}

Construction, Water Storage and Supply, Water Supply Project, Civil Construction, Civil Work, Multi State-Multi State

Shipping Corporation Of India Limited has published Construction, Water Storage and Supply, Water Supply Project, Civil Construction, Civil Work. Submission Date for this Tender is 20-08-2014. Water Supply Project Tenders in Multi State Multi State. Bidders can get complete Tender details and download the document.




Tender Notice

6284346
Construction, Water Storage and Supply, Water Supply Project, Civil Construction, Civil Work
Open Tender
Indian
Multi State
Multi State
20-08-2014

Tender Details

Orv Sagar Manjusha Drydock / Repairs Quotation 2014-15 Yards To Quote Their Cost/ Rates As Given In This Format Only -Against All The Items Specified Herewith (In Bid Price / Rate - Column L) General Services And WharfageItem : General Services And Wharfage Maker : Work Specifications :Wharfage:Vessel To Be Safely Berthed At A Suitable Yards Repair Berth When Vessel Is Not In Drydock. Services Indicated In Paras 2 To 18 Below, Are To Be Provided At The Repair Berth As Well As In The Drydock, As Required. Please Quote Total Lumpsum Berth Hire Charges Towards WharfageMooring And Unmooring :Mooring, Unmooring And Shifting With The Assistance Of Pilot, Required Number Of Tugs, Riggers And Boatsman. For Berthing On Repair Berth On Vessels Arrival.For Unberthing To Enter Drydock. For Berthing At The Repair Berth Again Only If Required After Undocking.For Unberthing From Repair Berth For Sailing.N.B. : If Vessel Is Shifted For Yards Convenience, Owners Would Not Be Liable For Charges For Same.Fire Precautions :To Supply Sea Water For Ships Fire Main Lines At All Times . Pressures In The Fire Main Line On Deck To Be Maintained, Atleast At 2.8 Kgs Per Cm Sq. So That Minimum 2 Fire Hoses Can Be Used Simultaneously In Case RequiredTo Provide One Fire Watchman During Entire Period Of Vessels Stay In Yard Premises.Security Guard : One Security Guard To Be Provided Daily For The Duration Of Vessels Stay At The Yard.Garbage Disposal : To Remove Galley Refuse Once Per Day. To Provide One Sewage Holding Portable Tank And The Same To Be Connected To Main Sanitory Line Till The Ship`S Sewage Treatement Plant Remains Un OperationalAt The Written Request Of Ships Staff, To Provide, As And When Required, Shore Crane Services For Lifting Of Ships Stores, Spares, Provisions Etc; On Board. Quote Charges Inclusive Of Slings And Riggers.Estimated Requirement __2_ Hrs Daily. Please Quote LumpsumPlease Note:Yard Must Get The Total Time Crane Used For Each Occasion Certified By Ships Staff, Showing Therein Date And Hrs. Of Each Crane Usage.Gas Free / Hot Work Certificates : Yard To Arrange For Govt. / Authorised Explosive Inspectors For Obtaining Gas Free Certificate / Hot Work Certificate For Compartments / Tank, On Board, As Required During The Repair Period.Assume __3__ Compartments To Be Certified Periodically.Telephone Connection : Yard To Provide One Temporary Telephone For Ships Use During The Entire Repair Period With Facility For Local Calls Only(International Call Subscriber Dialing Barred)Fresh Water : Yard To Supply Fresh Water For Ships Domestic Use As And When Required.Total Estimated Requirements ___04_____ Tons Per Day Plus ___260____ Tons Cooling Water :Yard To Supply Cooling Water For Fridge And/Or Air Conditioning Units During The Time When Vessel Is In Dry Dock Assume Supply Through One Line.Please Note : In Case Cooling Water Supply As Above Is Common With Fire Main Line, Yard To Take Adequate Pressure Is Maintained In Fire Main Line At All Times.Ballast Water : Yard To Fill Ballast Water Using Yards Pumps In Say_06____ Ballast Tanks, As Required In _4____ Hrs. Estimated Quantity Of Ballast Water To Fill In _100 TonsN.B : Yard To Quote Rate Including Rigging / Unrigging Of Yards Pumps And Due Attendance During The Ballasting Operation.De-Ballasting :Yard To De-Ballast Water Using Yards Pumps For De-Ballasting. In Say _06____ Number Of Ballast Tanks As Required In __4__ Hrs.  Estimated Quantity Of Ballast Water To Pump Out _100_ Tons.The Rate Quoted By The Yard To Include Rigging / Unrigging Of Yards Pumps And Attendance During De-Ballasting Operation.Wooden Plugs :Yard To Provide And Fix __12__ Numbers Of Wooden Plugs With Spouts To Scuppers And Pipes Of The Vessel In Drydock.Trial Berth :Yard To Arange And Provide Trial Berth, If Considered Neccesary By Attending Superintendant . Charges Quoted To Be On The Basis That Trial Berth Required For _4___ Hours Duration And Inclusive Of Neccesary Assistance During The Trial. Scrap Removal :Yard To Arrange For Removal Of Scrap/Condemned Stores From Deck On All Inclusive Basis. Scrap Estimated To Be Removed Is ___06___ TonsA) All Ventilation Intakes On The Main Deck To Be Covered Prior Grit Blasting. B) All Port Holes To Be Covered Before Grit Blasting And During Painting And Cleaned After Completion Of Works. Fumigation Of Entire Ship To Be Carried Out.Drydocking : Vessel To Be Safely Docked In A Suitable Drydock On Blocks Of Adequate Height As Per The Ships Docking Plan. Please Quote For Total Dry-Dock Hire Charges For Total Period Of Dd On Lumpsum Basis. Please Note Work To Be Continued On Weekends And Holidays. Above Should Include Charges For All Required Shoring & Diver. While Estimating The Total Time Required In The Dry Dock,Work Specified In Our Repair Specification D14051 To D14068 To Be Taken Into Consideration. An Allowance For Upto 25% Extra Work To Be Taken Into Account For Additional Works.H.P.Washing :1)       All External Surfaces Of The Hull To Be Cleaned With High Pressure Fresh Water Jets To Remove All The Fouling And Salt Deposits At A Pressure Not Less Than 90Kg/Cm Sq.2)Total Surface Area Is 980 Sq Mtrs. Above Water Area _240__ Sq Mtrs. Under Water Area_740_Sq Mtrs. 3)  Normal Light Scraping To Be Carried Out On 30% Of Under Water Area,Mentioned In The Above H.P Washing.Fresh Water Washing :All External Surfaces Of The Hull To Be Washed With Fresh Water To Remove All The Dirt/ Dust Particles Before Applying Coats.For Areas Refer 2(2) Above.Thickness DeterminationThickness Detemination (Utg) As Per Surveyor RecommendationsGrit Blasting And Painting :Grit Blasting To Be Carried Out To Sa2.5 Standard And Edge Of Grit Blasted Areas To Be Smoothened Back To A Firm Edge.3)       Owners Representative Will Inspect All Blasted Areas Before Application Of Any Paint.Above Water Area : 240Sq, MEstimated Area For Grit Blasing Is _240__ Sq.Mtrs.Painting As Per Painting SchemeEpoxy Primer Grey - T/Up (15 Microns)C.R. Primer Ltgrey - T/UpCrhb Primer Dk Grey - T/UpCrhb Primer Lt Grey - T/UpPolyurithine White - Full CoatUnder Water Area : 740 Sq MEstimated Area For Grit Blasting _740 Sq.Mtrs.Painting As Per Painting SchemeEpoxy Primer Grey - T/UpVinyl Tar Epoxy Black - T/UpVinyl Tar Epoxy Brown - T/UpVinyl Tar Epoxy Black - T/UpSpc Antifouling Red - T/UpSpc Antifouling Lt. Red - F/CoatSpc Antifouling Red - F/CoatPaint Ships Name, Por, Draft & Freeboard Marks (Finish Black) Aprox Area-5M2)Weather Decks: Exposed Decks Of Deck Houses To Spot Chip & Paint (Area 900 M2).(2 Coats Primer & 1 Coat Finish) Deck Fittings To Spot Chip & Paint (Area 300 M2) Apply 2 Coats Primer & 1 Finish Coat)To Paint Forward( Port & Stbd), Midships( Port & Stbd) & Aft Draft Marks (Stern,Port &Stbd),Mark For Bow And Stern Thrusters.To Paint Ships Name In Hindi & English On Port And Starboard Bows And Also On Stern, Port Of Registry ,Owners Logo On Funnel And Imo Number(Port & Stbd)To Remove ,Re-Fit And Seal Bottom Plugs 27 Nos. Remove Manhole Covers And Box Up Same With New Rubber Packing Joint For Ballast/ Fresh Water Tanks/Oil Tanks ,Void Spaces And Trunking Area.Estimated Manhole Covers To Be Opened /Boxed Up Is To Renew Damaged Stainless Steel Studs 23Mm Dia For Approx. 200 Nos. Studs And Nuts ___ 200 ___ NosTo Replace Missing Cap Nut For Approx 100 NosAnchor,Cables,Chain LockersRepair Specification: D14053 Item No:Anchor,Cables,Chain Lockers Capacity / Other Details: T, Mm Dia Of Chain.Work Specification:Both Anchor Chains To Be Ranged In The Drydock And High Pressure Washed.06 Length Port And 07 Length StbdGrit Blasting Of Anchor Chain Both Port & Stbd And Markings.Guaging Of Anchor Chain To Be Carried Out After Ranging The Chain On The Dock. Check The Swivel , Anchor Shackles And The Kenter Shackles. Secure Back In Position After The Work.Both Port And Stbd Anchors To Be Shown To The Surveyor , Work To Be Carried Out As Per Surveyors Recommendation.Chain LockersChain Lockers To Be Demucked.Grit Blasting Of Entire Chain Locker Including Hawse Pipe And Spurling Pipe.Bituminous Coating02 Nos Hawse Pipe Covers And Locking Arrangements To Be Renewed.Windlass Gypsy Teeth Has Got Clearance & More Play ,Same To Be Repair/ReplaceAnchor To Be Examined By Irs Surveyor Spare Anchor To Be Provided As Existing Steel Renewal-Shell And Inside TanksRepair Specification No D:14054 Item:Steel Renewal-Shell And Inside Tanks Maker: Capacity And Other DetailsAfter The Docking Survey,As Recommended By The Class Surveyour,Damaged Hull Plate To Be Renewed As And Where Required.Quote An Estimated 8 Tons Steel Renewal.Please Note:Cost To Include Staging/Lighting,Testing Charges.Steel Shall Be Of Yard Supply.Cropping And Renewal Of Hull Steel : (Plate 6 To 12.5Mm Thick) Steel Gr. Is 2062 And Should Have Approval From The Irs Class3.5 Mm6 Mm8 Mm10-12 MmNote: ▪Should Include Staging, Cleaning Removal/Refit Of Obstructions/Insulations/Bulkheads/Ndt ▪Bulkhead Should Be Renewed By The Bidder At No Extra Cost,If Damaged While Removing ▪ The Bulkheads Which Are Renewed Should Be Of Same Color And Quality Above Rate Applicable For Structural Members Cropping And Renewal Of Deck Plates : Steel (Plate 6 To 12.5Mm Thick) Steel Gr. Is 2062 And Should Have Approval From The Irs Class6 Mm8 Mm10-12 MmNote: ▪Should Include Staging, Cleaning Removal/Refit Of Obstructions/Insulations/Bulkheads/Ndt ▪Bulkhead Should Be Renewed By The Bidder At No Extra Cost,If Damaged While Removing ▪ The Bulkheads Which Are Renewed Should Be Of Same Color And Quality Above Rate Applicable For Structural Members A Frame▪ Wasted And Corroded Topside Railings To Be Cropped And Renewed As Per Existing. Approx Length - 50Mtrs. ▪ After Spot Chipping Wasted And Corroded Stiffners And Rusted Bolts And Nuts To Be Renewed.Shipside AnodesRepair Specification No:D14055 Item:Shipside Anodes Supplier : Niot/Sci Renewal Of Anodes (Al Alloy Anode)Cutting And Removal Of Old Anodes 11.5 Kgs (12.85 Gross Wt)Cutting And Removal Of Old Anodes 2.505 Kgs (3.105 Gross Wt)Welding Of New Anodes (11.5 Kgs) Fillet Weld Size Should Be 6 MmWelding Of New Anodes (2.505 Kgs) At Sea ChestsGreasing Of Anodes And Cleaning After PaintingIcaf System To Be Overhauled Completely And Anodes To Be Renewed. Oem Address As Follows - Corrosion & Water Control Bv Herenwerg 58-2751 Db P.O Box No 47-2750 Aa Moerkapelle The Netherlands Main Deck /Poop Dk/Fcle Dk PaintingRepair Specification No:D14056 Item:Main Deck/Poop Dk/Fcle Dk Painting Maker: Capacity /Other Details Work Specification:Deck Painting Including Forecastle Deck ,Boat Deck And Monkey Island. Painting As Per Painting Scheme. 5% Of Total Area To Be Spot Chipped / Power ToolingFinal Coat Should Be Anti Skid Paint Color Should Be Deck GreenFunnel Port And Stbd▪ Funnel Outside Copper Slag Or Quartz Blasted(Power Tooling) ▪ Funnel Inside Quartz/Copper Slag Blasted(Power Tooling)▪ Funnel Outside To Be Painted As Per Painting Scheme And Finish Black. ▪ Funnel Inside To Be Painted As Per Painting Scheme And Final Coat AluminiumHatch Covers (Main Deck Bouy Hold Skylight)▪Hatch Cover Inside Grit / Copper Slag Blasted Sa 2.5▪Hatch Cover Out Side Grit / Copper Slag Blasted Sa 2.5Hatch Cover To Be Painted As Per Painting Scheme And Final Finish Coat Of Epoxy.Hatch Cover Out Side To Be Painted As Per Painting Scheme And Final Finish Coat Of Epoxy.Aft Deck Wooden Sheathing To Bepainted With Two Coats Of Bituminous Anti Skid Coating .BulwarkBulwarks Inside Quartz/Copper Blasted(Sa 2.5)Bulwarks Inside To Be Painted As Per Painting Scheme And Finish Surf GreyMastsFwd Mast,Main Mast,Stern Post Grit Blasted (Minimum Of St 2 Iso 8501-1 Or Sspc-Sp2)Fwd Mast,Main Mast,Stern Post To Be Painted As Per Painting Scheme And Final Finish White Coatpainting Scheme And Final Aft Deck Wooden Sheathing Given Two Coats Of Bituminous Coating▪ All Weather Deck Mushroom Ventilation Trunks Inside Grit Blasted (Minimum Of St2 Iso 8501-1 Or Sspc-Sp2) ▪ Ventilation Trunks Inside To Be Painted As Per Painting Scheme And Final Finish Coat White.Bouy Hold▪Flooring Area To Be Power Tooled And Power Brushing. Total Area- 80 Sq.M ▪ Painting As Per Painting Scheme. Total Area - 80 Sq.M▪Inside Hold Stores To Be Taken Out And After Painting Rearrange▪Deck Heads And Bulkheads To Be Power Tooled And Power Brushing By 10% Of Total Area. Total Area - 360 Sq.M ▪Apply 2 Coats Of Primer And One Coat Of Finish Light Grey. Total Area - 360 Sq.MSuper Structure▪Deck House Exterior Superstructure Outside Exposed Bulkheads To Be Spot Chipped By 5% Of Total Area . ▪ Apply Two Coats Of Primer And One Coat Of Finish White. Total Area - 720 Sq.M (Includes Wheel House , Foxle Deck Area And Main Deck Area)Galley And Crew Mess Room Bilge Area To Be Sand Blasted And Painted As Per Painting Scheme. Bilge Cover Plates Corroded And Same To Be Renewed.(1 Sq M X 6 Nos)Bollards And Fairleads▪Bollard And Fairleads Grit / Copper Slag Blasted Sa 2.5. Total No Of Bollards - 10 Nos & Fairleads - 14 Nos. ▪Painting As Per Painting Scheme.A Frame▪A Frame To Be Spot Chipped (10% Of Total Area), Primered And Painted. Total Area - 90 Sq.M ▪Painting As Per Painting Scheme.Anti Heeling Tank ▪Anti Heeling Tank To Be Spot Chipped(15% Of Total Area) , Primered And Painted. Total Ares - 120 Sq.M ▪Painting As Per Painting Scheme.Hatch Covers (Bouy Hold Skylight) RepairsRepair Specification No:D14057 Item:Hatch Covers(Bouy Hold Skylight) Repairs Work Specification: After Grit Blasting Wasted And Corroded Stiffners To Be Renewed . Bouy Hold Pontoon To Be Aligned For Proper Closure. Compression Bar Thickness Of Bouyhold To Be Checked And Modified For Alignment Of Pontoons. Cleats To Be Eased.02 Nos Of Scuppers To Be Provided From Drain To Shipside. Approx Length 4 Mtrs Per Drain LinePacking To Be Renewed Approx Length 18Mtrs. Packing Dimensions As Per Existing Buoy Hold Tank Top To Chip & Painted Area 80 M2 (2 Primer & One Finish Coat)Demucking/Painting Of Ballast/Fw TanksRepair Specification No:D14058 Item:Demugging/Painting Of Ballast/Fw Tanks Maker: Capacity/Other Details: Work Specification: Fresh Water Tank Painting(Fr No:47-59) Port & Stbd 02 NosScraping Chipping Wire Brushing Removal Of MuckPower BrushingLow Pressure Washing Cleaning Mopped With Cotton WasteWith Approved Paints As Per Painting SchemeFilling Fresh Water And Curing 2 Times Removal And Refitting Of Manhole Cover With New Gaskets, Bolt And NutsA.)Forepeak Tank(Fr 91-Fwd) To Be Demugged And Cleaned. B.)Manhole Cover Rubber Packing Renewed - 100 Rmt C.)Spot Derusting With Power Tool And Apply Two Coats Of Paint(Bituminous) D.)Painting As Per Painting Scheme A.)P & S Water Ballast Tanks(Fr 12-20) To Be Demugged And Cleaned.Each 6.6 Cu.M B.)Manhole Cover Rubber Packing Renewed C.)Spot Derusting With Power Tool And Apply Two Coats Of Intertuf 16 (Bituminous) D.)Painting As Per Painting Scheme A.)P & S Water Ballast Tanks(Fr 70-81) To Be Demugged And Cleaned.Each 21 Cu.M B.)Manhole Cover Rubber Packing Renewed C.)Spot Derusting With Power Tool And Apply Two Coats Of Intertuf 16 (Bituminous) D.)Painting As Per Painting Scheme A.)Center Water Ballast Tanks(Fr 10-20) To Be Demugged And Cleaned 22 Cu.M B.)Manhole Cover Rubber Packing Renewed C.)Spot Derusting With Power Tool And Apply Two Coats Of Intertuf 16 (Bituminous) D.)Painting As Per Painting Scheme A.)Void Space(P & S) To Be Derusted By Power Tool, Bulkheads Spot Derusted And Apply Two Coats Of Paint B.)Manhole Cover Rubber Packing Renewed D.)Painting As Per Painting Scheme A.)Cofferdam(P & S) To Be Derusted By Power Tool And Apply One Coat Primer And One Coat Of Paint. B.)Manhole Cover Rubber Packing Renewed D.)Painting As Per Painting Scheme Port & Stbd Rescue Boat Davits / Lsa / FfaRepair Specification No:D14059 Item: Lsa/Ffa Maker: Hemant Engineering ,Mumbai Capacity/Other Details:1 Ton Work Specification: Both Rescue Boat Davit Annual Servicing To Be Carried Out Annual Service Due - 02.09.2014.Both Rescue Boat Davit 5- Yearly Inspection To Be Carried Out 5 - Yearly Inspection Due - 15.09.2014.Fall Wire To Be Renewed L-40 Mtr(6X37) Dia-12MmMushroom VentilatorsRepair Specification No:D14060 Item:Mushroom Ventilators Maker:Ship Yard Capacity/Other Details:Total 10 Nos.Mushroom Ventillators Located On Main Deck(4) ,Focscle Deck(2),Monkey Island(1)Nos,Boat Deck (3). Work Specification: All Mushroom Ventilators Heads To Be Dismantled And Taken Ashore And Overhauled.Inside Area Of The Ventillator Top Covers And Valve Lid To Be Grit Blasted Upto Sa 2.0 Standard.Approx Area Of Each Ventilator To Be Blasted Is 1 Sq M.Painting As Per Painting Scheme.Wasted And Corroded Wiremesh To Be Renewed.Seat Packing Of The Ventilators To Be Renewed.Spindle Of All Mushroom Ventilators To Be Checked And Inspected For Damages.Any Corroded And Wasted Area To Be Cropped And RenewedAir Pipes/Vents On Deck:Repair Specification No:D14061 Item:Air Pipes/Vents On Deck Maker: Capacity/Other Details: Workspecification: All The Air Vent Heads Of Ballast Tanks,Void Spaces,Fuel Oil Tanks And Passage Ways To Be Removed From Place,Cleaned ,Inspected And Painted.Damaged And Worn Out Neoprene Rubber Seat Rings,Wire Mesh And Floats To Be Renewd. Stud Pipes To Be Removed From Place & Inspected And Necessary Repair Work/Renewal To Be Carried Out.Wbt - 6 Nos, F.O - 6 Nos Fw - 2 Nos, Void Space-2 Nos, Cofferdam-2 Nos Bilge Water-1 Nos, Shaft Tunnel - 2 Nos Pipe Duct - 2 Nos Lo - 2 Nos ,Dirty Oil - 1 Nos , Waste Water Tank - 1 Nos, Emg Gen Do Tank -1 Nos, Sewage Holding Tank - 1 Nos Bridge Equipments Repair Specification No:D14062 Item:Bridge Equipments Maker: Model: Workspecification: Installation Of Bnwas (Bridge Navigational Watch Alarm System) Anemometer To Be Serviced Or Replaced Installation Of Bnwas (Bridge Navigational Watch Alarm System) Repair Specification No:D14063 Item: Miscellaneous Repairs Maker: Capacity/Other Details: Workspecification: Miscellaneous Repairs▪Tow Wire Rope Eye To Be Renewed (Note : Approx 30M Length The Wire Rope Kink Is There , Same To Be Cropped And Eye To Be Made ) Deep Sea Winch▪Deep Sea Winch Wire Rope Is Damaged (Badly Kinked) In 30 M, 1800 M And 2200 Mt Length. Wire To Be Inspected/Load Tested For Further Use. Wire Size: 4500M X 20 Mm, Swl 12 T ▪Deep Sea Winch Cabin Base Corroded , Same To Be Cropped And Renewed. Approx L X B (1.5M X 1.3M) ▪Operating Panel To Be Dismantled And Fitted Back. Deep Sea Winch Depth Measuring Device Not Operational. To Be Repaired.▪Acyrlic Sheet Of Deep Sea Winch Cabin To Be Renewed As Per Existing Dimensions, Approx L X B (A.)1.5M X 1.2M - 01 Nos (B.)1.9M X 0.7M - 02Nos ▪ Packing To Be Renewed As Per Existing . Total Approx Length - 20MtrsCdt WinchCtd Winch To Be Overhauled And Depth Monitoring Device To Be Fitted.Ctd Winch Wire Rope Present Length 380 M(6 Mm X 380 M) Is Damaged At Various Lengths. Ctd Winch Wire To Be Replaced And Length Of Wire Should Be Increased To 1000 M (6 Mm X 1000M With Coating) Of Same Specifications.Funnel RepairsCorroded 02 Nos (P & S) Funnel Luvers & Wiremesh To Be Cropped And Renewed . Approx L X B (0.9M X 0.9M)Corroded 01 Nos Port Side Funnel Top Fish Plate To Be Cropped And Renewed. Approx L X B (2M X 0.08M)Corroded 01 Nos Port Side Funnel Scupper Line To Be Cropped And Renewed. Approx Length 1MCorroded Rubber Packing Channel Of Both (P & S) Funnel Flap To Be Cropped And Renewed. Approx L X B (0.92M X 0.92M)Exhaust Line Of Main Engine And Aux Engine To Be Checked And Necessary Steel Renewal To Be Carried OutNat VentCo2 Nat Vent Luvers & Flap To Be Cropped And Renewed. Approx L X B (0.32M X 0.25M)Ceo Cabin Fxle Deck Stbd Side Nat Vent Luvers To Be Cropped And Renewed. Approx L X B (0.24M X 0.24M) 02 NosAhu Supply In/Supply Out Vent Luvers And Wire Mesh To Be Cropped And Renewed. Approx L X B (0.81M X 0.57M) 02 Nos▪Stbd Side Crane Inspection Door Corroded To Be Cropped And Renewed. Approx L X B (0.67M X 0.72M). Vertical Ladder To The Crane And The Guide Railings To Be Renewed On Both Port And Stbd Crane (Approx L Xb 3X3 Meters On Each Crane)Port Holes ▪ Square Type Port Holes Approx L X B (0.61M X 0.45M) 20 Nos Rubber Packing To Be Renewed As Per Existing. Twenty Both Squre And Round Type Port Holes Draining Channel To Be Cropped And Renewed. ▪ Round Type Port Holes Approx Od-0.3M 18 Nos Rubber Packing To Be Renewed As Per Existing.04 Nos Round Type Port Holes On Tank Top To Be Checked & Necessary Repairs To Be Carried Out As Per Survey Requirement Ships Scupper Lines To Be Cleaned/Flushed From Scupper To OverboardCtd Winch Platform To Be Aligned And Hinges To Be Renewed As Per Existing And Necessary Steel Renewal To Be Carried Out.Fender Bar On Stab Side Ship Side( Between Fr -5 To -8) Dented Inward. Aprx. Length 1M.Ship Side Plate On Port Side (Between Fr 14-18) Dented Inward. Aprx Lxb 2M X 2 M.Ship Side Plate On Starboard Side (Between Fr 10 To 14) Dented Inward Aprx Lxb= 1Mx1 MFire Hose Box- Glass Panel Broken To Be ReplacedAccomodation RepairsRepair Specification No:D14064 Item:Accomodation Repairs Maker:Capacity/Other Details: Workspecification: Chief Scientist Cabin/Lab : ▪Chief Scientist Carpet To Be Renewed As Per Existing. Approx (L X B) 5.5Mtrs X 3.5Mtrs ▪Lab Carpet To Be Renewed As Per Existing. Approx (L X B)6.5Mtrs X 3.5Mtrs Chief Scientist Cabin/Lab : ▪Chief Scientist Carpet To Be Renewed As Per Existing. Approx (L X B) 5.5Mtrs X 3.5Mtrs ▪Lab Carpet To Be Renewed As Per Existing. Approx (L X B)6.5Mtrs X 3.5Mtrs * Conference Room Carpet To Renew Area 5.5 X 3.5 M Flooring : Poly Vinyl Flooring To Be Renewed In The Following Cabins: A.)Scientists Cabin Port Fwd Approx Length (3.5M X 3.5M) B.)Scientists Cabin Port Aft Approx Length (3.5M X 3.5M) C.)Wheel House Approx Length (6.0M X 6.0M) D.)Crew Mess Room Approx Length (6.0M X 4.0M) E.)Galley Alleway Approx Length (8.6M X 1.6M)Bathroom Hot And Cold Water Mixing Valve Is Defective. Repair/Servicing.If Beyond Economical Repair The Same Can Be Renewed With Reputed Brand. Location : A.)Common Toilet B.)4 Scientists Cabin Stbd C.)2 Scientists Cabin Port Fwd D.)2 Scientists Cabin Port Middle E.)2 Scientists Cabin Port AftBathroom Hot And Cold Water Mixing Valve Is Defective. Repair/Servicing.If Beyond Economical Repair The Same Can Be Renewed With Reputed Brand. Location : A.)Common Toilet B.)4 Scientists Cabin Stbd C.)2 Scientists Cabin Port Fwd D.)2 Scientists Cabin Port Middle E.)2 Scientists Cabin Port AftWash Basin Hot And Cold Water Mixing Tap Is Defective. Repair/Servicing.If Beyond Economical Repair The Same Can Be Renewed With Reputed Brand. Location : A.)Common Toilet Port Side Aft B.)4 Scientists Cabin Stbd Wash Basin Hot And Cold Water Mixing Tap Is Defective. Repair/Servicing.If Beyond Economical Repair The Same Can Be Renewed With Reputed Brand. Location : A.)Common Toilet Port Side Aft B.)4 Scientists Cabin Stbd Toilet Seat Cover To Be Renewed As Per Existing Location : A.)Chief Scientists Cabin B.)2 Scientists Cabin Port Fwd C.)2 Scientists Cabin Port Middle D.)2 Scientists Cabin Port Aft E.)Common Toilet F.)4 Scientists Cabin StbdFresh Water Tap For The Following Places To Be Renewed : Location : A.)Common Toilet B.)4 Scientists Cabin StbdDoor Closer For The Following Places To Be Renewed : Location : A.)Chief Scientists Cabin B.)Main Deck Staircase Entrance Door C.)Foxle Deck Aft Entrance Door Crew Toilet 02 Nos Water Closet Stainless Steel To Be Renewed. Crew Toilet Main Entrance Door To Be Repaired And Latches To Be Renewed.Laundry Room Entrance Door To Be Repaired And Latches To Be Renewed.2 Crew Middle Port Cabin Door Latches & 02 Nos Hinges To Be RenewedAccomodation Staircase From Main Deck To Tank Top 02 Nos Aluminium Feding To Be Renewed (Approx Length - 86 Cm)Conference Room Door Latches To Be Renewed2 Scientists Cabin Port Aft Sofa Rexin Cover To Be Renewed (Approx L X B - 1.7 M X 0.7 M) 2 Crew Middle Port Cabin Door Latches & 02 Nos Hinges To Be Renewed. Ac Regulating Valve In 3 No Scientist Cabins To Be Freed.Bulkhead As Per Existing In The Following Places To Be Renewed : A.)Common Toilet Port Side Aft (Approx L X B - 2M X2.5M) A.)4 Scientist Cabin Toilet (Approx L X B - 2 M X1m)Flush Valves (In Duct Space) And Attach Lines To Be Checked/Overhauled/Renewed. The Flush Valves And Butterfly Valves To Be Serviced/Overhauled And Renew If Necessary. The Lines Are Corroded And Wasted , Same To Be Renewed.▪No Of Flush Valves - 13 (2 Scientists Cabin Port Aft/Middle/Fwd , 4 Scientists Stbd , Chief Off , 2Nd Off , 3Rd Off , 4Eo , Elo, 2Eo, Ceo, Chief Scientist, Master) ▪No Of Butterfly Valves - 7 (2 Scientists Cabin Port Aft/Middle/Fwd , 4 Scientists Stbd , 4Eo , Elo, 2Eo. ▪No Of Lines - 7 (Approx Length - 0.75 M Each) (2 Scientists Cabin Port Fwd , Chief Off , 2Nd Off

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail