fabrication of box for removal of counterweight is to be done by the contractor. Matl. for fabrication of box shall be issued by NALCO free of charges. Also for shifting of props, gear box & removal of counterweight. Crane / manual winch facilityshall be arranged by NALCO free of charges. NO A 1 3468.25 131 RECLAIMER - 01, 02 & 03:-Bucket Wheel replacement NO B 1 4459.18 132 OLD STACKER, NEW STACKER,RECLAIMER - 01, 02 & 03:-Replacement of LT drive bogie of Stacker/ Reclaimer. This job includes removal, refixing and alignment of motor and gear box, coupling and its associated parts. Removal and refixing of grease distributor and its grease lines, cutting & welding of supports (as per requirement) and its to and fro transportation, erection,dismantling is in the scope of the contracter. However supports and lifting jacks and hydra/forklift will be provided by NALCO. NO A 1 39637.02 133 OLD STACKER, NEW STACKER,RECLAIMER - 01, 02 & 03:-Replacement of LT follower bogie of Stacker/ Reclaimer.Cutting & welding of supports (as per requirement) and its to and fro transportation, erection,dismantling is in the scope of the contracter. However supports and lifting jacks and hydra/forklift will be provided by NALCO. NO A 1 27745.92 134 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Conveyor Impact Idler replacement. NO A 198 604.46 135 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Conveyor Impact Idler replacement. NO B 94 424.60 136 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Carrying Idler replacement NO A 154 604.46 137 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Carrying Idler replacement NO B 24 424.60 138 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Return Idler / pressure idler replacement or fixing NO A 60 774.85 139 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Return Idler / pressure idler replacement or fixing NO B 1 591.27 140 STACKER BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Motor and Gear box alignment NO A 1 1890.47 141 STACKER BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Motor and Gear box alignment NO B 1 1349.18 142 STACKER BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Gear Box replacement includes replacement of coupling, installing Fluid coupling after alignment. Transportation facility for shifting of gear box & crane for lifting of the gear box to reclaimer shall be provided by NALCO free ofcharges. NO A 1 14863.89 143 STACKER BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Gear Box replacement NO B 1 4622.94 144 STACKER TRIPPER / BOOM / RECLAIMER BOOM CONVEYOR / BRIDGE CONVEYOR:- Drive pulley replacement ( Necessary crane facilities shall be providedby NALCO free of charges) .Gearbox ,Fluid coupling dismantling&Erection with Alignment will be paid extra. NO A 1 39637.02 ... more in document
Contract Date: Ref. Documents Contract Value : 4.76 Crore
Boards / Undertakings / PSU No of Bidders 11
Contract Date: Ref. Documents Contract Value : 15.18 Lakh
Government Departments No of Bidders 11
Chhattisgarh View Result →
30.
Road Transport and Highways #7910425 AOC
Bids Are Invited For Title1 Sand paper No 20-120 Title2 Twin Jute/Sutli Title3 Hack saw blade 12inch x1/2 with one side cutter Title4 Hack saw blade 12inch x 1 with one side cutter Title5 Electric Line Tester Title6 Screw Driver Set fo 5 Pcs Title7 Insulated Combination plier 165mm Title8 Hand gloves Rubber Red Title9 Light Duty Drill Machine Title10 Screw Driver 8inch Flat Tip Title11 Screw Driver 8inch Star Tip Title12 Battery Distilled Water Title13 Battery Lead Heavy Duty +ve Title14 Battery Lead Heavy Duty -ve Title15 Cotton Waste Title16 Tyre Pressure Gauge Heavy Duty Title17 Cable Cutter of Size 160 mm or more Title18 Screw Driver 6inch Title19 Screw Driver 18inch Title20 Screw Driver 12inch Title21 Star Screw Drvier 8inch Title22 Combination Plier 9inch Title23 Chisel Title24 Cold Chisel Title25 Non Skid Chain (245/65R17) for Mahindra Scorpio N Title26 Non Skid Chain (235/65R17) for M&M Scorpio Title27 Tyre inflating Hose Title28 File Flate Title29 File Haf Round Title30 File Round Title31 File Trangle Title32 File Needle Title33 Non Skid Chain (235/75R15) for Mahindra Camper Title34 Non Skin Chain (215/75R-15) for Mahinra Bolero Title35 CGS Rod Title36 Zed Alloy Hardfacing electrode 3 point 20mm x 450 mm Title37 MS Shuttering plate size 1Mtr x 1Mtrs Title38 MS Shuttering plate size 1Mtr x 0 point 5 Mtrs Title39 Zed Alloy Hardfacing electrode 4mm x 450 mm Title40 Cast Iron Welding Electrode 224 size 3 point 15mm Title41 Cast Iron Welding Electrode 224 size 4mm Title42 Non Skin Chain (750x16) for Tata 407 Title43 Non Skin Chain (1000x20) for Tipper LC Title44 Brazing Rod Brass 1mm size Title45 Brazing Rod Brass 2mm size Title46 Gas welding MS filler rod 1mm size Title47 Gas welding MS filler rod 2mm size Title48 Hand Gloves leather for welding Title49 Non Skin Chain (16 point 9X28) for JCB Rear Wheel Title50 Non Skin Chain (12 point 5x80-18) for JCB Front Wheel Title51 Welding Glass Black (11 Din) Title52 Welding Glass White Title53 Welding Screen(Make ESAB/ESAB/ADOR/L&T) Title54 Spark Lighter for Gas Welding Title55 Flux for Brazing Title56 Non Skin Chain (16 point 9 x 30) for MU Tractor Title57 Non Skin Chain (1400x25) for Wheel Loader Title58 Gas Welding Cutting Torch (Make ESAB/ESAB/ADOR/L&T) Title59 Blow Pipe for Gas Welding (Make ESAB/ESAB/ADOR/L&T) Title60 Gas Cutter Nozzle 3/64inch (Make ESAB/ESAB/ADOR/L&T) Title61 MS Shuttering plate size 1 point 00 Mtr x 1 point 20 Mtrs Title62 MS Shuttering plate size 1 point 00 Mtr x 0 point 60 Mtrs Title63 Gas Cutter Nozzle 1/16inch (Make ESAB/ESAB/ADOR/L&T) Title64 Nozzle Tip cleaner for Gas cutter Title65 Welding Holder 600 Amps (Make ESAB/ADOR/L&T) Title66 Flash back arrestor for DA Gas Cylinder (Make EESAB/ADOR/L&T) Title67 Flash back arrestor for Oxygen Gas Cylinder (Make ESAB/ADOR/L&T) Title68 Flash back arrestor for DA Torch Mount (Make ESAB/ADOR/L&T) Title69 Flash back arrestor for Oxygen Torch Mount (Make ESAB/ADOR/L&T) Title70 Non Skin Chain (365/85R-20) for Snow Cutter Title71 Non-Skin Chain size 1100x20 for Mahindra Dumper Title72 Saftey Goggles Title73 HSS PS Drill Bit 4mm (Make Totem/Addison/Miranda) Title74 Foam Sheet 6ft x3ft x3inch Title75 Foam Sheet 6ft x3ft x2inch Title76 Power Flux for gas welding of aluminium & its alloys (each packet of 500 gm) Aluminium Title77 Aluminium welding electrodes for manual Arc welding electrode for welding pure AL & its alloy size 3 point 15mm Title78 MS Shuttering plate size 1 point 20 Mtr x 0 point 45 Mtrs Title79 MS Pipe 40mm dia 06 Mtr long Title80 Hand Grinding Stone for angle grinder 100x16x6 Title81 Norton Gold Carbide Grinding Wheel (150 X 25 X 31 point 5mm) Title82 Grinder disc 4 inch Thickness 16 mm (Make Bosch/Norton/Carborundum) Title83 Cutter disc14 inch for Chopsaw Machine (Make Bosch/Norton/Carborundum) Title84 Hand grinder wheel 100x6x16 mm (Make- Bosch/Norton/Carborundum) Title85 Hand Grinder Cut off wheel 107x1 point 5x16 mm (Make- Bosch/Norton/Carborundum) Title86 Packing Paper/fire ply sheet (thickness 2 mm) Title87 Non-Skin Chain size 295/95D20 for AL Tpr Title88 Non-Skin Chain size 295/90R20 for AL Tpr Title89 Banjo washer 10mm (Material Copper) Title90 Banjo washer 12mm (Material Copper) Title91 Banjo washer 16mm (Material Copper) Title92 Banjo washer 17mm (Material Copper) Title93 Banjo washer 19mm (Material Copper) Title94 Banjo washer 20mm (Material Copper) Title95 Non-Skin Chain Size 385/65R22-5 for Snow Cutter Title96 Swivel coupler of 50mm x 50mm Title97 Banjo Bolt 17 mm Title98 Banjo Bolt 19 mm Title99 Fuel pipe (Material PVC Double Layer) Title100 Hose Clamp 0 point 5 inch Title101 Hose Clamp 1 inch Title102 Hose Clamp 1point 5 inch Title103 Hose Clamp 2 inch Title104 Adjustable base plate having threaded screw of 325mm lehgth with captive nut welded to 150mmx 150 mm (6mm thick) plate to allow adjustable of button or top of scaffolding confirming of BIS standards. Title105 Anabond Gasket Sealing tube (50 Gm) Title106 O-Ring Assortment Kit (Contains 407 O rings with 32 sizes of O-rings from 1/16 inch section - 1/4 inch O D to 1/8 inch section - 2 1/4 inch O D) Title107 Adjustable strip head (Dia 36mm) having threaded screw on 450mm lehgth with circular soild disc 120mm dia as adjustable collar confirming to BIS standards. Title108 Nut & Bolts 6x1 mm Title109 Nut & Bolts 8x1 point 25mm Title110 Nut & Bolts 10x1 point 25 mm Title111 Nut & Bolts 12x1 point 25 mm Title112 Nut & Bolts 12x1 point 5 mm Title113 Nut & Bolts 14x1 point 25 mm Title114 Nut & Bolts 14x1 point 5 mm Title115 Nut & Bolts 16x1 point 25 mm Title116 Nut & Bolts 16x1 point 5 mm Title117 Nut & Bolts 16x2 mm Title118 Nut & Bolts 18x1 point 25 mm Title119 Nut & Bolts 18x1 point 5 mm Title120 Nut & Bolts 3/16inch 24TPI Title121 Nut & Bolts 5/16inch 18TPI Title122 Nut & Bolts 3/8inch 16TPI Title123 Nut & Bolts 7/16inch 14TPI Title124 Nut & Bolts 3/4inch 10TPI Title125 Nut & Bolts 1inch 8TPI Title126 Nut & Bolts 1/4inch 20TPI Title127 Nut & Bolts 3/18inch 24TPI Title128 Nut & Bolt for shuttering 12mm dia 40mm long Title129 Propeller Shaft Bolt & Nut 17 (Self Lock) (Make TVS) Title130 Propeller Shaft Bolt & Nut 19 (Self Lock) (Make TVS) Title131 Flat Washer M10 Title132 Flat Washer M12 Title133 Flat Washer M16 Title134 Flat Washer M18 Title135 Flat Washer M20 Title136 Right angle coupler 50mmx 50mm Title137 Spring Washer 17mm Title138 Spring Washer 19mm Title139 Spring Washer 20mm Title140 Spring Washer 24mm Title141 Anabond (85 gm) Title142 PTFE thread seal tape (W) 25 point 0mm x (T) 0 point 075mm x (L) 12M Title143 PTFE thread seal tape (W) 12 point 5mm x (T) 0 point 075mm x (L) 12M Title144 Banjo Bolts (M8x1) Title145 Banjo Bolts (M10x1) Title146 Banjo Bolts (M10x1 point 25) Title147 Banjo Bolts (M10x1 point 5) Title148 Banjo Bolts (M12x1) Title149 Banjo Bolts (M12x1 point 25) Title150 Banjo Bolts (M12x1 point 5) Title151 Banjo Bolts (M14x1 point 5) Total Quantity : 13949
Contract Date: Ref. Documents Contract Value : 1.31 Crore
Government Departments No of Bidders 5
Contract Date: Ref. Documents Contract Value : 1.07 Lakh
Government Departments No of Bidders 3
West Bengal View Result →
Contract Date: Ref. Documents Contract Value : 1.04 Lakh
Government Departments No of Bidders 4
Contract Date: Ref. Documents Contract Value : 5.00 Lakh
Government Departments No of Bidders 7
West Bengal View Result →
Contract Date: Ref. Documents Contract Value : 7.04 Lakh
Government Departments No of Bidders 8
Contract Date: Ref. Documents Contract Value : 42,055
Government Departments No of Bidders 4
West Bengal View Result →
Contract Date: Ref. Documents Contract Value : 22.65 Lakh
Government Departments No of Bidders 3
Uttar Pradesh View Result →
Contract Date: Ref. Documents Contract Value : 19.47 Lakh
Government Departments No of Bidders 4
Uttar Pradesh View Result →
Contract Date: Ref. Documents Contract Value : 6.01 Lakh
Government Departments No of Bidders 2
Contract Date: Ref. Documents Contract Value : 9.32 Lakh
Government Departments No of Bidders 3
Contract Date: Ref. Documents Contract Value : 8.91 Lakh
Government Departments No of Bidders 6
Contract Date: Ref. Documents Contract Value : 2.59 Lakh
Government Departments No of Bidders 5
Contract Date: Ref. Documents Contract Value : 9.88 Lakh
Government Departments No of Bidders 4
Madhya Pradesh View Result →
Contract Date: Ref. Documents Contract Value : 13.78 Lakh
Boards / Undertakings / PSU No of Bidders 1
TenderDetail
Loading tenders